Loading...
HomeMy WebLinkAboutTHE PARK TOWNHOMES AT FOSSIL RIDGE - Filed SEPD-SURFACE EXPLORATION/PAVEMENT DESIGN REPORT - 2017-12-144396 GREENFIELD DRIVE WINDSOR, COLORADO 80550 (970) 970-545-3908 FAX (970) 663-0282 www.earth-engineering.com September 7, 2017 (Revised from August 30, 2017) Manhattan Land Company, LLC c/o Cushman & Wakefield 772 Whalers Way #200 Fort Collins, Colorado 80525 Attn: Mr. Russell Baker (Russell.Baker@cushwake.com) Re: Subsurface Exploration/Pavement Design Report Ziegler Apartments – 5405 Ziegler Road Ziegler Road and County Fair Lane Improvements Fort Collins, Colorado EEC Project No. 1174067 Mr. Baker: Earth Engineering Consultants, LLC (EEC) personnel have completed field and laboratory testing in general accordance with the Larimer County Urban Area Street Standard (LCUASS) Pavement Design criteria, of in-place subgrades for proposed roadway widening/improvements along Ziegler Road and County Fair Lane, associated with the Ziegler Apartments development in Fort Collins, Colorado. At the time of our field exploration, the subgrades for the selected roadways were near approximate “rough” final subgrade elevations and the main sanitary sewer and water lines and services had been installed. Results of the subgrade evaluation and pavement thickness recommendations, based on those test results and estimated 18-kip equivalent daily load application (EDLA) values for this portion of the development, are provided with this report. Pavement related test borings for this evaluation were completed at three (3) locations (identified herein as P-1 through P-3) to evaluate the subgrade conditions for the proposed roadway widening/improvements sections. The borings were extended to approximate depths of 5 feet in the boring located over the sanitary sewer line (boring B-3), and 10 feet in the remaining borings. A site diagram indicating the approximate roadway alignments evaluated as part of this assessment and the approximate boring locations are provided with this report. Site photographs of the property at the time of our exploration are also provided with this report. Test borings were taken at the points indicated on Ziegler Road and County Fair Lane. Earth Engineering Consultants, LLC Ziegler Apartments Pavement Design EEC Project No. 1174067 September 7, 2017 (Revised from August 30, 2017) Page 2 Laboratory testing on the recovered samples included moisture content tests of all samples, in- situ dry density of appropriate samples, and an evaluation of the unconfined strength of selected samples with a calibrated hand penetrometer. Atterberg limits and washed sieve analysis tests were completed on selected samples to evaluate the quantity and plasticity of the fines in the subgrade soils. In addition, swell/consolidation tests were completed on selected samples to evaluate the soils’ tendency to swell with increased moisture content at current moisture and density conditions. These swell/consolidation tests were completed with the loading criteria as recommended in the LCUASS Pavement Design guideline using an inundation/preloading criteria of 150 psf. Results of the outlined tests are indicated on the attached boring logs and summary sheets. As a part of the testing program, all samples were examined in the laboratory and classified in general accordance with the attached General Notes and the Unified Soil Classification System, based on the soils’ texture and plasticity. The estimated group symbol for the Unified Soil Classification System is indicated on the boring logs and a brief description of that classification system is included with this report. Based on the results of the field borings and the laboratory testing, subsurface conditions can be generalized as follows. Subsurface soils observed within the