Loading...
HomeMy WebLinkAboutHABITAT SKYLINE SUBDIVSION - Filed DCP-DEV. CONSTRUCTION PERMIT - 2017-04-04DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 17-13 Issuance Date: 4/3/2017 Project Name: Lot 1, Habitat Skyline Subdivision (Habitat for Humanity – Skyline House) Project Location: 1016 Skyline Drive Permittee: Kristin Candella, Habitat for Humanity City and developer contacts: See attached Exhibit “A” for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (BMISC170282) $ 400.00 Excavation Permit (Check 3889) $ 578.50 Construction Inspection Fee (Check 3889) $ 627.00 Total $ 1,605.50 Note: the above amounts may not include any street cut fees which may be required to be paid by separate permit. Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 10,181.02 Form of security deposited with the City: Check# 3890 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide “as-constructed” plans prepared by an Engineer prior to the City’s acceptance of the constructed public improvements. (All references above to the terms “Project Engineer” and “Engineer” shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re-apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the “as-constructed” plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to EXHIBIT “A” DEVELOPMENT PROJECT CONTACT PERSONS City Staff Contact Persons: Development Engineer: Marc Ragasa 281 North College Avenue, Fort Collins, CO 80524 970 221-6603 Construction Inspector: Steve Cicione 281 North College Avenue, Fort Collins, CO 80524 970 692-4418 Current Planner: Noah Beals 281 North College Avenue, Fort Collins, CO 80524 970 416-2313 Water Utilities Engineer: Shane Boyle 700 Wood Street, Fort Collins, CO 80521 970 221-6339 Erosion Control Inspector: Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 970 218-2932 Natural Resources: Rebecca Everette 281 North College Avenue, Fort Collins, CO 80524 970 416-2625 Traffic Operations: Joe Olson 626 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Forestry: Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 970 221-6641 Light and Power: Janet McTague 700 Wood Street, Fort Collins, CO 80521 970 224-6154 Developer’ Contact Persons: Project Manager: Kristin Candella/Mark Scott, Habitat for Humanity 1600 Palm Drive, Fort Collins, CO 80526 Office: 970-488-2602 Email: kcandella@fortcollinshabitat.org ; mscott@fortcollinshabitat.org Developer: Kristin Candella, Habitat for Humanity 1600 Palm Drive, Fort Collins, CO 80526 Office: 970-488-2602 Email: kcandella@fortcollinshabitat.org Owner(s): Kristin Candella, Habitat for Humanity 1600 Palm Drive, Fort Collins, CO 80526 Office: 970-488-2602 Email: kcandella@fortcollinshabitat.org Architect/Planner: Russ Lee Ripley Design Inc. 419 Canyon Aven, Suite 200, Fort Collins CO 80524 Office: 970-224-5828 Email: russ.lee@ripleydesign.com Project Engineer: Skylar Brower, PE Interwest Consulting Group 1218 W. Ash Street, Windsor, CO 80550 Office: 970-460-1091 Email: sbrower@interwestgrp.com Professional License Number: 0044248 General Contractor: Mark Scott, Habitat for Humanity 1600 Palm Drive, Fort Collins, CO 80526 Office: 970-488-2602 Email: mscott@fortcollinshabitat.org