HomeMy WebLinkAboutSTRACHAN FOURTH - Filed CS-COMMENT SHEETS - 2016-07-11Etyze'e-ein 0-or"."4n, MA150084 the Square September 30, 2015 The plans need to clearly identify and label that the remaining sidewalk along JFK is to be widened and improved. Reference detail 707.2 for the driveway reconstruction. Easement vacation requests, fees, and legals need to be received so that the requests can be routed and the legals reviewed. I also need information on how the easements were originally dedicated. It looks like one of the Waterline easements was dedicated by the Strachan Subdivision, Fourth Filing plat, but the others must have been dedicated by separate instrument as they are not shown on any of the plats. I need copies of the dedication documents or the reception numbers for those. Any needed easement vacation that doesn't have a line in it that has to be relocated will need to be vacated prior to approval of the utility plans. For the vacation of the easement in which the sanitary line is located. The easement vacation needs to be routed and all the utilities will need to agree that it can be vacated — or can be vacated once the sanitary sewer line is relocated. If that is the case, for that easement I will have the resolution written and the legal for this vacation before the plans are approved. Once the line has been removed and I am notified by utilities that it is okay to vacate, I will need a check for the filing fees and then I can proceed with the vacation of this easement. The easement will need to be vacated before any building permit for a structure to be located in this area can be issued. Any needed easement dedications will need to be received prior to approval of the utility plans and approval of the minor amendment. Additional information on the dedication and vacation process can be found here: Including base dedication formats. http://www.fceov.com/eneineerins/devrev.php Comment Number: 2 Comment Originated: 09/22/201.1 09/22/2015: Please fill out a Commercial Service Information (C-1). A link to this C-1 is below. http://www.fcgov.com/utilities/business/builders-and-developers/development-forms -guidelines-regulations Response; Noted, thank you. We understand that this can be completed with the building permit. Comment Number: 3 Comment Originated: 09/22/201 t 09/22/2015: Electric meter location in a confined area needs to be approved by Light & Power meter shop. These issues have been addressed and are awaiting comments. Response; Noted, thank you. Comment Number: 4 Comment Originated: 09/22/201. 09/22/2015: Please review our Electric Construction, Policies, Practices and Procedures to identify our meter and transformer standards. Please contact Project Engineering at 970-221-6700 with any questions. Response: Noted, thank you. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam@fcaov.com Topic: Erosion Control Comment Number: 2 Comment Originated: 09/30/201.1 09/30/2015: Erosion Control Report was acceptable from Phase 1 to include this work, with the minor changes all addressed in the letter from Sam. Erosion Control Escrow Currently retained for Phase 1 & 2 is sufficient to be kept for this phase 3 of construction. Erosion Control Plan has redlines that will need to be addresses please see returned documents. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email aschlam @fcgov.com Response: We met with Jesse onsite on 101212015 to discuss construction impacts and revisions to the erosion control plans. The plans have been revised as requested and a narrative discussion construction and erosion control procedures has been sent to Jesse via email. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty@fcgov.com Topic: Building Elevations Comment Number: 1 Comment Originated: 10/02/201 i 10/02/2015: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Response: Revised as requested Topic: Construction Drawings Comment Number: 2 Comment Originated: 10/02/201! 10/02/2015: Please make changes to Benchmark Statement as marked. See redlines. Response: Revised as requested. Comment Number: 3 10/02/2015: There are line over text issues. See redlines. Response: Revised as requested. Topic: General Comment Number: 4 Comment Originated: 10/02/201! Comment Originated: 10/02/201! 10/02/2015: FLOOR PLAN: There are line over text issues. See redlines. Response: Revised as requested. Comment Number: 5 Comment Originated: 10/02/201! 10/02/2015: FLOOR PLAN: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Response: Revised as requested. Topic: Landscape Plans Comment Number: 6 10/02/2015: There are line over text issues. See redlines. Response: Revised as requested. Topic: Site Plan Comment Number: 7 10/02/2015: There are line over text issues. See redlines. Response: Revised as requested. Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General Comment Number: 1 Comment Originated: 10/02/201.1 Comment Originated: 10/02/201! Comment Originated: 09/23/2015 09/23/2015: On sheet L-1 it shows existing tree locations to be removed. The locations labeled 1 and 2 are existing parking lot tree islands. These trees should not be removed. These trees, labeled 1 and 2, should be moved and placed in new tree islands at the south end of the proposed parking rows. Response: We will not be able to move these trees as requested. There are construction limitations to the request in comment Number 1 and we can review w3ith you in our site meeting noted above. We are replacing those 3 trees with 5 additional trees in the same parking field and feel we have more than compensated for their removal. It has been agreed on several occasions that we would not be required to introduce planters and trees at the south end of the parking field as we have on the entire site of the project. We most recently were told in a meeting with your staff and representatives of the City Managers staff that we would be able to continue developing the site in the manner we have to date. Comment Number: 2 Comment Originated: 09/23/2015 09/23/2015: The parking spaces along the south boundary of the Minor Amendment exceed the maximum 15 spaces. A tree islands should be placed in the middle of these RE: Response to Comments Letter for The Square, MA 150084, Round Number 1 Comment Summary: Department: Engineering Development Review Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Topic: Easements Comment Number: 3 Comment Originated: 09/30/2015 09/30/2015: Easement vacation requests, fees, and legals need to be received so that the requests can be routed and the legals reviewed. I also need information on how the easements were originally dedicated. It looks like one of the Waterline easements was dedicated by the Strachan Subdivision, Fourth Filing plat, but the others must have been dedicated by separate instrument as they are not shown on any of the plats. I need copies of the dedication documents or the reception numbers for those. Any needed easement vacation that doesn't have a line in it that has to be relocated will need to be vacated prior to approval of the utility plans. For the vacation of the easement in which the sanitary line is located. The easement vacation needs to be routed and all the utilities will need to agree that it can be vacated — or can be vacated once the sanitary sewer line is relocated. If that is the case, for that easement I will have the resolution written and the legal for this vacation before the plans are approved. Once the line has been removed and I am notified by utilities that it is okay to vacate, I will need a check for the filing fees and then I can proceed with the vacation of this easement. The easement will need to be vacated before any building permit for a structure to be located in this area can be issued. Response: Easement and vacation information was sent to Sheri on 101512015. Comment Number: 4 Comment Originated: 09/30/2015 09/30/2015: Any needed easement dedications will need to be received prior to approval of the utility plans and approval of the minor amendment. Response: Noted. Legal descriptions for proposed easements have been emailed to Sheri. Dedication documents will be completed and submitted as soon as those been reviewed by the City. Topic: General Comment Number: 1 Comment Originated: 09/30/2015 09/30/2015: The plans need to clearly identify and label that the remaining sidewalk along JFK is to be widened and improved. Response: Revised as requested. Comment Number: 2 Comment Originated: 09/30/201.1 09/30/2015: Reference detail 707.2 for the driveway reconstruction. Response: Revised as requested. Comment Number: 5 Comment Originated: 09/30/201! 09/30/2015: Additional information on the dedication and vacation process can be found here: Including base dedication formats. http://www.fcgov.com/engineering/devrev.php Response: Noted, thank you. Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 10/05/201.1 10/05/2015: Use the newly developed landscape notes that the Planning Department has developed. These can be obtained from Noah Beals. Response: Notes have been included as requested. Comment Number: 2 Comment Originated: 10/05/201 10/05/2015: At a recent site meeting with Ralph Zentz from the City Forestry Division existing tree number 6 and 12 were determined in agreement with the applicant to be retained. They are both marked for removal in the tree inventory and mitigation table. These two trees should be recorded to preserve in the table. Response; Tree #6 will remain in place, but Tree #12 will need to be removed. Comment Number: 3 Comment Originated: 10/05/201! 10/05/2015: Evaluate the construction impact to existing tree number 6 and 12 and explore construction modifications to reduce root system impact. Tree number 12 is shown with the curb right against the tree. Placing a peninsula landscape area of some form on its west side might be a solution. Provide information on the construction impact to these two trees by a private certified arborist. Forestry staff is available to meet on site with the projects representative and the projects private arborist to review how these trees will be protected. Response Tree #6 will remain in place, but Tree #12 will need to be removed. We will meet with you or your staff and discuss the reasons for replacing the tree. We will have a certified Arborist with us on site. Department: Light And Power Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com Topic: General Comment Number: 1 Comment Originated: 09/22/201I 09/22/2015: Modification charges will apply for additional electrical capacity fees, transformer upgrade and any relocation of primary service (if needed). Response: Noted, thank you. 17 spaces/ Response: A tree island has been added as requested: F" '\ MA150084 the Square October 25, 2015 Any needed easement dedications will need to be received prior to approval of the utility plans and approval of the minor amendment. Additional information on the dedication and vacation process can be found here: Including base dedication formats. httr)://www.fcgov.com/eng!neering/­devrev.i)hp The easement vacation requests were received and have been routed. There will be no problem in vacating the portions of the waterline easement, the water easement, the power easement, and the sewer easement. The identified utility easement cannot be vacated by the City since it is a private easement and was not dedicated to the City. - The legals for these are still in review and I will pass along any comments once the reviews have been finalized. - Resolutions for the vacations have been written and will be sent to the City attorneys office for review. - Once I know the final number of pages for these documents I will let you know what the filing fee costs will be. The legal for the drainage easement has been routed for review — once that review has been finalized any comments will be passed along. Once we have a final document I can provide information on the filing fees cost to be provided. I have not heard from utilities as to whether the private sewer main needs to be within a public easement or is okay to just be within a private easement. Once that is known — we will know whether the easement for the relocated sewer main will need to be dedicated to the city or can be a private easement. Fees are still owed for the easement vacation and dedication process. Since we still do not yet know the final number of these to be processed this can wait, but will need to be paid prior to approval and filing of those documents. The DCP numbers have been reviewed, but I need to find out from utilities if the private sewer main will need to be inspected by the City. If it does not then the inspection number and security will need to be adjusted.