test borings, consisted of either fill material and/or native soils generally classified as lean clay with sand. The subgrade soils were generally moist in-situ; were medium stiff to stiff and exhibited low swell potential characteristics. The lean clay with sand subsoils extended to the bottom of the borings at depths of approximately 5 to 10 feet below present site grades. Observations were made while drilling and after completion of the borings to detect the presence and depth to hydrostatic ground water. No free water was observed in the borings at the time of drilling to maximum depths of exploration. Fluctuations in groundwater levels can occur over time depending on variations in hydrologic conditions and other conditions not apparent at the time of this report. Longer term observations in cased holes sealed from the influence of surface water would be required to evaluate long term water level fluctuations. Earth Engineering Consultants, LLC Ziegler Apartments Pavement Design EEC Project No. 1174067 September 7, 2017 (Revised from August 30, 2017) Page 3 ANALYSIS AND RECOMMENDATIONS Swell – Consolidation Test Results The swell-consolidation test is performed to evaluate the swell or collapse potential of soils to help determine foundation, floor slab and pavement design criteria. In this test, relatively intact samples obtained directly from the California barrel sampler are placed in a laboratory apparatus and inundated with water under a predetermined load. The swell-index is the resulting amount of swell or collapse after the inundation period expressed as a percent of the sample’s initial thickness. Samples obtained at the 1 or 2-foot interval are generally pre-loaded and inundated with water at an approximate 150 pounds per square foot (psf) increment to simulate the pavement loading conditions in general accordance with LCUASS Pavement Design criteria. After the inundation period, additional incremental loads are applied to evaluate swell pressure and consolidation response as appropriate. For this assessment, we conducted a total of three (3) swell-consolidation tests on subgrade samples collected from approximate depths of 1 to 2-feet below existing site grades. The swell index values for the soil samples tested at the 150-psf inundation pressures revealed relatively low swell characteristics on the order of (+) 0.9 to (+) 1.5%. The average swell index for the borings was less than the LCUASS maximum allowable 2% criteria used to determine if a swell-mitigation plan is necessary. Based on these results, in our opinion, a swell mitigation plan is not necessary. Subgrade preparation for the roadways within the Ziegler Apartments development should be completed in general accordance with the recommendations presented in the LCUASS Pavement Design Manual – Chapter 22. Pavement Subgrade Preparation Based on the testing completed, it appears the in-place cohesive lean clay with sand subgrade soils could be used for direct support of the roadways and for roadway subgrade fill provided adequate moisture treatment and compaction procedures are followed. Those procedures would Earth Engineering Consultants, LLC Ziegler Apartments Pavement Design EEC Project No. 1174067 September 7, 2017 (Revised from August 30, 2017) Page 4 generally include placement in loose lifts not to exceed 9 inches thick and adjustment in moisture content, 2% of optimum moisture content for generally cohesive type soils or 3% for cleaner granular type soils, and compaction to at least 95% of the materials maximum dry density as determined in accordance with ASTM Specification D698, the standard Proctor procedure. If the site lean clay with sand soils are used as fill material, care will be needed to maintain the recommended moisture content prior to and