HomeMy WebLinkAboutMILESTONE APARTMENTS - Filed DCP-DEV. CONSTRUCTION PERMIT - 2016-09-07W
City of
Fort Collins
ngineerin,
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: I b " 2-T Issuance Date:
Project Name: Milestone Apartments
Project Location: South of Harmony Road and West of Strauss Cabin Road, More specifically
NE of Lady Moon Drive and Precision Drive
Permittee: Ken Kiken Milestone Terra Vida II GP 303-419-0744
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee BMIS 16 ($400 paid) $ .
Construction Inspection Fee BMIS160649 $ 7,298.90
Street Cut Fee (to be paid separately) $ 0.0
Total amount due $ 7,298.90
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 136,328.00
Form of security deposited with the City: �i�F,(- 3 DO 13 l yQ
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the
terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in
Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
Page 1 of 6
3. Construction time restrictions: N/A
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the aermit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code
or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is
applicable, are met. If the Development Agreement does not specify times for completion of
public improvements, or if there is no Development Agreement, then the improvement
requirements specified in Section 24-95 of the City Code shall apply, which provides that
construction of all improvements shall be required prior to the time of issuance of the first
building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the `as -constructed' plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
Page 2 of 6
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority
of the owners of the property (including all owners having legal or equitable interest in the real
property, as defined in Section 1-2 of the City Code; and including common areas legally connected
to or associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I
hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to
enter upon such property to perform work required of the applicant if the applicant were to fail to
perform the required work. I also acknowledge that I have read this permit document with all its
requirements and conditions, and I agree to all of the terms and conditions so stated in this
permit.
Applicant/Project Manager's Signature: � v Date:
Approval for issuance:
City Engineer Approv<:` �c-r Date: q / — /(—p
& q � (Permit Issuance Date)
Page 3 of 6
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Milestone Apartments
Project A.K.A.:
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Langenberger
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6573
Construction Inspector: Wayne Lenard
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6605
Cell (970) 222-6812
Current Planner: Rebecca Everette
281 N. College Avenue, Fort Collins, Co 80524
(970) 416-2625
Water Utilities Engineer: Shane Boyle
700 Wood Street, Fort Collins, Co 80521
(970) 221-6339
Wastewater Engineer: Terry Farrill
4700 S. College Ave, Fort Collins, Co 80525
(970) 226-3104
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, Co 80521
(970) 218-2932
Natural Resources: Rebecca Everette
281 N. College Avenue, Fort Collins, Co 80524
(970) 416-2625
Traffic Operations: Martina Wilkinson
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6887
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6815
Page 4 of 6
Forestry: Tim Buchanan
215 N. Mason St., Fort Collins, Co 80524
(970) 221-6361
Light and Power: Janet McTague
700 Wood Street, Fort Collins, Co 80521
(970) 224-6154
Developer's Contact Persons:
Project Manager/
Developer/ Owner: Ken Kiken, milestone Terra Vida II GP
1400 16t' Street 6U' Floor, Denver, CO 80202
(303) 419-0744
Fax (303) 298-7281
info e,milestonedevgroup.com
Project Engineer: Nick Hawes, Northern Engineering
301 Howes Street, Suite 100, Fort Collins, Co 80521
(970) 221-4158
ryananorthernen ing_eering corn
Architect/Planner: Paul Campbell, Kephart
2555 Walnut Street, Denver, CO 80205
(303) 832-4474
paul .kephart.com
General Contractor: Brian Cass or Brittany Valdez
Bryan Construction, Inc.
4700 Innovation Drive, Building C
Fort Collins, CO 80527
(970) 204-0100
Cell (970) 556-3432 and (970) 231-8179
Fax (970) 204-0200
Brian.cass(a-drahota.com
BrittM.valdez@a,drahota.com
Page 5 of 6
000000
O O O O O O
O O O O O O O O O O O O O O O
O N n O O O O O O O O O O O O
000000
O O O O O O
00 O O
O O O O
0 0 00 o O
6A 69 Ef!69 fA 6A
O N cO 0 0 0 0 0 0 o o O o o o
69 co M6A 69 O:)M OM M 0 O069
0 0 0 0 0 0
69696A 6. (A 69
0 0 0 0
6969 G969
LO
Cl)O
OM r,(fl69MN
N 6A 6A N 69 69
N
N
O
G
W
Z
6A 6A
1,
0
64W
N
M
J
� Wui
?
