HomeMy WebLinkAboutSHERWOOD STREET ALLEYWAY - Filed SEPD-SURFACE EXPLORATION/PAVEMENT DESIGN REPORT - 2017-12-14Geotechnical Subsurface Exploration and Pavement Design Report
317-321 Sherwood Street Alleyway Pavements
Fort Collins, Colorado
Soilogic # 17-1053
2
FIELD EXPLORATION
To develop subsurface information for use in the pavement design, two (2) soil borings
were advanced within the alleyway alignment to a depth of approximately ten (10) feet
below alleyway subgrade level in accordance with the Larimer County Urban Area Street
Standards (LCUASS). The boring locations were established in the field by Soilogic
personnel by pacing and estimating angles and distances from identifiable site references.
The boring locations should be considered accurate only to the degree implied by the
methods used to make the field measurements. A diagram indicating the approximate
boring locations is included with this report. Graphic logs of the auger borings are also
included.
The test holes were advanced using 4-inch diameter continuous-flight auger powered by a
truck-mounted CME-45 drill rig. Samples of the subsurface materials were obtained at
regular intervals using California barrel sampling procedures in general accordance with
ASTM specification D-1586. As part of the D-1586 sampling procedure, standard
sampling barrels are driven into the substrata using a 140-pound hammer falling a
distance of 30 inches. The number of blows required to advance the samplers a distance
of 12 inches is recorded and helpful in estimating the consistency or relative density of
the soils encountered. In the California barrel sampling procedure, lesser disturbed
samples are obtained in removable brass liners. Samples of the subsurface materials
obtained in the field were sealed and returned to the laboratory for further evaluation,
classification and testing.
LABORATORY TESTING
The samples collected were tested in the laboratory to measure natural moisture content
and visually and/or manually classified in accordance with the Unified Soil Classification
System (USCS). The USCS group symbols are indicated on the attached boring logs. An
outline of the USCS classification system is included with this report.
As part of the laboratory testing, a calibrated hand penetrometer (CHP) was used to
estimate the unconfined compressive strength of essentially cohesive specimens. The
CHP also provides a more reliable estimate of soil consistency than tactual observation
Geotechnical Subsurface Exploration and Pavement Design Report
317-321 Sherwood Street Alleyway Pavements
Fort Collins, Colorado
Soilogic # 17-1053
3
alone. Dry density, Atterberg limits, -200 wash and swell/consolidation tests were
completed on selected samples to help establish specific soil characteristics. Atterberg
limits tests are used to determine soil plasticity. The percent passing the #200 size sieve
(-200 wash test) is used to determine the percentage of fine grained materials (clay and
silt) in a sample. Swell/consolidation tests are performed to evaluate soil volume change
potential with variation in moisture content. Swell/consolidation tests completed on
samples obtained at a depth of approximately 2 feet below ground surface were inundated
with water at a 150 psf confining pressure. As part of the completed laboratory testing,
one (1) resistance value (R-value) test was completed on a representative subgrade
sample for use in pavement design. The results of the completed laboratory tests are
outlined on the attached boring logs and swell/consolidation summary sheets.
SUBSURFACE CONDITIONS
The subsurface materials encountered in the completed site borings can be summarized as
follows. Approximately 6 inches of recycled asphalt pavement (RAP) was encountered
at the surface at the boring locations. At the location of boring B-2, the RAP was
underlain by apparent fill/utility backfill consisting of brown clayey sand and gravel. The
RAP encountered at the location of boring B-3 and apparent fill encountered at the
location of boring B-2 was underlain by light reddish brown to brown silty lean clay.
The silty lean clay varied from soft to stiff in terms of consistency, exhibited low swell
potential at in-situ moisture and density conditions and extended to depths ranging from
approximately 7 to 8 feet below ground surface where it transitioned to tan to light
reddish brown sandy lean to fat clay. The lean to fat clay was stiff in consistency and
extended to the bottom of both borings at a depth of approximately 10 feet below present
site grades.
The stratigraphy indicated on the included boring logs represents the approximate
location of changes in soil types. Actual changes may be more gradual than those
indicated.
Groundwater was not encountered in either of the completed site borings at the time of
drilling. Groundwater levels will vary seasonally and over time based on weather
conditions, site development, irrigation practices and other hydrologic conditions.
Geotechnical Subsurface Exploration and Pavement Design Report
317-321 Sherwood Street Alleyway Pavements
Fort Collins, Colorado
Soilogic # 17-1053
4
Perched and/or trapped groundwater conditions may also be encountered at times
throughout the year. Perched water is commonly encountered in soils overlying less
permeable soil layers and/or bedrock. Trapped water is typically encountered within
more permeable zones of layered soil and bedrock systems. The location and amount of
perched and/or trapped water can also vary over time.