during construction of overlying improvements. All existing vegetation, and apparent unsuitable fill materials should be removed from the site improvement areas. After removal of unacceptable or unsuitable subsoils, removal of over excavation materials, and removal of any previous fill material, and prior to placement of fill and/or site improvements, the exposed soils should be scarified to a depth of 9 inches, adjusted in moisture content to within (+/-) 2% of standard Proctor optimum moisture content for essentially cohesive soils or to a workable moisture content for essentially granular materials and compacted to at least 95% of the material's standard Proctor maximum dry density as determined in accordance with ASTM Specification D698. Fill materials used to replace the over excavated zone and establish grades in the pavement/flatwork areas, after the initial zone has been prepared as recommended above, should consist of approved on-site soils or imported structural fill material which is free from organic matter and debris. Approved structural fill materials should be graded similarly to a CDOT Class 5, 6 or 7 aggregate base with sufficient fines to prevent ponding of water within the fill. Structural fill material should be placed in loose lifts not to exceed 9 inches thick, adjusted to a workable moisture content and compacted to at least 95% of standard Proctor maximum dry density as determined by ASTM Specification D698. Proofrolling and recompacting the subgrade section is recommended immediately prior to placement of the aggregate road base section. Soft or weak areas delineated by the proofrolling operations should be undercut or stabilized in-place to achieve the appropriate subgrade support. Moisture conditioning the site subgrade soils could result in pumping subgrade conditions with elevated moisture contents in the subgrades. If pumping is observed, stabilization of the subgrades with the addition of Class C fly ash would be required. Additional recommendations can be provided at time of the proof roll observation. Earth Engineering Consultants, LLC Ziegler Apartments Pavement Design EEC Project No. 1174067 September 7, 2017 (Revised from August 30, 2017) Page 5 Pavement design methods are intended to provide structural sections with adequate thickness over a particular subgrade such that wheel loads are reduced to a level the subgrade can support. The support characteristics of the subgrade for pavement design do not account for shrink/swell movements of a slightly expansive essentially cohesive subgrade or consolidation of a wetted subgrade. Thus, the pavement may be adequate from a structural standpoint, yet still experience cracking and deformation due to shrink/swell related movement of the subgrade. It is therefore important to minimize moisture changes in the subgrade to reduce shrink/swell movements. Care will be needed after preparation of the subgrades to avoid disturbing the subgrade materials. Positive drainage should be developed away from the pavements to avoid wetting of subgrade materials. Subgrade materials becoming wet subsequent to construction of the site improvements can result in unacceptable performance. The collection and diversion of surface drainage away from paved areas is critical to the satisfactory performance of the pavement. Drainage design should provide for the removal of water from paved areas in order to reduce the potential for wetting of the subgrade soils. Long-term pavement performance will be dependent upon several factors, including maintaining subgrade moisture levels and providing for preventive maintenance. The following recommendations should be considered the minimum:  The subgrade and the pavement surface should be adequately sloped to promote proper surface drainage.  