ONw
N
2 m
F- Z LL
C
0 0 p 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
pl f` t` C- 00000000000
LO o 0 0 C0 LOLO
7000 V: d'
o
q O
Z
J
F' r
Z ZG1�
00 MMMCM
Cfl fA 69 69
O O O O o o M CD000 LO 00 LO
69 EH EA 69 h t-Ohr- MMMMM M
69 63 69 6A 6A 69 fA 6A
00
O 0 59 EA 6g
Oo
69a
J
0 M W U
� 69
69 69
6q
c�
PmaW
H
Wa0 �
W
Z
IL
ZLW am
LL
W
Z
> &0
W
000000
0 0 0 0 0 0
O O O O O O O O O O O O O O O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0000000
0000000
0 0
0 0
O
F
O
0 y
F
6a
069690��69C
69�069LO�0 000
690oN069
06969�69696469b969
6969 69
69
W
O
U
oo C0
C
w
W
_
69 64 fA�04�!
MQwIxW
I
F
a LL
OWZV
F
O
W O
F"
F
W
p0F
W
=
f-
O O O O Cl O
o00000
00po
000000000000000
000000000000000
0000000
000u�000
0 0
0o
(%�
3 W
a
F
Q>-
uio
u�Cfl fA 69OO
69 CO
oaoovpo0000OOSOO
69� 64 69 CCi OCfl CO b9 OO CO OO
o Dmvoom
69 N c9Z9 069 cA
coo
NCO
�i
O Z
i
Z W
V
m
N
NN
6A M N 00 r-_ actN N CO CO
N 69 NCN N
69 6A 6y
69
W
Y
w
ce _
ui
H G
6A 69
69 6s 69 69 69 69 69
W ,J
00.
J
U c
LLZ
z V U 0
U pp,,
N
z y
WV
Q U
0 0 0 0 0 0
0 0 0 W O N O O M M O
0 0 0 0 0 0 0
O O O
m G
O Q
W
W Z_
of
LZ
O ZZ
F O
Z
z
V
Q
W
6n
o
�- W
Z
W W W
3 C
aF°,a
z 3
zdOtz a
Q
O
LU
0
i y
F
c�i
W G w
O�
H
C>
22
LL LL:>-
22222222222
LL LL LL w U U U U UU U U UU U
U:'LL. LL LL:> }
C/j>:
IL
ZO O
m 0
Q
JJUU
JJ JJ 444� qq qLQ qQ Q
Cu Cu w LLJ CJJ LLJ LIJ LLJ lIJ
JUJ J J(n (n
JfoW U)
Ix
O W
ULL Lu
0
F.
Z y C
mQH
W
m
m
c
O
2U N
U
Lu
N
d y
a,)p
ca
W� m
IX W
Z
_
U)
U)V Z
H U
W
CZ W
_L 2 y
CL in 3
_c (aW
'J 2 p O
N
F- a y
2 U)
~
U>
a=U�
y
>ZYZ
O
�
m d
� o
LL
LL
?E
��
aEJppQ',,
Opg
d
mui
U m.� d
N
J.'.oO U £
a
N
C'-L
Z
O
.J W
m �, m
m
ccc :
m aU� -pL
= U)o cc
O
E
o c me
W�W
W
O=Qrg
O�U~tUA
3WOU
�yOQNJPFQ�
O�Hwp-
oD
i
>O
L'�o
E
d c a)p
1Q
J
O a 2t
>'� �
g EoEW
W
W A
(yAm
dyc FL-U—mNCC -�
N
3
L1 NFA
C tO
u
>E
�
L
a.aQ2
0.a
?i
m
m
�j m a N N p 8 A m N m' n
m M W °M
: St��'j
$
5' ,11 :81 a
6
ZZI ® i
uj �O.H
ccz lx
LL W
Q O i 6
...Y Y
Z w
co
J
N�3HI I MY
Lai
gO
g8
II auI �. �• 1
.o
NV-1d 311S CO
LLVVciV 3NO183-1I10i 6 a
N
° !
tools
1111111
a°
°
pa
Hill
as
p
Hio
p!
oil
19
T Y
iii ii1;CYljl } a! a iS # #
T.
��wljl�lBij � py� ° t �I zt mm p
�.a..w anmo rao. •av,
%0.411 62L-n