ANALYSIS AND RECOMMENDATIONS
Roadway Subgrade Development
The lean clay subgrade soils encountered in the completed site borings exhibited low
swell potential at in-situ moisture and density conditions. The clayey sand and gravel
encountered near surface at boring location B-2 would be expected to be non-expansive
or possess low swell potential based on the materials physical properties and engineering
characteristics. Based on results of the completed field and laboratory testing, it is our
opinion the clayey sand and gravel and silty lean clay could be used for direct support of
the alleyway pavements. Immediately prior to paving, we recommend the exposed
subgrade soils be scarified to a depth of 9 inches, adjusted in moisture content and
compacted to at least 95% of the materials standard Proctor maximum dry density. The
moisture content of the scarified subgrade soils should be adjusted to be within the range
of ±2% of standard Proctor optimum moisture content at the time of compaction. If fly
ash stabilization of the pavement subgrade soils will be completed, reconditioning of the
subgrade soils prior to fly ash treatment would not be required.
Care should be taken to avoid disturbing the developed subgrade soils prior to paving.
In addition, efforts to maintain the proper moisture content in the subgrade soils should
be made. If subgrade soils are disturbed by the construction activities or allowed to dry
out or become elevated in moisture content, those materials should be reworked in place
or removed and replaced prior to surfacing.
Proof-rolling of the alleyway subgrade soils should be completed prior to paving to help
identify any areas of soft/unstable soils. Those areas identified as unstable would need to
be mended prior to paving. Isolated areas of instability can be mended on a case by case
basis. If more extensive areas of subgrade instability are encountered and depending on
Geotechnical Subsurface Exploration and Pavement Design Report
317-321 Sherwood Street Alleyway Pavements
Fort Collins, Colorado
Soilogic # 17-1053
5
the time of year when construction occurs and other hydrologic conditions, stabilization
of the subgrade soils may become necessary to develop a suitable paving platform.
Based on the materials encountered in the completed site borings and results of
laboratory testing, it is our opinion fly ash stabilization of the pavement subgrades could
be completed to develop a suitable paving platform. With the increase in support
strength developed by the stabilization procedures, it is our opinion the zone of stabilized
subgrade could be included in the pavement section design, slightly reducing the required
thickness of overlying aggregate base course. Pavement section design options
incorporating some structural credit for the fly ash stabilized subgrade soils are outlined
below in Table I. Fly ash stabilization can eliminate some of the uncertainty associated
with attempting to pave during periods of inclement weather.
For half credit and if fly ash stabilization will be completed, we recommend the addition
of 12% class ‘C’ fly ash based on component dry unit weights. A 12-inch thick stabilized
zone should be constructed by thoroughly blending the fly ash with the in-place subgrade
soils. Some “fluffing” of the finish subgrade level should be expected with the
stabilization procedures. The blended materials should be adjusted to within ±2% of
standard Proctor optimum moisture content and compacted to at least 95% of the
material’s standard Proctor maximum dry density within two (2) hours of fly ash
addition.
Pavement Design
Site pavement could be supported directly on stable reconditioned subgrade soils or fly
ash treated subgrade soils developed as outlined above. The pavement subgrade soils are
expected to consist of reconditioned silty lean clay and clayey sand and gravel. The silty
lean clay soils classify as A-6 soils in accordance with The American Association of
State Highway and Transportation Officials (AASHTO) classification system and would
be expected to exhibit low remolded shear strength. An R-value of less than 5 was
determined on a representative subgrade sample obtained from the borings and used in
pavement section design. Design ESAL’s were provided by City of Fort Collins
personnel. Serviceability loss and reliability were obtained from the current LCUASS.
Outlined below in Table I. are pavement section design options for the project alleyway.
Geotechnical Subsurface Exploration and Pavement Design Report
317-321 Sherwood Street Alleyway Pavements
Fort Collins, Colorado
Soilogic # 17-1053
6
TABLE 1 – PAVEMENT SECTION DESIGN
Roadway
Classification
ESAL’s
Reliability
% Loss
Resilient Modulus (Mr)
Design Structural Number
Option A – Composite
Surface Asphalt (Grading S or SX)
Aggregate Base (Class 5 or 6)
(Structural Number)
Option B – Composite on Fly Ash
Asphalt (Grading S or SX)
Aggregate Base (Class 5 or 6)
Fly Ash Treated Subgrade
(Structural Number)
317-321 Sherwood Street Alleyway
Alley/Local Residential
73,000
80%
2.5%
3025
(2.83)
5” (0.44/inch)
6” (0.11/inch)
(2.86)
4” (0.44/inch)
5” (0.11/inch)
12” (10 @ .05/inch)
(2.81)
Asphaltic concrete should consist of a bituminous plant mix composed of a mixture of
aggregate, filler, binders and additives if required meeting the design requirements of the
City of Fort Collins (LCUASS). Aggregate used in the asphaltic concrete for local
residential roadways should meet specific gradation requirements for Colorado
Department of Transportation (CDOT) grading S (3/4 inch minus) or SX (1/2 inch
minus) mixes. Hot mix asphalt designed using “Superpave” criteria should be compacted
to within 92 to 96% of the materials Maximum Theoretical Density. Aggregate base
should be consistent with CDOT requirements for Class 5 or 6 aggregate base, placed in
loose lifts not to exceed 9 inches thick and compacted to at least 95% of the materials
standard Proctor maximum dry density.