Install pavement drainage surrounding areas anticipated for frequent wetting (e.g. landscaped and irrigated islands, etc.),  Install joint sealant and seal cracks immediately,  Seal all landscaped areas in, or adjacent to pavements to minimize or prevent moisture migration to subgrade soils;  Placing compacted, low permeability backfill against the exterior side of curb and gutter; and,  Placing curb, gutter, and/or sidewalk directly on approved proof rolled subgrade soils without the use of base course materials. Earth Engineering Consultants, LLC Ziegler Apartments Pavement Design EEC Project No. 1174067 September 7, 2017 (Revised from August 30, 2017) Page 6 Site grading is generally accomplished early in the construction phase. However, as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, or rainfall. As a result, the pavement subgrade may not be suitable for pavement construction and corrective action will be required. The subgrade should be carefully evaluated at the time of pavement construction for signs of disturbance, rutting, or excessive drying. If disturbance has occurred, pavement subgrade areas should be reworked, moisture conditioned, and properly compacted to the recommendations in this report immediately prior to paving. Please note that if during or after placement of the stabilization or initial lift of pavement, the area is observed to be yielding under vehicle traffic or construction equipment, it is recommended that EEC be contacted for additional alternative methods of stabilization, or a change in the pavement section. Pavement – Design and Construction We understand that Ziegler Road is classified as a minor arterial roadway and a County Fair Lane is classified as a local minor collector; therefore, Equivalent Daily Load Application (EDLA) values of 100 and 25 were used, respectively, for pavement design in general accordance with the LCAUSS criteria. Pavement section recommendations provided in this report are based on the traffic information outlined and the subgrade field and laboratory test results as discussed herein. A Hveem Stabilometer/R-value of 15 was determined for the rough-graded pavement subgrades for Ziegler Apartments as shown on the summary sheet included with this report. Using the Colorado Department of Transportation (CDOT) and the current Larimer County Urban Area Street Standards (LCUASS) Pavement Design Criteria, an R-value of 15 corresponds to a resilient modulus value of 4195 psi, which was used in the pavement evaluation for the roadways included herein. The American Association of State Highway and Transportation Officials (AASHTO) design guidelines for pavement thicknesses were used to evaluate recommended pavement sections for this project along with the current LCUASS Pavement Design Criteria. Recommended Earth Engineering Consultants, LLC Ziegler Apartments Pavement Design EEC Project No. 1174067 September 7, 2017 (Revised from August 30, 2017) Page 7 pavement sections based on those evaluations are provided on the attached summary tables included with this report. The aggregate base should meet LCUASS Class 5 or Class 6 specifications. Aggregate base should be placed and compacted to achieve a minimum density of 95% of standard Proctor maximum dry density (ASTM Specification D698). The hot bituminous pavement (HBP) should be grading SX (75) or S (75) with PG 58-28 binder and should be designed in accordance with LCUASS. The HBP should be compacted to achieve 92-96% of the material’s maximum specific gravity (Rice Value). The recommended pavement sections provided herein on the enclosed “Minimum Pavement Thickness Summary Tables” for Ziegler Apartments are minimums and periodic maintenance should be expected. Since the cohesive soils on the site have some shrink/swell