November 08, 2013
Brent Cooper
Ripley Design, Inc.
401 W. Mountain Ave #100
Fort Collins, CO 80526
Responses:
Planning Response: Ripley Design
Civil Response: Northern Engineering
Architect Response: VFLA
Lighting Response: BF Hammond
RE: Miramont Health Office Building, MA130083, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or
nbeals@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Tyler Siegmund, 970.221.6501, tsiegmund@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/08/2013
11/08/2013: As part of development or redevelopment, the City of Fort Collins Land Use Code
and the Fort Collins Municipal Code requires that rights -of -way, easements and public
infrastructure adjacent to the development or redevelopment site must comply with current
design standards. If substandard conditions exist then the development project is responsible
to bring substandard conditions up to current standards.
Response: Acknowledged
Comment Number: 2
Comment Originated: 11/08/2013
11/08/2013: The main access drive approach off of Redwing does not meet ADA standards
and is in poor condition. Currently, the attached sidewalk leads pedestrians to a 6" curb drop
contact Jesse Schlam 970-218-2932 or email @ jschlam(c.fcgov.com
Response: Please see the revised report and plans.
10/29/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion
and Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter
7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements.
Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning this section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970.416.2418, wlamargueD-fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 12/12/2013
12/12/2013: Please clarify if the underdrain pipe is 8 inches or 6. The utility plan says 8 inches
and the detail says 6.
Response: The plans have been revised to dictate a 6" PVC slotted underdrain.
Department: Technical Services
Contact: Jeff County, 970.221.6588, jcounty@fcaov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 11/07/2013
12/06/2013: This has been changed, but the "of a tract of land located in Tract "A"" needs to be
removed. See redlines.
Response: Revised
11/07/2013: Please add the Subdivision Plat name to the Basis Of Bearings on sheet C0.00.
See redlines.
Comment Number: 6 Comment Originated: 11/07/2013
12/06/2013: Please mask the marked text on sheet C1.00. See redlines.
Response: Revised
11/07/2013: Please mask the marked text on sheet C1.01. See redlines.
Topic: Landscape Plans
Comment Number: 8
12/06/2013: No comments.
11/07/2013: No comments.
Topic: Lighting Plan
Comment Originated: 11/07/2013
Comment Number: 14 Comment Originated: 12/06/2013
12/06/2013: Please change the title to "Miramont Health Office Building".
Response: Changed
. ' Topic: Site Plan
Comment Number: 13
12/06/2013: There are still issues. See redlines.
Response: Corrected
Comment Originated: 11/07/2013
11/07/2013: Please mask the marked text on sheet 2. See redlines.
Comment Number: 15 Comment Originated: 12/06/2013
12/06/2013: What is the 30' after Redwing Road on sheet 2? See redlines.
Response: Corrected
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbealsfaUggoy.corn
Topic: General
Comment Number: 1 Comment Originated: 10/28/2013
12/05/2013: The dimensions of the trash/recycling enclosure were included, but the concrete
pad was not labeled on the site plan or the utility set.
Response: Labeled as concrete
10/28/2013: The Site plan will need to label the dimensions of the trash enclosure. Also it is
unclear at this time if the trash enclosure is located on the concrete pad and designed with
walk-in access. Please make this clear on the site plan.
Comment Number: 4 Comment Originated: 10/28/2013
12/05/2013: The meter locations where identified but where is the mechanical/utility equipment?
Response: The roofs of the proposed building form a central mechanical well that will hide rooftop
mechanical equipment. Dashed lines indicating the location of this well have been added to the
architectural elevation drawing sheets.
10/28/2013: Site, Landscape and Elevation drawings should include the mechanical/utility
equipment locations and notes on painting and screening.
Comment Number: 5 Comment Originated: 10/28/2013
12/05/2013: The Lighting plan statistics table did not change. Please calculate for the parking
area (drive aisles and spaces) the average foot-candle and verify it is at least 1 foot-candle.
Also the Lighting plan printed really blurry this round it was clear the first round.
Response: Chart has been updated.
10/28/2013: The Lighting plan in the statistics table it should call out the parking area by itself.
The parking area should have and average 1 fc.
Comment Number: 6 Comment Originated: 12/05/2013
12/05/2013: The owner certification signature block is not necessary on the cover sheet.
Response: This has been removed
at the drive approach. A new drive approach will need to be constructed to meet current
standards. Refer to LCUASS drawing 706. See redlines.
Response: A new drive approach has been proposed per standard detail 706. Detail 706 has been
included within the detail sheets.
Comment Number: 3
Comment Originated: 11/08/2013
11/08/2013: The existing handicap ramp at the southwest comer of Drake/Redwing, adjacent to
the site, does not meet current ADA standards for handicap access. This project will need to
reconstruct the handicap ramp to meet current standards.
Response: A new handicap ramp is proposed at the southwest corner of Drake and Redwing and
conforms to ADA standards.
Comment Number: 4 Comment Originated: 11/08/2013
11/08/2013: This project is responsible for dedicating any right-of-way and easements that are
necessary for this project. It is not clear at this point how much right-of-way exists along Drake
Rd. Per Larimer County records, approximately 92ft of right-of-way exists along Drake at this
location. The proposed utility plans with this project reference 100ft of right-of-way that exists.
® Current standards for Drake Rd, a 4 lane arterial road, requires a minimum of 102ft total
right-of-way needed (constrained arterial road standard), with this property responsible for half,
or 5lftof right-of-way. Initially, it appears that dedication of additional right-of-way will be
needed at this location. Please contact me to discuss the right-of-way issue further.
Response: The current ROW for Drake Road is 100' wide with 50' half ROW. Additional ROW of 1' in
width by separate document. A legal description and exhibit has been included for review.
Comment Number: 5
Comment Originated: 11/08/2013
11/08/2013: There is an existing power pole that encroaches into the sidewalk along Drake Rd,
adjacent to the site that is an existing hazardous condition. The sidewalk will need to be routed
around the pole at this location to provide adequate pedestrian connectivity. See redlines
Response: The sidewalk is proposed to route around the existing power pole as we discussed.
Comment Number: 6 Comment Originated: 11/08/2013
11/08/2013: The building expansion is encroaching into existing utility easements on -site. The
utility easements will need to be vacated by replat of the property or by separate document.
Please contact me for additional information on the process to vacate utility easements by
separate document.
Response: The building has been revised to only encroach within the utility easement to the south. This
area will be vacated by separate document and is included within this submittal for your review.
Department: Forestry
Contact: Tim Buchanan, 970.221.6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1
11 /07/2013:
Comment Originated. 11/07/2013
Please add this Tree Protection note:
Pruning of off -site trees that have canopy that extends over the project shall follow the
recommendations of an ISA Certified Arborist and occur with permission of the adjacent
property owner. Tree pruning work shall be performed by a City of Fort Collins Licensed
Arborist.
Response: Note added.
Comment Number: 2 Comment Originated: 11/07/2013
11/07/2013:
Add additional text to Tree Protection note number 11 that says that tree pruning and removal
shall be by a company that holds a City of Fort Collins Arborist License.
Response: Added
Comment Number: 3 Comment Originated: 11/07/2013
11/07/2013:
Evaluate if it is feasible to add trees to the two peninsula areas by the entry off of Redwing
Road.
Response: Trees added to each island
Department: Light And Power
Contact: Doug Martine, 970.224-6152, dmartine@f_cqov.com
Topic: General
Comment Number: 1 Comment Originated: 10/25/2013
10/25/2013: Records indicate that the existing electric service is 800 amps at 120/240 volt. No
increase in electric service can be provided at this voltage. If any changes are necessary,
please contact Light & Power engineering at (970)221-6700 to determine costs.
Response: Acknowledged.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218.2932, jschlam(&-fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 10/29/2013
10/29/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion
and Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter
7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements.
Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning this section, or if there are any questions
please contact Jesse Schlam 970-218-2932 or email @ ischlam fcgov.com
Response: A Erosion and Sediment Control Report has been prepared and is submitted electronically.
Contact: Wes Lamarque, 970.416.2418, w1amarguef0cgov.com
Topic: General
Comment Number: 2
Comment Originated: 11/08/2013
11/08/2013: Please include a discussion and the design of the rain garden within the drainage
letter. The rain garden should be designed per Urban Drainage with an underdrain.
Response: A section has been included discussing the rain garden design.
Comment Number: 3 Comment Originated: 11/08/2013
11/08/2013: Please include all drainage details within the utility plans.
Response: All drainage details have been included within the submittal.
Department: Technical Services
Contact: Jeff County, 970.221.65889 jcounty(&-fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 11/07/2013
11/07/2013: There is aline over text issue on sheet 5. See redlines.
Response: The line over text issue on sheet 5 has been corrected.