The proposed pavement section design does not include an allowance for excessive
loading conditions imposed by heavy construction vehicles or equipment. The
recommended pavement sections are minimums and periodic maintenance efforts should
be expected. A preventative maintenance program can help increase the service life of
the roadway pavement.
Geotechnical Subsurface Exploration and Pavement Design Report
317-321 Sherwood Street Alleyway Pavements
Fort Collins, Colorado
Soilogic # 17-1053
7
Drainage
Positive drainage is imperative for long term performance of the alleyway pavements.
Water which is allowed to pond adjacent to alleyway pavements can result in a loss of
subgrade support and premature failure of the overlying pavement section.
LIMITATIONS
This report was prepared based upon the data obtained from the completed site
exploration, laboratory testing, engineering analysis and any other information discussed.
The completed borings provide an indication of subsurface conditions at the boring
locations only. Variations in subsurface conditions can occur in relatively short distances
away from the borings. This report does not reflect any variations which may occur
across the site or away from the borings. If variations in the subsurface conditions
anticipated become evident, the geotechnical engineer should be notified immediately so
that further evaluation and supplemental recommendations can be provided.
The scope of services for this project does not include either specifically or by
implication any biological or environmental assessment of the site or identification or
prevention of pollutants or hazardous materials or conditions. Other studies should be
completed if concerns over the potential of such contamination or pollution exist.
The geotechnical engineer should be retained to review the plans and specifications so
that comments can be made regarding the interpretation and implementation of our
geotechnical recommendations in the design and specifications. The geotechnical
engineer should also be retained to provide testing and observation services during
construction to help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of our client for specific application
to the project discussed and has been prepared in accordance with the generally accepted
standard of care for the profession. No warranties express or implied, are made. The
conclusions and recommendations contained in this report should not be considered valid
in the event that any changes in the nature, design or location of the project as outlined in
Geotechnical Subsurface Exploration and Pavement Design Report
317-321 Sherwood Street Alleyway Pavements
Fort Collins, Colorado
Soilogic # 17-1053
8
this report are planned, unless those changes are reviewed and the conclusions of this
report modified and verified in writing by the geotechnical engineer.
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further assistance to you
in any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Wolf von Carlowitz, P.E. Darrel DiCarlo, P.E.
Principal Engineer Senior Project Engineer
36746 44271
LOG OF BORING B-2
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
6" RECYCLED ASPHALT PAVEMENT -
SC-GC FILL - CLAYEY SAND AND GRAVEL 1
brown -
2
-
3 CS 11 18.9 108.2 9000+ 0.4% - - - -
CL SILTY LEAN CLAY -
light reddish brown 4
soft to stiff -
5 CS 5 19.6 96.3 6000 - - 34 15 80.3%
-
6
-
7
-
8
CL-CH SANDY LEAN TO FAT CLAY -
tan to light reddish brown 9
stiff -
10 CS 14 19.7 107.3 7000 - - - - -
BOTTOM OF BORING 10' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
317-321 SHERWOOD STREET ALLEYWAY PAVEMENTS
LOG OF BORING B-3
1/1 CME 45
4" CFA
Automatic
CP/ZG
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
6" RECYCLED ASPHALT PAVEMENT -
1
-
CL SILTY LEAN CLAY 2
brown -
medium stiff 3 CS 8 17.6 110.8 9000+ 0.6% - - - -
-
4
-
5 CS 7 18.5 100.3 9000+ - - - - -
-
6
-
7
-
CL-CH SANDY LEAN TO FAT CLAY 8
reddish brown -
stiff 9
-
10 CS 16 18.6 111.3 9000+ - - - - -
BOTTOM OF BORING 10' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
317-321 SHERWOOD STREET ALLEYWAY PAVEMENTS
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 108.2
317-321 SHERWOOD STREET ALLEYWAY PAVEMENTS
FORT COLLINS, COLORADO
Project # 17-1053
March 2017
SWELL/CONSOLIDATION TEST SUMMARY
Sample ID: B-2 @ 2
Sample Description:
(Swell Only)
Initial Moisture 18.9%
Final Moisture 19.5%
% Swell @ 500 psf 0.4%
Swell Pressure (psf) -
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 110.8
SWELL/CONSOLIDATION TEST SUMMARY
317-321 SHERWOOD STREET ALLEYWAY PAVEMENTS
FORT COLLINS, COLORADO
Project # 17-1053
March 2017
Initial Moisture 17.6%
Sample ID: B-3 @ 2
Sample Description:
(Swell Only)
Final Moisture 19.1%
% Swell @ 500 psf 0.6%