potential, pavements could crack in the future primarily because of the volume change of the soils when subjected to an increase in moisture content to the subgrade. The cracking, while not desirable, does not necessarily constitute structural failure of the pavement. Stabilization of the subgrades will reduce the potential for cracking of the pavements. Preventive maintenance should be planned and provided for through an on-going pavement management program. Preventive maintenance activities are intended to slow the rate of pavement deterioration, and to preserve the pavement investment. Preventive maintenance consists of both localized maintenance (e.g. crack and joint sealing and patching) and global maintenance (e.g. surface sealing). Preventive maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. Prior to implementing any maintenance, additional engineering observation is recommended to determine the type and extent of preventive maintenance. GENERAL COMMENTS The analysis and recommendations presented in this report are based upon the data obtained from the soil borings performed at the indicated locations and from any other information discussed in this report. This report does not reflect any variations which may occur between Earth Engineering Consultants, LLC DRILLING AND EXPLORATION DRILLING & SAMPLING SYMBOLS: SS: Split Spoon ‐ 13/8" I.D., 2" O.D., unless otherwise noted PS: Piston Sample ST: Thin‐Walled Tube ‐ 2" O.D., unless otherwise noted WS: Wash Sample R: Ring Barrel Sampler ‐ 2.42" I.D., 3" O.D. unless otherwise noted PA: Power Auger FT: Fish Tail Bit HA: Hand Auger RB: Rock Bit DB: Diamond Bit = 4", N, B BS: Bulk Sample AS: Auger Sample PM: Pressure Meter HS: Hollow Stem Auger WB: Wash Bore Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2‐inch O.D. split spoon, except where noted. WATER LEVEL MEASUREMENT SYMBOLS: WL : Water Level WS : While Sampling WCI: Wet Cave in WD : While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB : After Boring ACR: After Casting Removal Water levels indicated on the boring logs are the levels measured in the borings at the time indicated. In pervious soils, the indicated levels may reflect the location of ground water. In low permeability soils, the accurate determination of ground water levels is not possible with only short term observations. DESCRIPTIVE SOIL CLASSIFICATION Soil Classification is based on the Unified Soil Classification system and the ASTM Designations D‐2488. Coarse Grained Soils have move than 50% of their dry weight retained on a #200 sieve; they are described as: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are described as : clays, if they are plastic, and silts if they are slightly plastic or non‐plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse grained soils are defined on the basis of their relative in‐ place density and fine grained soils on the basis of their consistency. Example: Lean clay with sand, trace gravel, stiff (CL); silty sand, trace gravel, medium dense (SM). CONSISTENCY OF FINE‐GRAINED SOILS Unconfined Compressive Strength, Qu, psf Consistency < 500 Very Soft 500 ‐ 1,000 Soft 1,001 ‐ 2,000 Medium 2,001 ‐ 4,000 Stiff 4,001 ‐ 8,000 Very Stiff 8,001 ‐ 16,000 Very Hard RELATIVE DENSITY OF COARSE‐GRAINED SOILS: N‐Blows/ft Relative Density 0‐3 Very Loose 4‐9 Loose 10‐29 Medium Dense 30‐49 Dense 50‐80 Very Dense 80 + Extremely Dense PHYSICAL PROPERTIES OF BEDROCK DEGREE OF WEATHERING: Slight Slight decomposition of parent material on joints. May be color change. Moderate Some decomposition and color change throughout. High Rock highly decomposed, may be extremely broken. Group Symbol Group Name Cu≥4 and 1<Cc≤3 E GW Well-graded gravel F Cu<4 and/or 1>Cc>3 E GP Poorly-graded gravel F Fines classify as ML or MH GM Silty gravel