HomeMy WebLinkAboutNORTHSIDE AZTLAN COMMUNITY CENTER PARKING - Filed CS-COMMENT SHEETS - 2016-07-12Project: Engines Lab Parking at Northside Atzalan Community Center
Project Description: This is a request to add 44 parking spaces west of the detention pond on
EconoLub and on city -owned property. This parking is for the Engines and
Energy Lab Expansion.
Current Planning's Issues:
Made By: Ted Shepard
Initial Date: 04/10/2013 Issue ID: 2 Topic: General Round: 1 Status: Active
Issue: 04/10/2013: With some of the off -site parking for the Engines Lab on the EconoLube property,
should this parking be signed accordingly? Should a note be added to the plans? Please coodrinate
an easement on Econo Lube property.
The agreement with Econo Lube is that no designated parking or signs are planned. Parking will be used
on a first come, first served basis
[Engineering Development Review's Issues:
Made By: Tyler Siegmund
Initial Date: 04119/2013 Issue ID: 1 Topic: General Round: 1 Status: Active
Issue: 04/19/2013: Show the west and south property line for the Center for Fine Art property (410 N
College Ave) adjacent to the site. See redlines.
The west and south property lines for the Center for Fine Arts property have been (,
shown per the Aztlan Community Center Plat. This includes the original lots from the L
Town of Fort Collins Annexation.
Initial Date: 04/19/2013 Issue ID: 2 Topic: General Round: 1 Status: Active
Issue: 04/19/2013: Show the right-of-way line along Willow St. It appears that parking is being proposed
in the Willow St right-of-way. Please revise to remove parking to private property, no parking is
allowed in the ROW.
The west and south property lines for the Center for Fine Arts property have been
shown per the Aztlan Community Center Plat. This includes the original lots from the
Town of Fort Collins Annexation.
Initial Date: 04/19/2013 Issue ID: 3 Topic: General Round: 1 Status: Active
Issue: 04/19/2013: Access easements from the adjacent property owners at 400 and 410 N College will be
needed for the proposed parking on their property.
An access easement has been provided for the Econlube site located at the Northwest
boundary of the site. Per your conversation with the City Surveyor and Reality
regarding the property of the Center for Fine Arts, it was understood that the southern
entrance is currently within an access easement and no further easements were
required.
* Resolved Issues displayed with a gray background
Page 1 d 8 April 24. 2013
a ..
Project: Engines Lab Parking at Northside Atzalan Community Center
Project Description: This is a request to add 44 parking spaces west of the detention pond on
EconoLub and on city -owned property. This parking is for the Engines and
Energy Lab Expansion.
Environmental Planning's Issues:
Made By: Lindsay Ex
Initial Date: 04/18/2013 Issue ID: 1
Issue: 04/18/2013: No comments.
Park Planning's Issues:
Made By: Craig Foreman
Topic: General Round: 1
Initial Date: 03/29/2013 Issue ID: 1 Topic: General Round: 1
Issue: 03/29/2013: No comments
Stormwater Engineering's Issues:
Made By: Jesse Schlam
Status: Active
Status: Active
Initial Date: 04/16/2013 Issue lD: 1 Topic: Erosion Control Round: 1 Status: Active.
Issue: 04/16/2013: The site disturbs more than 10,000 sq-ft and is in a sensitive area, therefore Erosion
and Sediment Control Materials need to be submitted. The erosion control requirements are in the
Stormwater Design Criteria Under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current
Erosion Control Materials Submitted do not meet all the requirements. Please resubmit Erosion
Control Plan with a Detail of a'wattle sediment trap' . Please submit and Erosion Control Report,
and Please submit an Escrow/ Security Calculation. If you need clarification concerning this
section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @
jschlam fcgov.com
An addendum to the original Engines and Energy Conversion Lab Erosion Control
Report has been prepared and submitted. The wattle sediment trap has been revised
to a sediment trap and is included within the Erosion Control Details. An Erosion
Control Escrow/ Security Calculation has been included within the submittal.
Initial Date: 04/16/2013 Issue ID: 2 Topic: Erosion Control Round: 1 Status: Active
Issue: 04/16/2013: Consult Matt Zoccali about issues revolving around the Aztlan Site. 970-224-6008
Matt Zoccali has received a copy of the submittal documents. With the current design,
we are minimizing the majority of the cut area to include the over excavation directly
next to the existing ribbon curb at the top of the detention pond bank. The only other
cut will include stripping of the site.
* Resolved Issues displayed with a gray background
Page 1 of 8 April 24, 2013
Project: Engines Lab Parking at Northside Atzalan Community Center
Project Description: This is a request to add 44 parking spaces west of the detention pond on
EconoLub and on city -owned property. This parking is for the Engines and
Energy Lab Expansion.
