HomeMy WebLinkAboutRESEARCH BLVD. PARKING LOT PROJECT # 14-031 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2016-08-05City,of
F6rt
"' Collins
ngineerin
City of Fort Gollins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 15 - 1 :�?— Issuance Date: G 12115- —
Project Name: Research Blvd Parking Lot Project (CSU parking lot at Centre and Research)
Project Location: East of Research Blvd between Drake Road and Centre Ave
Permittee: Keith Meyer PE, Ditesco, 970-988-8605
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees:
Permit Application Fee
Construction Inspection Fee
Pavement Impact Fee - excavation permit
$
200.00
$
347.00
$
3,078.25
Total amount due $
3,625.25
Note: the above amounts may not include any street cut fees which may be required to be paid by
separate permit.
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed, in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the
terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in
Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: n/a
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
Page 1 of 5
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code
or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is
applicable, are met. If the Development Agreement does not specify times for completion of
public improvements, or if there is no Development Agreement, then the improvement
requirements specified in Section 24-95 of the City Code shall apply, which provides that
construction of all improvements shall be required prior to the time of issuance of the first
building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and
the "as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Page 2 of 5
11
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority
of the owners of the property (including all owners having legal or equitable interest in the real
property, as defined in Section 1-2 of the City Code; and including common areas legally connected
to or associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I
hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to
enter upon such property to perform work required of the applicant if the applicant were to fail to
perform the required work. I also acknowledge that I have read this permit document with all its
requirements and conditions, and I agree to all of the terms and conditions so stated in this
permit.
Applicant/Project Manager' s Signature: Date: S "06 /-r
Approval for issuance:
City Engineer Approval Date: T�' / 5
(Permit Issuance Date)
Page 3 of 5
�n
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Research Blvd Parking Lot Project
City Staff Contact Persons:
Development Engineer: Sheri Langenberger, P.E.
281 North College Avenue, Fort Collins, CO 80524
970 221-6573
Construction Inspector: Steve Cicione
281 North College Avenue, Fort Collins, CO 80524
970 692-4418
Current Planner: Jason Holland
281 North College Avenue, Fort Collins, CO 80524
970 224-6126
Water Utilities Engineer:
Erosion Control Inspector:
Shane Boyle
700 Wood Street, Fort Collins, CO 80521
970 221-6339
Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
970 218-2932
Natural Resources: Kelly Kimple
281 North College Avenue, Fort Collins, CO 80524
970 416-2401
Traffic Operations: Joe Olson
626 Linden Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
970 221-6815
Forestry: Tim Buchanan
215 N Mason Street, Fort Collins, CO 80524
970 221-6641
Light and Power: Janet Mctague
700 Wood Street, Fort Collins, CO 80521
970 224-6154
Page 4 of 5
Developer' Contact Persons:
Owner/ Applicant: Colorado State University
Laura Bently, Facilities Services Center, North
Building
Fort Collins, Co 80521
970.492.4161 (office)
970.568.6596 (cell)
Laura.bently(a,colostate.edu
Permitee: Keith Meyer, PE, Ditesco, LLC
1315 Oakridge Drive, Ste 120
Fort Collins, CO 80525
970.988.8605
Keith.Meyer(a)Ditescoservices.com
General Contractor: John Warren, Connell Resources Inc.
7785 Highland Meadows Parkway#100
Fort Collins, CO 80528
970.223.3151
Page 5 of 5
CSU Parking Lot
Research Blvd. & Centre Ave.
800 400 0 800 Feet
1 inch = 800 feet
N
W E
S
f3I
Hinos NVIIS W" # MWONd 101 ONDIWd 'GAIS HOWMN
NOA SNVId Al 03SON.P
Ao i.
T
-A
1.4 9 jj I
00 00
— — — - — — — -- — — — — — — — — — — — — — — — - - ---------
���� a ���I ��-
I[RiRI'R/ 3N0H :JRRt•M1RMR �.111 Rm10W/Y IINw � �({}-�e'an RW
LN i1KN nn:NlNp fl :AR IYNYIIO L•(OB mrov.J �!mJ «ca
�0'q 9 nx rwnr uw *Nu R w®arao ce,a:ns ...c...N,u�x�
HI2JON - NVId 311S 1,MK #103ro)Jd 101 JNIHMVd'aAIS H0HV3S3a n soup
NOd SNVId All11111n
j$ WO •� ,Q <
k��yypy R� C� k�i Y��ri 00
Y a'
m oil
g$$g
fit
i C
W
D f
1' iz
41t _ _
i
a€
K
(iILir
a
L
t
-x� ---�
�r �<
S9
I
II
}jn x
u
RRk91 laq 1 E
Y
O O OOO S
O N6&�6
�op
�
6O4�SdSlHSKOfOR�OdO4SSOOOS
O O
��69
o
M O_
N
d)
d3 i
x
0
N
O=�
00 0
nn�i�nSO
0 0000
nnnnOOoSo0 OSS
0 Lnte
`�OoO.rv,
u)o
vo
J
J
Z Z €
�
��tn109.
�u�iniflfa�
uos
0mLu
1Wp=
N
wa0 f.
i
WLU
dm
> a
U. `.'
0 N
Q
p
OSOOSS
p
SS . ..000SOOSO
t[1SSOSM^
NS
co
a
W
fA�69
M
> W
N
cc
Q U.
IL
0
OvFiLL
wZ E'v
W
W
UA
SSSOOS
SOOSOSQSpSSS
WLO 4It
, OOOC
0x
000
O
(AO
=xm
����
�
fpAECHfpRdCl�Mo9Hp1ANNN
�N�A�
�
Mc
c
tR�
W J
aawo
J W
LLLL usoa�
Z t�O
V <�
LU
m ¢
LU
LU
W Z
u
T
W Q
F O
> w
r
w N
J
LO�p
w W
uj
IL
C9 tj
LU
. �?
Up W
IL W
0 p
NN
o
W
LLLLr>:UU
2 2 Z S 2 S 2 2
LiLLLL:LL000UUUUU
fn}LLLiLL>-�
C6 LL
Z m 0
?�
JJUUWw
JJJJW W W W W WW W
JUJJJ(q(/j
Jujlyjuj
L0 Lu
Q
`ca
0 N p
O W
m
.wd
Q
MLu
E
>
O aC Lau
p V
LuCL
N
aN
4c
N ^
Cp
a
UWZ
a
zi
�' 2 i►
d
CD
,^ 0
J O C
wrcN
wax
N
O
4c >
VO
°3 U) c U go
ro 7
Y z
m
u
w cc
>LL= Z
Co cc
m;:
c �Oj
«_ aids
m m o c
y
ns a €
Fi
�ZNui J
af
r
to o
dU ' 3 m ^vim a£i
E
`m�Q a
La
E
aU)i�
R
10
0J W
Wp
; N�
N'm—o 3 � `� '� c
�N c :,
c w
Iw—F-w3
IL
N
Va>
W R
o m m o L To v, �am� cEas� y a E E
C C > '> C �j > L«0 O 14 �' � t 0)
W
>w C
x
Q m id Lcp
7ncr�cs3a2 3v�33�p3ifN20>
C r9 i0 m is m
at LE m m g io
OJ N a° K°
o N
W
a Z
�-
�piL3:OqiipfC7ayU0p0N-<0
s
N
N Y N t0
Im
Q O. N t� ^ N m'
0 N N N N N N N N N t9
�ppwpp-dpa.aLL
t0 l0 l0 W W l% W N
yy yy�
O O f < P O
�pp �pp� pe NV
d Y O V N N N