G,H Fines Classify as CL or CH GC Clayey Gravel F,G,H Cu≥6 and 1<Cc≤3 E SW Well-graded sand I Cu<6 and/or 1>Cc>3 E SP Poorly-graded sand I Fines classify as ML or MH SM Silty sand G,H,I Fines classify as CL or CH SC Clayey sand G,H,I inorganic PI>7 and plots on or above "A" Line CL Lean clay K,L,M PI<4 or plots below "A" Line ML Silt K,L,M organic Liquid Limit - oven dried Organic clay K,L,M,N Liquid Limit - not dried Organic silt K,L,M,O inorganic PI plots on or above "A" Line CH Fat clay K,L,M PI plots below "A" Line MH Elastic Silt K,L,M organic Liquid Limit - oven dried Organic clay K,L,M,P Liquid Limit - not dried Organic silt K,L,M,O Highly organic soils PT Peat (D30)2 D10 x D60 GW-GM well graded gravel with silt NPI≥4 and plots on or above "A" line. GW-GC well-graded gravel with clay OPI≤4 or plots below "A" line. GP-GM poorly-graded gravel with silt PPI plots on or above "A" line. GP-GC poorly-graded gravel with clay QPI plots below "A" line. SW-SM well-graded sand with silt SW-SC well-graded sand with clay SP-SM poorly graded sand with silt SP-SC poorly graded sand with clay Earth Engineering Consultants, LLC IIf soil contains >15% gravel, add "with gravel" to group name JIf Atterberg limits plots shaded area, soil is a CL- ML, Silty clay Unified Soil Classification System 2 P-1 P-2 P-3 1 Boring Location Diagram Ziegler Apartments - 5405 Ziegler Road Fort Collins, Colorado EEC Project #: 1174067 Date: August 2017 EARTH ENGINEERING CONSULTANTS, LLC Approximate Boring Locations 1 Legend Site Photos (Photos taken in approximate location, in direction of arrow) ZIEGLER APARTMENTS PAVEMENTS FORT COLLINS, COLORADO EEC PROJECT NO. 1174067 AUGUST 2017 DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ LEAN CLAY with SAND (CL) 1 brown _ _ medium stiff to stiff 2 _ _ % @ 150 psf CS 3 8 7000 17.8 104.3 36 20 73.2 800 psf 0.9% _ _ 4 _ _ brown / red SS 5 6 5000 11.0 _ _ 6 _ _ 7 _ _ 8 _ _ 9 brown _ _ SS 10 11 9000+ 12.8 _ _ BOTTOM OF BORING DEPTH 10.5' 11 _ _ 12 _ _ 13 _ _ 14 _ _ 15 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 _ _ Earth Engineering Consultants, LLC ZIEGLER APARTMENTS - 5405 ZIEGLER ROAD DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ LEAN CLAY with SAND (CL) 1 dark brown / rust _ _ stiff to medium stiff 2 _ _ % @ 150 psf CS 3 9 6500 23.5 99.5 1200 psf 1.5% _ _ 4 brown / rust _ _ SS 5 8 4500 19.0 _ _ 6 _ _ 7 _ _ 8 _ _ 9 brown / grey _ _ SS 10 7 2000 17.2 _ _ BOTTOM OF BORING DEPTH 10.5' 11 _ _ 12 _ _ 13 _ _ 14 _ _ 15 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 _ _ Earth Engineering Consultants, LLC ZIEGLER APARTMENTS - 5405 ZIEGLER ROAD DATE: RIG TYPE: CME55 FOREMAN: DG AUGER TYPE: 4" CFA SPT HAMMER: AUTOMATIC SOIL DESCRIPTION D N QU MC DD -200 TYPE (FEET) (BLOWS/FT) (PSF) (%) (PCF) LL PI (%) PRESSURE % @ 500 PSF _ _ LEAN CLAY with SAND (CL) - FILL 1 brown / rust / grey _ _ stiff to medium stiff 2 _ _ % @ 150 psf CS 3 10 9000 14.6 111.8 38 23 66.7 1200 psf 1.5% _ _ 4 _ _ SS 5 6 6500 16.7 _ _ BOTTOM OF BORING DEPTH 5.5' 6 _ _ 7 _ _ 8 _ _ 9 _ _ 10 _ _ 11 _ _ 12 _ _ 13 _ _ 14 _ _ 15 _ _ 16 _ _ 17 _ _ 18 _ _ 19 _ _ 20 _ _ 21 _ _ 22 _ _ 23 _ _ 24 _ _ 25 _ _ Earth Engineering Consultants, LLC ZIEGLER APARTMENTS - 5405 ZIEGLER ROAD Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown Lean Clay with Sand (CL) Sample Location: Boring P1, Sample 1, Depth 2' Liquid Limit: 36 Plasticity Index: 20 % Passing #200: 73.2% Beginning Moisture: 17.8% Dry Density: 107.5 pcf Ending Moisture: 21.1% Swell Pressure: 800 psf % Swell @ 150: 0.9% Ziegler Apartments - 5405 Ziegler Road Fort Collins, Colorado 1174067 August 2017 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10 Percent Movement Load (TSF) Consolidatio Swell Water Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Dark Brown / Rust Lean Clay with