Made By: Wes Lamarque
Initial Date: 04/23/2013 Issue ID: 3 Topic: General Round: 1 Status: Active
Issue: 04/23/2013: The Minor Amendment does not comply with the Ordinance 152, which calls for any
redevelopment to provide 25% of the added pavement area to be pervious. At least 50% of the total
amount of new impervious has to also drain into an infiltrating system.
The site and drainage report has been revised to include 25% of the added pavement
area to be pervious pavers. All proposed impervious areas are design to pass over the
proposed pavers.
Technical Services's Issues:
Made By: Jeff County
Initial Date: 04/19/2013 Issue ID: 1 Topic: Construction Drawings Round: 1 Status: Active
Issue: 04/19/2013: Please change the titles in the index on sheet C0.00 to match the specific sheet titles.
See redlines.
Revised
Initial Date: 04/19/2013 Issue ID: 2 Topic: Construction Drawings Round: 1 Status: Active
Issue: 04/19/2013: Please change the benchmarks on sheet C0.01 to match the benchmarks shown on
sheet C0.00.
Revised
Initial Date: 04/19/2013 Issue ID: 3 Topic: Construction Drawings Round: 1 Status: Active
Issue: 04/19/2013: Should the title on sheet C0.01 be Northside Aztian Community Center?
Revised
Initial Date: 04119/2013 Issue ID: 4 Topic: Construction Drawings Round: 1 Status: Active
Issue: 04/19/2013: Please provide line & curve tables for the lines & curves shown on sheet C0.02.
Revised
Initial Date: 04/19/2013 Issue ID: 5 Topic: Construction Drawings Round: 1 Status: Active
Issue: 04/19/2013: There is cut off text on sheet C1.00.
Revised
* Resolved Issues displayed with a gray background
Page 1 of 8 April 24, 2013
Project: Engines Lab Parking at Northside Atzalan Community Center
Project Description: This is a request to add 44 parking spaces west of the detention pond on
EconoLub and on city -owned property. This parking is for the Engines and
Energy Lab Expansion.
Initial Date: 04/19/2013 Issue ID: 6 Topic: Lighting Plan Round: 1 Status: Active
Issue: 04/19/2013: Please correct the spelling of Aztlan in the title.
Revised
Initial Date: 04/19/2013 Issue ID: 7 Topic: Site Plan Round: 1 Status: Active
Issue: 04/19/2013: Please add a legal description for the property.
Legal description has been added
Initial Date: 04/19/2013 Issue ID: 8 Topic: Site Plan Round: 1 Status: Active
Issue: 04/19/2013: There is a line over text issue on sheet 1 of 1.
Corrected
Initial Date: 04/19/2013 Issue ID: 9 Topic: Site Plan Round: 1 Status: Active
Issue: 04/19/2013: Please correct the spelling of Northside & Aztlan in the title on sheet 1 of 1. Northside
is one word for the title of the project.
Corrected
Water -Wastewater Engineering's Issues:
Made By: Roger Buffington
Initial Date: 04/18/2013 Issue ID: 1 Topic: General Round: 1 Status: Active
Issue: 04/18/2013: No comments.
Zoning's Issues:
Made By: Gary Lopez
Initial Date: 04/08/2013 Issue ID: 1 Topic: General Round: 1 Status: Active
Issue: 04/08/2013: A sign contractor may be contacting you regarding the proposed replacement of the
lube shop's ground sign. They'll want to coordinate placement, etc.
Noted
Initial Date: 04/17/2013 Issue ID: 2 Topic: Landscape Plans Round: 1 Status: Active
Issue: 04/08/2013: I'd suggest an abutting 5' landscaping strip on the north side of the parking area on the
tube site. While this isn't a property line it acts somewhat like one in dividing the property. It should
include at least three trees.
After discussions with Ken Mannon and Gary Lopez on site, we have indicated a new
trash enclosure for the EconoLube property and an additional trees in the westernmost
parking lot island.
* Resolved Issues displayed with a gray background
Page 1 of 8 April 24, 2013
r
Project: Engines Lab Parking at Northside Atzalan Community Center
Project Description: This is a request to add 44 parking spaces west of the detention pond on
EconoLub and on city -owned property. This parking is for the Engines and
Energy Lab Expansion.
Initial Date: 04/17/2013 Issue ID: 3 Topic: General Round: 1 Status: Active
Issue: 04/17/2013: 1 understand that this affects at least two properties and they'll only be a pedestrian
and access easement affecting those. The two properties will need to also be brought up to the
LUC standards to the extent reasonably feasible. Well review those properties separately.
After discussions with Ken Mannon and Gary Lopez on site, we have indicated a new trash
enclosure for the EconoLube property and an additional trees in the westernmost parking lot island.
* Resolved Issues displayed with a gray background