City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: VO--'IP-5 Issuance Date: U/�� �4�p
Project Name: Harmony Cottages
Project AKA:
Project Location: SE Corner Harmony Rd & Taft Hill Rd
Permittee: Sara Coutts — The Neenan Company
City and developer contacts: See attached Exhibit `A'for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee $ 400.00
Construction Inspection Fee $ 7766.30
Pavement Impact Fee — excavation permit $ 1682.20
Total amount due $ 9848.50
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$99,254.00
Form of security deposited with the City: Che LL
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
Page 1 of 5
conformance with City requirements.
3. Construction time restrictions: N/A
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to
any construction activities on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMPs) that can be installed prior to
Page 2of5
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins. The applicant also understands that at no time pollutants,
especially dirt, are allowed to leave the construction site (either by drainage, wind, or track out)
and that the applicant shall immediately address, and correct the issue regardless of being
formally directed by the City.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: N/A
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: Date: U 12.9
Approval for issuance:
City Engineer Appro Date:
(Permit Issuance Date)
Page 3 of 5
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Harmony Cottages
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Katie Sexton
281 N. College Avenue, Fort Collins, CO 80524
(970) 221- 6501
Construction Inspector: Kim Keiswetter
281 N. College Avenue, Fort Collins, CO 80524
(970) 221-6605
Cell (970) 568-6546
Current Planner: Clay Frickey
281 N. College Avenue, Fort Collins, CO 80524
(970) 224-6045
Water Utilities Engineering:
Shane Boyle
700 Wood Street, Fort Collins, CO 80521
(970) 221-6339
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
(970) 224-6700
Natural Resources: Rebecca Everette
281 N. College Avenue, Fort Collins, CO 80524
(970) 416-2625
Traffic Operations: Martina Wilkinson
625 Ninth Street, Fort Collins, CO 80524
(970) 221-6887
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
(970) 221-6815
Forestry: Tim Buchanan
413 S. Bryan Avenue, Fort Collins, CO 80521
(970) 221-6361
Page 4of5
� i }
Light and Power: Janet McTague
700 Wood Street, Fort Collins, CO 80521
(970) 224-6154
Developer's Contact Persons:
Project Manager: John Barberio — JB Consulting Services, LLC
1619 Streamside Dr. Fort Collins, CO 80525
(970)204-4321
Cell (970) 218-4456
Developer/owner: Ron Arndt — Harmony Limited, LLC
PO Box 271519 Fort Collins, CO 80527
(970) 232-3605
Project Engineer: Skylar Brower — Interwest Consulting Group, Inc.
1218 West Ash, Unit C Windsor, CO 80550
(970) 674-3300 ext. 101
Cell (970) 460-1091
Architect/Planner: Russ Lee — Ripley Design Inc.
419 Canyon Ave. Suite 200, Fort Collins, CO 80524
(970) 224-5828
General Contractor: Sara Coutts — The Neenan Company
3325 S Timberline Rd. Fort Collins, CO 80528
(970) 493-8747
Cell (970) 990-0122
Page 5 of 5
do dam �m@mm>
NZ ZO g�v_o�5m 7xm = m 9ff� 3
r 0ID v �Ss'w � wmo �' otb' 'm�� DD7o
C -I D o c m, �! y o �. d. a uJ 10 r
rrCy>9 m W m 3 3 ��vr "'� ii 0� c�i' �WZ O'
r�Z� H °— ��j r w y �m m On
z 1n ryT w n N 7 7 Ip y N�
Co y W 7 G r f"D � N Zp N
= -4 m (n ; m a
FA C v � c N 9
=mnU!
AA v
� m
ov,
C TC> W + m m rr DZ
�� cnmcnr Y)pprrr r ���y��D�rrrr
nn. �
TD�In -<7<7<?1T7n UI 0000000OT7?1T CiCi TIT CUJ
0 $ xxxxsxxx xx mT
v
¢Zip 0 Boa;
N mMIM
m� v o
mm =m
G _ AA _ wA�D
+O W O A OTAVW
N .0 0 E (A = T
v c vAy��c�
G �q fA �y ��pp yyqq EA EA v � � C H O m
tZii O oo (ASTCACA u�Ni its 8000000000f�0N OoOCA OACNn �� m�ZyC
0 0 O o o O o o O C C O C O G G O C G C O C S C m m
o0 0000000S 0000S000SoSo 0000
O.'a)0
O � 1 Ic r
T
m D > c�'
fA
�A <A FA vi v+ N En EAV to $4 C v
y1 N N A CT W N Of fJ GH
00 NOA00 W 00 pO OO EA pop�OfA EA fAO V �q EAOfAN
O OOOOSOOOOSN OOOON(r
C O G O C 0 0 0 0 0 0 0 0 C G O C O C O C C O G O C C C
A O O CD
0 0 0 0 0 0 0 0 0 0 0 0 0 0 =
w
m
m <M0
y v
g 69 fA vi en fA fA j' fA to
�'r' �vzz
ooCA) 0 �o wwwwoo
?AAGOOA C oo000C�1-400 6bUn CA V-I
Z - ocn cncna,000cn oS0000000000 00000o mZ0
m
o m�
r " r z
c
N V df E� � Efl-�fA N�N Efl E��pAp b9
v O WfAO W OfAO r V V4A - WS��yy-4ACwI�EAy� too (A�q -4�p -4 pp'
OD ,4 NO W O WOW 00p00 OOOpOUf 0o00 fl) OOpi00A
O O S O O O O O S S 0 0000
S O O O O O O O 0
S 0 0 0