Sand (CL) Sample Location: Boring P2, Sample 1, Depth 2' Liquid Limit: - - Plasticity Index: - - % Passing #200: - - Beginning Moisture: 23.5% Dry Density: 100.8 pcf Ending Moisture: 25.1% Swell Pressure: 1200 psf % Swell @ 150: 1.5% Ziegler Apartments - 5405 Ziegler Road Fort Collins, Colorado 1174067 August 2017 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10 Percent Movement Load (TSF) Consolidatio Swell Water Added Project: Location: Project #: Date: SWELL / CONSOLIDATION TEST RESULTS Material Description: Brown / Rust / Gray Lean Clay with Sand (CL) - Fill Sample Location: Boring P3, Sample 1, Depth 2' Liquid Limit: 38 Plasticity Index: 23 % Passing #200: 66.7% Beginning Moisture: 14.6% Dry Density: 119.7 pcf Ending Moisture: 16.1% Swell Pressure: 1200 psf % Swell @ 150: 1.5% Ziegler Apartments - 5405 Ziegler Road Fort Collins, Colorado 1174067 August 2017 -10.0 -8.0 -6.0 -4.0 -2.0 0.0 2.0 4.0 6.0 8.0 10.0 0.01 0.1 1 10 Percent Movement Load (TSF) Consolidatio Swell Water Added PROJECT: Ziegler Apartments - Pavement Evaluation PROJECT NO. 1174067 LOCATION: DATE Aug-17 MATERIAL DESCRIPTION: Lean Clay with Sand (CL) - AASHTO A-6 SAMPLE LOCATION: LIQUID LIMIT: PLASTICITY INDEX: %PASSING #200: R-VALUE LABORATORY TEST RESULTS TEST SPECIMEN NO. 1 23 COMPACTION PRESSURE (PSI) 100 125 150 DENSITY (PCF) 113.1 117.0 115.7 MOISTURE CONTENT (%) 15.8 15.0 14.5 EXPANSION PRESSURE (PSI) 0.00 0.00 0.00 HORIZONTAL PRESSURE @ 160 PSI 127 119 119 SAMPLE HEIGHT (INCHES) 2.50 2.57 2.45 EXUDATION PRESSURE (PSI) 265.9 373.6 498.1 UNCORRECTED R-VALUE 13.8 18.4 19.2 CORRECTED R-VALUE 13.8 18.9 19.2 R-VALUE @ 300 PSI EXUDATION PRESSURE = 15 RESILIENT MODULUS, PSI = 4,195 Composite Subgrade Sample - Borings P-1 thru P-3: Upper 5 Feet RESISTANCE R-VALUE & EXPANSION PRESSURE OF COMPACTED SOIL - ASTM D2844 Fort Collins, Colorado 0 10 20 30 40 50 60 70 80 90 100 0 50 100 150 200 250 300 350 400 450 500 550 600 R-Value Exudation Pressure, PSF Client: Manhattan Land Company, LLC Project: Ziegler Apartments Pavement Design Project No. 1174067 Subgrade Resilient Modulus: Based on Subgrade R-Value of 15 Minimum Pavement Thicknesses - Inches Thickness, Inches Calculated SN Calculated SN Calculated SN Calculated SN 0.44 5.0 2.20 2.86 0.11 6.0 0.66 1.10 -- -- -- -- -- 2.86 3.96 MINIMUM PAVEMENT SECTION RECOMMENDATIONS (NON-STABILIZED SUBGRADE) Roadways Roadway Classification Date: 9/7/2017 County Fair Lane 18-kip Equivalent Daily Load Axles (EDLA) 25 100 Ziegler Road Local Minor Collector Minor Arterial 20-Year 18-kip Equivalent Single Axle Loads (ESAL) 182,500 730,000 Reliability (%) 75 90 Standard Deviation 0.44 0.44 4195 4195 PSI Loss (Initial Serviceability Index - Final Serviceability Index), psi 2.2 2 AASHTO Design Structural Number - SN 2.86 3.93 Composite Pavement Section (Option A) Thickness, Inches Thickness, Inches Thickness, Inches Hot Bituminous Pavement (Grade S) - Structural Number SN 6.5 Aggregate Base Course (CDOT Class 5 or 6) - Structural No. SN 10.0 Stabilized Subgrade - Fly Ash Treated Subgrade 13% Class C Calculated Pavement Structural Number - SN Client: Manhattan Land Company, LLC Project: Ziegler Apartments Pavement Design Project No. 1174067 Subgrade Resilient Modulus: Based on Subgrade R-Value of 15 Minimum Pavement Thicknesses - Inches Thickness, Inches Calculated SN Calculated SN Calculated SN Calculated SN 0.44 5.0 2.20 2.64 0.11 6.0 0.66 0.88 0.05 10.0 0.50 0.50 3.36 4.02 Note: Calculated Pavement Structural Number - SN 1) Calculated SN in RED-TEXT indicates the overall structural number assuming HALF-STRENGTH fly-ash credit, (i.e., assuming the field compressive strength samples achieve less than 150 psi, then 0.05 strength coefficient is being applied. Please note the HMA and ABC included herein with fly ash are the LCUASS