Loading...
HomeMy WebLinkAboutSUNRISE RIDGE FIRST FILING REPLAT - Filed CS-COMMENT SHEETS - 2016-05-20Fort Collins FINAL PLAN c�nent R6.EVISION,Planning COMMENT 281 N. College Ave. Fort Collins, CO 80524 � HE Fax 970-224-6134 ET r, � DATE: October 19, 2012 TO: Development Review Engineering PROJECT PLANNER: Ted Shepard FDP 120009 Sunrise Ridge First Filing Replat 2nd Round of Review Please return all comments to the project planner no later than the staff review meeting: October 31, 2012 Note - Please identify vour redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below, attached, or Accela) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site _Drainage Report _Other. Utility Redline Utility _Landscape Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80622 970.221.6760 970.224.8134 - fax fcgov. com/developmentreview October 31, 2012 David Houts Bogard Construction, Inc. 300 E. Horsetooth Rd. #103 Fort Collins, CO 80528 RE: Sunrise Ridge First Filing Replat Major Amendment & Final Plan, FDP120009, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Tyler Siegmund, 970.221.6501, teegmund@fcgoov.com Topic: General Comment Number: 9 Comment Originated: 10/30/2012 10/30/2012: Regarding the Sunrise Ridge First Filing Development Agreement, Amendment Agreement No.1, payments of $4,545.91 will be due prior to the issuance of each of the next four building permits for the developerls local street portion of the roadway costs for Strauss Cabin Road. Topic: Plat Comment Number: J Comment Originated: 10/30/2012 1. There are a few of the standard plat language statements missing from the plat. Please add: (a) Attorneys Certification (b) Notice Statement (c) Private conditions note Please contact me and I will provide you with the notes that need to be added. Topic: Site Plan s Department: Engineering Development Review Contact: Tyler Siegmund, 970.221.6501, tsiegmund �fcgov.com Topic: Site Plan Comment Number:0 1 Comment Originated: 07/24/2012 10/30/2012: Site note 10 is a little confusing, please revise the note to read: A drive approach permit will be required for driveway installation on all lots cutting the existing curb & gutter. Lots accessing off of Daylight Court may not NEED TO cut the existing curb & gutter for the driveway to function ...... ect. 07/24/2012: A drive approach permit will be required for driveway installation on all lots cutting the existing curb and gutter. A note referencing this needs to be added to the site plan. Comment Number:( Comment Originated: 07/24/2012 10/30/2012: Please revise site note #15 to read: Each lot shall only be permitted ONE drive approach per lot. 07/24/2012: Each lot shall only be permitted one drive approach per lot. Please add a note referencing this on the site plan Comment Number: � Comment Originated: 07/24/2012 10/30/2012: Please revise Site Note #13 to reference the City of Fort Collins Engineering Department. 07/24/2012: Access agreements/easements will be required where two lots are sharing a driveway. It will be the applicants responsibility to file the documents with the county clerks office and submit a copy to Engineering. Comment Number• Comment Originated: 10/30/2012 10/30/2012: Trac B is not labeled on the site plan. If Tract B is part of this replat please label on the plan, or if it is not part of the replat please remove the legal description. Department: Environmental Planning Contact: Lindsay Ex, 970-224.6143, lex „ fcgov.com Topic: General Comment Number: 1 07/23/2012: No comments. Department: Light And Power Contact: Doug Martine, 970-224.6152, dmartine@.fcgov.com Topic: General Comment Originated: 07/23/2012 Comment Number: 1 Comment Originated: 07/17/2012 07/17/2012: The existing electric utility system was installed for duplexes to only lots 1,2,10,11, & 12. Additional electric development and system modification charges will apply. Each dwelling unit must be individually metered (from one service line). The developer will need to coordinate electric facilities & charges with Light & Power Engineering at 221-6700. Department: Stormwater Engineering Contact: Wes Lamarque, 970.416.2418, Wamaraue[c0cgov.com Topic: General Comment Number: 1 Comment Originated: 07/24/2012 07/24/2012: Please revise the hydrology calculations. The impervious area for the site will increase. This may require additional quantity detention and water quality treatment. Department: Technical Services Contact: Jeff County, 970.221.6588, lcountdfcgov.com Topic: Plat Comment Number: 2 Comment Originated: 07/23/2012 07/23/2012: The title will need to be changed to "Sunrise Ridge, First Filing, First Replat". Comment Number: 9 Comment Originated: 07/24/2012 07/24/2012: Please add the missing title commitment information on sheet 1. Comment Number: 10 Comment Originated: 07/24/2012 07124/2012: Are there leinholders for these properties? If so, please add the leinholder signature block. Comment Number: 11 Comment Originated: 07/24/2012 07/24/2012: Please show all dedication information for the adjacent street right of way. Comment Number: 12 Comment Originated: 07/24/2012 07/24/2012: Please show all right of way widths, including radi. Comment Number: 13 Comment Originated: 07/24/2012 07/24/2012: Please provide monument records for all public corners shown. Topic: Site Plan Comment Number: 3 Comment Originated: 07/23/2012 07/23/2012: The title will need to be changed to "Sunrise Ridge, First Filing, First Replat". Comment Number: 4 Comment Originated: 07/23/2012 07/23/2012: Please change the sub -title to match the Subdivision Plat. Comment Number: 5 Comment Originated: 07/23/2012 07/23/2012: Please change the legal description to match the Subdivision Plat. Comment Number: 6 Comment Originated: 07/23/2012 07/23/2012: Why are Lots 3 & 7-12 of Sunrise Ridge, First Filing shown on this plan? Comment Number: 7 Comment Originated: 07/23/2012 07/23/2012: There are many line over text issues. Comment Number: 8 Comment Originated: 07/23/2012 07/23/2012: Please change the sheet numbering to "1 of V. Department: Traffic Operation Contact: Ward Stanford, 970.221.6820, wstanford(rDfcuov.com • . - Department: Traffic Operation Contact: Ward Stanford, 970-221.6820, wstanford@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/25/2012 07/25/2012: Reviewing the past units vs. the new proposed number and type of units the extra traffic amounts to only 40 vehicles per day and only 4-12 per a peak hour. As such no TIS is required and no significant impacts are expected to area roadways. No issues for Traffic Operations. Department: Zoning Contact: Peter Barnes, 970-416.2355, Pbarnes(dlfcgov.com Topic: Site Plan Comment Number: 1 Comment Originated: 07/17/2012 10/22/2012: Site note #6 explains the setback modification to reduce the side setback to 10' on numerous lots, including lot 7. However, the building envelope shown on the site plan for Lot 7 indicates a 9' side setback. Need to clarify which setback is correct - 9' or 10'. 07/17/2012: The site plan shows the requested 10' setback for Lots 1 and 2, but for lots 4, 5, and 7, the setback dimension isn't shown. Instead, it shows a shaded portion of the building extending beyond a line that I assume is the building envelope line that complies with the required 20' setback. A 10' setback dimension needs to be shown for these lots in the same manner shown for Lots 1 and 2.