February 11, 2015
Mike McBride
BHA DESIGN, INC
1603 OAKRIDGE DR
Fort Collins, CO 80525
RE: Avago Building 3 - Office/Warehouse/Test Facility, MA150006, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Gary Lopez, at 970416-2338 or glopez@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slanoenberger cgov.com
Topic: General
Comment Number: 1
Comment Originated: 02/06/2015
02/06/2015: No text should be in the revision blocks when mylars are submitted
for signatures. The revision block is to be used to identify revisions to the plans
after they are approved.
Response: Noted.
Page 4 of 10
Please notify CPI immediately upon receipt of these meeting minutes of any additions or corrections.
Avago Building 3 - City Staff Review #1
December 17, 2014
Comment Originated: 02/06/2015
02/06/2015: Need to show the Drainage Easements and the emergency
access easement that is needed on at least one of the overall sheets.
Response: Noted.
Comment Number: 3 Comment Originated: 02/06/2015
02/06/2015: Information on the process and procedure for the dedication of
easements by separate document can be found at:
http://www.fcgov.com/engineering/devrev.php I can answer any specific
questions you may have regarding this process.
Response: Noted.
Comment Number: 4 Comment Originated: 02/06/2015
02/06/2015: The area to be dedicated as drainage easement shall be
determined by Stormwater. The area to be dedicated as emergency access
easement shall be determined by PFA.
Response: Easements have been provided or will be recorded with a separate instrument.
Comment Number: 5
Comment Number: 2
Comment Originated: 02/06/2015
02/06/2015: Include the department labels in the signature blocks on the utility
plans. They are included and shown on sheet C300, but not the other sheets.
Response: Labeling has been revised.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchananMcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 02/09/2015
02/09/2015:
Tree Selection Comments:
Shumard Oak is quite similar to Texas Red Oak and generally has better
availability particularly at the 3.0 inch caliper size. Consider using Shumard oak
in place of Texas red oak.
Response: Texas Red Oak has been replaced by Shumard Oak.
Scotch pine has developed some recent problems with insect issues that
makes it not generally preferred for planting in the Fort Collins area. Consider
using another species of pine.
Response: Scotch Pine has been removed.
Page 5 of 10
Please notify CPI immediately upon receipt of these meeting minutes of any additions or corrections.
Avago Building 3 - City Staff Review #1
December 17, 2014
Comment Number: 2 Comment Originated: 02/09/2015
02/09/2015:
An additional site meeting may be needed to identify the inventory and
mitigation on trees 138 —146. Please schedule a site meeting with the City
Forester if needed to obtain this information.
Response:Done
Comment Number: 3 Comment Originated: 02/09/2015
02/09/2015:
Tree transplanting comments:
1. The final landscape plan should include the final tree transplanting
information. It appears that trees to transplant are listed as TBD.
Response: Trees listed as TBD have been corrected.
2. Show locations on final landscape plan where transplanted trees will be
moved to if this is not already included..
Response: Final locations have been added to the landscape plan
3. Provide a note if it does not already occur that says in effect that all tree
transplanting will follow the recommendations of a qualified tree transplanting
contractor for sized of tree spade, season of the year, staking, building water
basins and for providing after care which includes irrigation.
Response: Notes have been provided.
4. A mitigation credit of 1 tree per transplanted tree can be recorded in the
inventory schedule for any transplanted tree that meets or exceeds the
mitigation size below and is less than 6 inches. For trees over 6 inches that are
transplanted the mitigation credit would be the actual mitigation value.
Canopy shade tree 3.0 inch caliper
Ornamental tree 2.5 inch caliper
Evergreen tree 8 feet height
Response: Final mitigation calculations have been provided.
5. Please evaluate if any of the larger pinon pine which are trees 107-121 can
be transplanted.
Response: An additional category has been added.
6. On the final landscape plan for any transplanted tree list it in the reason
column as transplanted and not removed.
Response: An additional category has been added.
Comment Number: 4
02/09/2015:
Comment Originated: 02/09/2015
Please use some form of labeling that is quite clear such as an X for removal
over the tree symbol and the letters T or K by the actual tree number for trees to
Transplant or Keep in place.
Response: Labeling has been revised.
Page 6 of 10
Please notify CPI immediately upon receipt of these meeting minutes of any additions or corrections.
Avago Building 3 - City Staff Review #1
December 17, 2014
Comment Number: 5
02/09/2015:
Comment Originated: 02/09/2015
Please organize the tree information from the table below the table in the
following format.
Total trees to remove
Total trees to transplant
Total mitigation required
Total trees kept in place
Mitigation trees
Additional tree planting
Transplanted trees
Total tree planting (sum of the three items above)
Response: Table has been provided.
Department: Stormwater Engineering
Contact: Shane Boyle, 970-221-6339, sboyleffcgov.com
Topic: Drainage Report
Comment Number: 1 Comment Originated: 02/06/2015
02/06/2015: Please update the detention pond calculations in the drainage
report using the City approved Modified FAA method for calculating detention
volume.
Response: Calculations have been updated
Topic: General
Comment Number: 2 Comment Originated: 02/06/2015
02/06/2015: Overall, the drainage and grading concept presented is excellent.
It is understood there will be some evolution in the specifics of the design from
what is presented in these plans so another detailed round of review may be
warranted with the next submittal.
Response: Noted.
Comment Number: 3 Comment Originated: 02/06/2015
02/06/2015: Please remove the drive circulation arrows from the Grading and
Drainage Plans to avoid confusion with proposed site drainage pattern.
Response: Noted and revised
Page 7 of 10
Please notify CPI immediately upon receipt of these meeting minutes of any additions or corrections.
Avago Building 3 - City Staff Review #1
December 17, 2014
Comment Number: 4 Comment Originated: 02/06/2015
02/06/2015: Please contact me in order to receive a detention pond outlet
detail in CAD format that can be modified to match the proposed outlet
configuration. Also please note the details and tables in the current plan set
have not been updated to reflect proposed site design.
Response: Noted.
Comment Number: 5 Comment Originated: 02/06/2015
02/06/2015: The LID design looks great but it is understood this is also going
to be evolving as the site design progresses. Regarding the proposed asphalt
cuts, it appears these cuts have been configured in such a way as to minimize
the amount of asphalt cut in order to minimize the pervious pavement
requirements. If this is the case, I would support the idea of being a little flexible
on this requirement in order to make these cuts work better for the proposed
site work.
Response: Noted and appreciated.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icountyfficgov.com
Topic: Building Elevations
Comment Number: 1
02/06/2015: No comments.
Topic: Construction Drawings
Comment Number: 2
Comment Originated: 02/06/2015
Comment Originated: 02/06/2015
02/06/2015: The City has moved to the NAVD88 vertical datum. Please
provide the following information in the EXACT format shown below.
If your project is started on NAVD88 datum:
1) PROJECT DATUM: NAVD88
BENCHMARK #1 w/ DESCRIPTION
ELEVATION:
BENCHMARK #2 w/ DESCRIPTION
ELEVATION:
OR, if project has already been surveyed in NAVD29 Unadjusted datum:
2) PROJECT DATUM: NGVD29 UNADJUSTED (OLD CITY OF FORT
Page 8 of 10
Please notify CPI immediately upon receipt of these meeting minutes of any additions or corrections.
s
Avago Building 3 - City Staff Review #1
December 17, 2014
COLLINS DATUM)
BENCHMARK #1 w/ DESCRIPTION
ELEVATION:
BENCHMARK #2 w/ DESCRIPTION
ELEVATION:
If using NGVD29 UNADJUSTED the following equation statement will be
needed.
NOTE: IF NAVD 88 DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NAVD88 = NGVD29
UNADJUSTED + X.XX'
Response: Noted and revised.
Comment Number: 3 Comment Originated: 02/06/2015
02/06/2015: All benchmark statements need to match on all sheets.
Response: Noted and revised.
Comment Number: 4 Comment Originated: 02/06/2015
02/06/2015: The lighter text & linework marked on sheet C102 is not
acceptable. It will not scan or reproduce. Please darken it up on all sheets. See
redlines.
Response: Noted and revised.
Comment Number: 5 Comment Originated: 02/06/2015
02/06/2015: Sheets C207 & C208 have the titles running out of the titleblock
and off the right side of the sheet.
Response: Noted and revised.
Comment Number: 6 Comment Originated: 02/06/2015
02/06/2015: The sheets in the keymaps on sheets C209 & C210 are hatched
backwards.
Response: Noted and revised.
Comment Number: 7
02/06/2015: There are text over text issues. See redlines.
Response: Noted and revised.
Topic: Landscape Plans
Comment Number: 8
02/06/2015: There are line over text issues. See redlines.
Response: Noted and revised.
Comment Originated: 02/06/2015
Comment Originated: 02/06/2015
Page 9 of 10
Please notify CPI immediately upon receipt of these meeting minutes of any additions or corrections.
Avago Building 3 - City Staff Review #1
December 17, 2014
Comment Number: 9
02/06/2015: There are text over text issues. See redlines.
Response: Noted and revised.
Topic: Lighting Plan
Comment Number: 10
02/06/2015: No comments.
Topic: Site Plan
Comment Number: 11
02/06/2015: There are line over text issues. See redlines.
Response: Noted and revised.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinsonfficgov.com
Topic: General
Comment Number: 1
Comment Originated: 02/06/2015
Comment Originated: 02/06/2015
Comment Originated: 02/06/2015
Comment Originated: 02/06/2015
02/06/2015: traffic operations provided comments back via email on January
30th. This included wanting additional information for the TIS regarding the
Ziegler/Harmony intersection, the right turn volumes at the HP entrance at
Harmony, and a summary table of existing / proposed employees on site.
Response: Traffic study has been updated.
Department: Water -Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sboyle cgov.com
Topic: General
Comment Number: 1
Comment Originated: 02/06/2015
02/06/2015: It is not anticipated there will be changes to the public water or
sewer infrastructure with this project. If that changes, please contact Water
Utilities Engineering to coordinate.
Response: Noted.
Department: Zoning
Contact: Gary Lopez, 970-416-2338, gloaez ccgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/29/2015
01/29/2015: Please show building dimensions on site plan.
Response: Dimensions have been provided.
Page 10 of 10