required minimum thicknesses. Aggregate Base Course (CDOT Class 5 or 6) - Structural No. SN 8.0 (1) Stabilized Subgrade - Fly Ash Treated Subgrade 13% Class C 10.0 Composite Pavement Section (Option B) Thickness, Inches Thickness, Inches Thickness, Inches Hot Bituminous Pavement (Grade S) - Structural Number SN 6.0 PSI Loss (Initial Serviceability Index - Final Serviceability Index), psi 2.2 2 AASHTO Design Structural Number - SN 2.86 3.93 Standard Deviation 0.44 0.44 4195 4195 20-Year 18-kip Equivalent Single Axle Loads (ESAL) 182,500 730,000 Reliability (%) 75 90 Roadway Classification Local Minor Collector Minor Arterial 18-kip Equivalent Daily Load Axles (EDLA) 25 100 MINIMUM PAVEMENT SECTION RECOMMENDATIONS (FLY ASH STABILIZED SUBGRADE) Date: 9/7/2017 Roadways County Fair Lane Ziegler Road FORT COLLINS, COLORADO PROJECT NO: 1174067 LOG OF BORING P-3 AUGUST 2017 SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING None SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/18/2017 AFTER DRILLING N/A A-LIMITS SWELL FORT COLLINS, COLORADO PROJECT NO: 1174067 LOG OF BORING P-2 AUGUST 2017 SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING None SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/18/2017 AFTER DRILLING N/A A-LIMITS SWELL FORT COLLINS, COLORADO PROJECT NO: 1174067 LOG OF BORING P-1 AUGUST 2017 SHEET 1 OF 1 WATER DEPTH START DATE 8/18/2017 WHILE DRILLING None SURFACE ELEV N/A 24 HOUR N/A FINISH DATE 8/18/2017 AFTER DRILLING N/A A-LIMITS SWELL Soil Classification Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests Sands 50% or more coarse fraction passes No. 4 sieve Fine-Grained Soils 50% or more passes the No. 200 sieve <0.75 OL Gravels with Fines more than 12% fines Clean Sands Less than 5% fines Sands with Fines more than 12% fines Clean Gravels Less than 5% fines Gravels more than 50% of coarse fraction retained on No. 4 sieve Coarse - Grained Soils more than 50% retained on No. 200 sieve CGravels with 5 to 12% fines required dual symbols: Kif soil contains 15 to 29% plus No. 200, add "with sand" or "with gravel", whichever is predominant. <0.75 OH Primarily organic matter, dark in color, and organic odor ABased on the material passing the 3-in. (75-mm) sieve ECu=D60/D10 Cc= HIf fines are organic, add "with organic fines" to group name LIf soil contains ≥ 30% plus No. 200 predominantly sand, add "sandy" to group name. MIf soil contains ≥30% plus No. 200 predominantly gravel, add "gravelly" to group name. DSands with 5 to 12% fines require dual symbols: BIf field sample contained cobbles or boulders, or both, add "with cobbles or boulders, or both" to group name. FIf soil contains ≥15% sand, add "with sand" to GIf fines classify as CL-ML, use dual symbol GC- CM, or SC-SM. Silts and Clays Liquid Limit less than 50 Silts and Clays Liquid Limit 50 or more 0 10 20 30 40 50 60 0 10 20 30 40 50 60 70 80 90 100 110 PLASTICITY INDEX (PI) LIQUID LIMIT (LL) ML OR OL MH OR OH For Classification of fine-grained soils and fine-grained fraction of coarse-grained soils. Equation of "A"-line Horizontal at PI=4 to LL=25.5 then PI-0.73 (LL-20) Equation of "U"-line Vertical at LL=16 to PI-7, then PI=0.9 (LL-8) CL-ML HARDNESS AND DEGREE OF CEMENTATION: Limestone and Dolomite: Hard Difficult to scratch with knife. Moderately Can be scratched easily with knife. Hard Cannot be scratched with fingernail. Soft Can be scratched with fingernail. Shale, Siltstone and Claystone: Hard Can be scratched easily with knife, cannot be scratched with fingernail. Moderately Can be scratched with fingernail. Hard Soft Can be easily dented but not molded with fingers. Sandstone and Conglomerate: Well Capable of scratching a knife blade. Cemented Cemented Can be scratched with knife. Poorly Can be broken apart easily with fingers. Cemented