Swell Pressure (psf) -
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group
Symbol
Group NameB
Clean Gravels Cu ! 4 and 1 " Cc " 3E GW Well graded gravelF
Less than 5% finesC Cu
< 4 and/or 1 > Cc > 3E GP Poorly graded gravelF
Fines classify as ML or MH GM Silty gravelF,G, H
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels
More than 50% of coarse
fraction retained on
No. 4 sieve Gravels with Fines More
than 12% finesC Fines classify as CL or CH GC Clayey gravelF,G,H
Clean Sands Cu ! 6 and 1 " Cc " 3E SW Well graded sandI
Less than 5% finesD Cu
< 6 and/or 1 > Cc > 3E SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandG,H,I
Sands
50% or more of coarse
fraction passes
No. 4 sieve Sands with Fines
More than 12% finesD Fines classify as CL or CH SC Clayey sandG,H,I
Silts and Clays PI > 7 and plots on or above “A” lineJ CL Lean clayK,L,M
Liquid limit less than 50
Inorganic
PI < 4 or plots below “A” lineJ ML SiltK,L,M
Liquid limit - oven
dried
Organic clayK,L,M,N
Fine-Grained Soils
50% or more passes the
No. 200 sieve
Organic
Liquid limit - not
dried
< 0.75 OL
Organic siltK,L,M,O
Inorganic PI plots on or above “A” line CH Fat clayK,L,M
Silts and Clays
Liquid limit 50 or more
PI plots below “A” line MH Elastic siltK,L,M
Organic Liquid limit - oven dried Organic clayK,L,M,P
Liquid limit - not dried
< 0.75 OH
Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well graded
gravel with silt, GW-GC well graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well graded
sand with silt, SW-SC well graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
GENERAL NOTES
DRILLING & SAMPLING SYMBOLS:
SS: Split Spoon - 1⅜" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger
ST: Thin-Walled Tube – 2.5" O.D., unless otherwise noted PA: Power Auger
RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger
CS: California Barrel - 1.92" I.D., 2.5" O.D., unless otherwise noted RB: Rock Bit
BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary
The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch
penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”. For 2.5” O.D.
California Barrel samplers (CB) the penetration value is reported as the number of blows required to advance the sampler 12
inches using a 140-pound hammer falling 30 inches, reported as “blows per inch,” and is not considered equivalent to the
“Standard Penetration” or “N-value”.
WATER LEVEL MEASUREMENT SYMBOLS:
WL: Water Level WS: While Sampling
WCI: Wet Cave in WD: While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB: After Boring ACR: After Casing Removal
Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other
times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater.
In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations.
DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils
have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand.
Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they
are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents
may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
FINE-GRAINED SOILS COARSE-GRAINED SOILS BEDROCK
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Relative
Density
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
< 3 0-2 Very Soft 0-5 < 3 Very Loose < 24 < 20 Weathered
3-5 3-4 Soft 6-14 4-9 Loose 24-35 20-29 Firm
6-10 5-8 Medium Stiff 15-46 10-29 Medium Dense 36-60 30-49 Medium Hard
11-18 9-15 Stiff 47-79 30-50 Dense 61-96 50-79 Hard
19-36 16-30 Very Stiff > 79 > 50 Very Dense > 96 > 79 Very Hard
> 36 > 30 Hard
RELATIVE PROPORTIONS OF SAND AND
GRAVEL
GRAIN SIZE TERMINOLOGY
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Major Component
of Sample
Particle Size
Trace < 15 Boulders Over 12 in. (300mm)
With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Sand
Silt or Clay
#4 to #200 sieve (4.75mm to 0.075mm)
Passing #200 Sieve (0.075mm)
RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Term Plasticity Index
Trace
With
Modifiers
< 5
5 – 12
> 12
Non-plastic
Low
Medium
High
0
1-10
11-30
30+
F If soil contains ! 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains ! 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains ! 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ! 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ! 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
FORT COLLINS, COLORADO
Project # 17-1053
March 2017
USCS
Sampler
Atterberg Limits
Start Date 3/6/2017 Auger Type: During Drilling None
Finish Date 3/6/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -
FORT COLLINS, COLORADO
Project # 17-1053
March 2017
USCS
Sampler
Atterberg Limits
Start Date 3/6/2017 Auger Type: During Drilling None
Finish Date 3/6/2017 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -