Loading...
HomeMy WebLinkAboutBUCKINGHAN PLACE SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2015-10-27City of F6rt Collins Engineering DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 15-28 Issuance Date: 1012212015 Project Name: Buckingham Place, Second Filing Project Location: 100 Block of 3rd Street, North of Lincoln Permittee: Charles Meserlian City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project Fees: Permit Application Fee (Check # 1138) $ 400.00 Construction Inspection Fee (Check #1145) $ 735.90 Excavation Permit (Check 1145) $ 133.00 Total $ 868.90 Note: the above amounts may not include any street cut fees which may be required to be paid by separate permit. Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 24,754.00 Form of security deposited with the City: Check #1146 PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: N/A Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature: Approval for issuance: Date: /0- '74-/< City Engineer Approv s Date: c (Permit Issuance Date) EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS City Staff Contact Persons: Development Engineer: Marc Ragasa 281 North College Avenue, Fort Collins, CO 80524 970 221-6603 Construction Inspector: Kim Keiswetter 281 North College Avenue, Fort Collins, CO 80524 970 568-6546 Current Planner: Jason Holland 281 North College Avenue, Fort Collins, CO 80524 970 224-6126 Water Utilities Engineer: Shane Boyle 700 Wood Street, Fort Collins, CO 80521 970 221-6339 Erosion Control Inspector: Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 970 218-2932 Natural Resources: Kelly Kimple 281 North College Avenue, Fort Collins, CO 80524 970 416-2401 Traffic Operations: Joe Olson 626 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Forestry: Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 970 221-6641 Light and Power: Janet McTague 700 Wood Street, Fort Collins, CO 80521 970 224-6154 Developer' Contact Persons: Project Manager: Charles Meserlian 1222 Trappers Point, Fort Collins, CO 80524 Office: 970-490-1251 Cell: 970-227-4277 Fax:970-484-6695 Email: fctrucks@yahoo.com Developer: Charles Meserlian 1222 Trappers Point, Fort Collins, CO 80524 Office: 970-490-1251 Cell: 970-227-4277 Fax:970-484-6695 Email: fctrucks(o),yahoo.com Owner(s): Charles Meserlian 1222 Trappers Point, Fort Collins, CO 80524 Office: 970-490-1251 Cell: 970-227-4277 Fax: 970-484-6695 Email: fctrucksQwahoo.com Architect/Planner: Troy Jones MTA Architecture and Planning 108 Rutgers Avenue, Fort Collins, CO 80525 Cell: 970-416-7431 Email: tro cr,acrchitex.com Project Engineer: Bob Gowing Apex Engineering 908 Laporte Avenue, Fort Collins CO 80525 Cell: 970-219-2834 Email: bob c ,apex-engineer.com Professional License Number: 34290 General Contractor: Rex Harris Harris Excavating 1003 Indian Trial Drive, Windsor, CO 80550 Office: 970-566-0898 Email: harris. excavating mhotmail.com 000000 000000 000000000 00 �ooa00000goo 000000 10000 0000ao 0000 p o 000000 H H H H H H M o 0 0 0 o W 0 0 0 0 0 O H H H w N O 49 H f- H P 000000 H H H H H H o M o o M O 00 60 o N N p w N N H H H H H H H m, e U _ C as cc w m p Od)W Z 00 0000 1- 11 In H O O 00 0 0 00000000 11 r n f✓ Io 0 OO to to to 0 O ; l J Z Z O OO [OM MV) H H H H O O_ OOO 0 0(a1h OO Ww N H H Vol H O y y M M y O OO H d! H H H H OO 13 to 0:)ww0 HH Z UW>wuj CL O h zWam >v - LL O 0 to 000000 0 00000 0 0 0 0 0 o 0 0 0 0 0 0 000000000000 0000000 0000000 00 00 �' a w j F 0 0 0 0 o 0 HHHHHH v0000c000000 0H6%100 HOa HHOH00 0000000 HH 00be00 00 00H � p u Fw- 3 WO 7 !- H M N H N N w C LL J U) d Z {a-U. W O OWZVLLr w W x 0 0 0 0 0 0 000000 0 0 0 0 0 0 0 0 0 o 0 0.0000000000 0 0 0 0 0 0 0 0000000 0 0IL 00 = Z �Z F- O} �" ui00o00 I n H H H 0 0 H M N N co 0pp 00 G CG 00O N H H I o 0 0 1 o H l o l o O HH 17 N 1-y O t00/'doo tC cC H N H N I f 1 H H H HH 00 H m r,�0 W J w >�lzj W »H 49�ie H p 3 w�aN w> � w Q O K... z p N aZH a LU Zuuo$av m13 Q^. O-O P.0 O.0'O 0 0 !it O N O O N O N 0 0 0 0 0 0 O: O O 4' mil W N p Z W Z W F Z q) W y t p m 3 ~ lu>. C W W t y z y�d.a U Z wC/� _ '.. ! a. w0 W •.'. 3m 0 0ix � SS 52===2=2 Z LLI J U U � .J .J J J �� ������ J J -i J (6 Uj _1 (qW U) UO W +-o) a m zN O -0 W m 0 J m N fA J 4F•wU U. 4 m 3 $ ZF?UZ fn z N G w U W��2 LU U C' :m7 o c o w Z 2 t- a� Q� m C E J U LL > LL Z z FaCL mcc ;c �: cc c J�v a 5y32 ymA y pc� bZ�� ��o00 NEE-5 �c� E WOpa Y U Cm7�a� El7mo m t JY '1'4- m °1 c = c > m Is, m et iEoE y m a m w m* m r m �=VO � F Z y O Lo «o O m- � m W L_° m � m� A � Lo M= 0 0 2 k CL B Met a m c�a v��t-c�3d2 3rn33�3u »�i, 3 rnCDat�oa�o wQaaa 3: n et a 2- C!l R X !gPI C ,151 Minj A Rl X1 Alml;;l tql NJ Rl;;l sil Rl XI lQj R R R R S C C S S S S S 31 z;l Cl P ------------- it umm PUBLIC ALLEYKASD�T 1112 7 All 40 ff f Ir— — — — — — — — A z ZI ff � r.) I � � I 0 isle. mf — — — — — — — — — urm'r Ds77RNf 1-1 L- — — — — — — — — co L— — — — — — — — — — — — — — — — — — — — — All's fill BUCKINGHAM PLACE SECOND FILING EX -P — ENGINEERING 197012142834 OVERALL UTILITY PLAN 21 FORT COLLIK COLOKADO ,�tr'� of Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 - fax fcgov. corn/engineering MEMORANDUM TO: City of Fort Collins, Community Development & Neighborhood Services and Finance Department FROM: Marc Ragasa / Lisa Albers DATE: October 23, 2015 RE: Initiate Escrow Account/ 292.211610 This memo is to acknowledge the receipt of escrow funds in the amount of $24, 54.00 for the following: 3rd Street. North of Lincoln Avenue, Buckinaham Place, Second Filins for the completion of When improvements to the Right -of -Way are completed, please call our inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the improvements have passed inspection, the funds in escrow will be released to you. Escrow funds have been received from: cc: Initiate Escrow file Initiated by: Marc Ragasa Permit # 15-28