Comment Number: 2 Comment Originated: 11/07/2013
11/07/2013: Please change the title on both sheets to "Miramont Health Office Building". See
redlines.
Response: The title on both architectural elevation sheets has been changed.
Topic: Construction Drawings
Comment Number: 3
Comment Originated: 11/07/2013
11/07/2013: Please add the Subdivision. Plat name to the Basis Of Bearings on sheet C0.00.
See redlines.
Response: Revised
Comment Number: 4
Comment Originated: 11/07/2013
11/07/2013: Please correct the typo in the description of benchmark 1-99 on sheet C0.01. See
redlines.
Response: Revised
Comment Number: 5 Comment Originated: 11/07/2013
11/07/2013: There is aline over text issue on sheet C1.00. See redlines.
Response: Revised
Comment Number: 6 Comment Originated: 11/07/2013
11107/2013: Please mask the marked text on sheet C1.01. See redlines.
Response: Revised
Comment Number: 7 Comment Originated: 11/07/2013
11/07/2013: Please add a space between words (marked) on sheet C1.01. See redlines.
Response: Revised
Topic: General
Comment Number: 9 Comment Originated: 11/07/2013
11/07/2013: Please change the title to "Miramont Health Office Building". See redlines.
Response: Titles changed
Topic: Landscape Plans
Comment Number: 8 Comment Originated: 11/07/2013
11/07/2013: No comments.
r'
Topic: Site Plan
Comment Number: 10 Comment Originated: 11/07/2013
11/07/2013: Please add a legal description for the property to sheet 1.
Response: Added
Comment Number: 11 Comment Originated: 11/07/2013
11/07/2013: There is text that needs to be rotated 180 degrees on sheet 2. See redlines.
Response: Rotated
Comment Number: 12 Comment Originated: 11/07/2013
11/07/2013: There is aline over text issue on sheet 2. See redlines.
Response: Addressed
Comment Number: 13 Comment Originated: 11/07/2013
11/07/2013: Please mask the marked text on sheet 2. See redlines.
Response: Masked
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970.221.6854, rbuffingtonAlfcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 11/07/2013
11/07/2013: The existing water service to the site is a 2" service.
Response: The plans have been revised to reflect and existing 2" service.
Comment Number: 2
Comment Originated: 11/07/2013
11/07/2013: Show the existing water service (including meter pit), sewer service and fire line to
the building.
Response: The existing water service, fire service and sanitary sewer service are shown within the plans.
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbeals fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 10/28/2013
10/28/2013: The Site plan will need to label the dimensions of the trash enclosure. Also it is
unclear at this time if the trash enclosure is located on the concrete pad and designed with
walk-in' access. Please make this clear on the site plan.
Response:
Comment Number: 2 Comment Originated: 10/28/2013
10/28/2013: The pedestrian connections should include ramps when transitioning to the
parking -lot or the crosswalks should be raised.
Response: Ramps added
Comment Number: 3 Comment Originated: 10/28/2013
10/28/2013: On the cover sheet remove the Planning Certification
Response: Removed
Comment Number: 4 Comment Originated: 10/28/2013
10/28/2013: Site, Landscape and Elevation drawings should include the mechanical/utility
equipment locations and notes on painting and screening.
Response: Locations and notes included. They will be painted to match field color of building.
Comment Number: 5 Comment Originated: 10/28/2013
10/28/2013: The Lighting plan in the statistics table it should call out the parking area by itself.
The parking area should have and average 1 fc.
Response: This has been updated.
'`ColUns
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
December 12, 2013
Brent Cooper
Ripley Design, Inc.
401 W. Mountain Ave #100
Fort Collins, CO 80526
Planning Response: Ripley Design
Civil Response: Northern Engineering
Architect Response: VFLA
Lighting Response: BF Hammond
RE: Miramont Health Office Building, MA130083, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Noah Beals, at 970-416-2313 or
nbeals@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221.6501, tsiegmundC�fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 11/08/2013
12/11/2013: Please label the new drive approach/handicap ramps along Redwing on the utility
plan (sheet C2). Also, please show proposed asphalt patching limits along the new drive
approach. See redlines.
Response: The drive approach has been redesigned to meet ADA standards.
11/08/2013: The main access drive approach off of Redwing does not meet ADA standards
and is in poor condition. Currently, the attached sidewalk leads pedestrians to a 64 curb drop
at the drive approach. A new drive approach will need to be constructed to meet current
standards. Refer to LCUASS drawing 706. See redlines.
Comment Number: 3 - or0V% Comment Originated: 11/08/2013
12/11/2013: Further evaluation of the handicap ramp configuration at Drake/Redwing is needed
prior to approval. The minimum handicap ramp opening width is 5ft. With the existing power
pole and utility boxes there may not be enough room to fit a standard handicap ramp. It may
be necessary to relocate the conflicting utility boxes back, replace the handicap ramp and
keep the sidewalk attached along Redwing St rather than routing the sidewalk around the utility
boxes. A site visit has been setup to look at the configuration and site constraints and further
discussion will follow. If the preferred layout is to route the sidewalk around the utility boxes an
additional access easement is needed where the sidewalk extends onto private property. I will
be in contact after the site meeting. Please contact me with questions.
Response: Per our discussion on -site, we have redesigned the walk avoid existing conflicts and adequately
route pedestrians to directional ramps while maintaining ADA regulations.
11/08/2013: The existing handicap ramp at the southwest comer of Drake/Redwing, adjacent to
the site, does not meet current ADA standards for handicap access. This project will need to
reconstruct the handicap ramp to meet current standards.
Comment Number: 4 Comment Originated: 11/08/2013
12/11/2013: Right-of-way dedication documents were not received as part of this submittal.
Please visit the web link below or contact me directly for additional information on the process
to dedicate right-of-way.
http://www.fcgov.com/engineering/devrev.php
Response: A legal description and exhibit has been submitted. Fees have also been submitted
11/08/2013: This project is responsible for dedicating any right-of-way and easements that are
necessary for this project. It is not clear at this point how much right-of-way exists along Drake
Rd. Per Larimer County records, approximately 92ft of right-of-way exists along Drake at this
location. The proposed utility plans with this project reference 100ft of right-of-way that exists.
Current standards for Drake Rd, a 4 lane arterial road, requires a minimum of 102ft total
right-of-way needed (constrained arterial road standard), with this property responsible for half,
or 5lft of right-of-way. Initially, it appears that dedication of additional right-of-way will be
needed at this location. Please contact me to discuss the right-of-way issue further.
Comment Number: 6 Comment Originated: 11/08/2013
12/11/2013: Utility easement vacation documents were not received as part of this submittal.
Please visit the web link below or contact me directly for additional information on the process
to vacate utility easements.
http://www.fcgov.com/engineering/devrev.php
Response: A legal description and exhibit has been submitted. Fees have also been submitted
11/08/2013: The building expansion is encroaching into existing utility easements on -site. The
utility easements will need to be vacated by replat of the property or by separate document.
Please contact me for additional ' formation on the process to vacate utility easements by
separate document.
Comment Number: 7 Comment Originated: 12/11/2013
12/11/2013: Please add the following sidewalk note to the site plan and utility plan (sheet C2)
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy.
Response: The note has been added to the plans.
Comment Number: 8 Comment Originated: 12/11/2013
12/11/2013: Please add the following street cut note to the utility plan (sheet C2)
Limits of street cut are approximate. Final limits are to be determined in the field by the City of
Fort Collins Engineering Inspector. All repairs to be in accordance with city street repair
Standard
Response: The note has been ad d to the plans.
Comment Number: 9 Comment Originated: 12/11/2013
12/11/2013: Please label all of the private construction details as on -site. See redlines
Response: This has been revised per your redlines.
Z
Comment Number: 10 Comment Originated: 12/11/2013
12/11/2013: Please add LCUASS detail 701- Vertical curb and gutter
Response: This detail has been added.
Department: Light And Power
Contact: Doug Martine, 970.224.6152, dmartine _fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 10/25/2013
10/25/2013: Records indicate that the existing electric service is 800 amps at 1201240 volt. No
increase in electric service can be provided at this voltage. If any changes are necessary,
please contact Light & Power engineering at (970)221-6700 to determine costs.
Response: Acknowledged.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970.218.2932, ischlam -fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 10/29/2013
12/10/2013: Erosion Control Report: Under Final Stabilization please call out for sod areas too,
since this site specifically will be sod. Erosion Control Plan: Has redlines that need to be
corrected. Specifically - IP needs to be more specific to which protection used, also straw
wattles should only be used on dirt surfaces not hard surfaces. Erosion Control Escrow - Will
need to be recalculated based on the changes to the erosion control from straw to rock in
many places. If you need clarification concerning this, or if there are any questions please