HomeMy WebLinkAboutKECHTER FARM PLD - Filed GC-GENERAL CORRESPONDENCE - 2015-09-09Sheri Langenberger
From: Sheri Langenberger
Sent: Monday, February 24, 2014 3:45 PM
To: Charlie R. Hager (chager@jvajva.com); tomd@frii.com; 'Mark Teplitsky'
(mteplitsky@tollbrothersinc.com)
Cc: Robert Mosbey
Subject: Kechter Farm follow up
As a follow up to Thursdays meeting.
The irrigation pipe.
The City will grant a variance to the requirement for the irrigations lines to be sleeved across the right-of-way with the
following conditions. Where the pipe is or will be within the right-of-way the pipe shall meet our standards for concrete
pipe (ASTM C 361), the joints shall include rubber gasket joints, External Sealing bands (restraining collars), and shall be
concrete encased, and we shall be notified when the portions are being installed across the right-of-way so we can
inspect the irrigation pipe installation in these 4 locations.
The Drainage easement needed for the outfall and spreader.
I did speak with Paul this afternoon and since the plat just identifies that there is to be a reservation for a drainage
easement and it is not dedicated that a drainage easement still needs to be dedicated.
Sheri
Sheri Langenberger
Development Review Manager - Engineering
City of Fort Collins
(970) 222.-6573
ENGINEERING DEPARTMENT
Post Office Box 1190
Fort Collins, Colorado 80522-1190
(970) 498-5700
FAX (970) 498-7986
MEMORANDUM
TO: Clint Jones, Development Services Engineer
FROM: Martina Wilkinson, Traffic Engineer
DATE: January 8, 2014
SUBJECT: Final Kechter Farm TIS review
Traffic staff has reviewed the final TIS for filing 1 of the Kechter Farm development. We've reviewed
the City's comments for the final submittal.. The city's comments stand on their own merits and should
be responded and/or noted as all other development comments.
In addition to that, County and City traffic staff have met to discuss traffic comments in detail in an effort
to consolidate and focus comments to specific required action items needed in a TIS addendum. The TIS
itself does not need to be completely re -done, but rather the items noted below can be addressed in an
addendum to the final TIS dated November 2013.
Roundabout design. The internal development roundabout at Trilby and Zephyr needs to be analyzed
and designed with appropriate traffic and roadway design standards. The LCUASS has detailed
information in it regarding roundabout design, and appropriate local review process including specific
roundabout meetings. Traffic analysis for the design (using RODEL or ARCADY) will need to be
submitted together with geometric details. Both horizontal and vertical design needs to be
roundabout specific. City and County staff is willing to meet with developer's engineers to discuss
the design in detail.
2. The TIS discusses the poor operations at Timberline / Zephyr and simply notes that this is normal at
unsignalized intersections with arterials. However, the delays shown in the TIS are well beyond a
LOS F and are in the hundreds of seconds — a total delay time that motorists are not likely to endure.
Since there is a wide TWLTL in that area, please provide a revised analysis that reflects a two -stage
left turn. This will provide a clearer picture of actual traffic operations at this location.
3. Please discuss the development's impacts to the Westchase and Fossil Creek roadways. This
includes the intersections at both Trilby and Timberline. This is a recurring comment from various
submittals regarding this development and needs to be included in the addendum.
4. Please provide specific information and traffic analysis on the intersection of Rock Park and Ziegler.
Although site traffic numbers are shown in an exhibit, no totals or analysis is included that would
address the function of the intersection. With substantial neighbor concerns about this intersection,
an analysis is helpful.
We hope this consolidation of items needed in a TIS addendum is helpful in clearly identifying next steps
for the developer's traffic engineer.
STEPHANIE G. FELLER
3162 Sagewater Court, Ft. Collins, CO 80528 baby.scar a(Uive.com 970-226-4572
December 18 2013
Mr. Robert Helmick
200 West Oak Street, Suite 3100
P.O.Box 1190
Fort Collins, Colorado 80521
RE: Kechter Farm Subdivision
Dear Mr. Helmick:
Approximately 4 weeks ago, I became aware of an Alta Land Title Survey
for the Kechter property. The survey illustrates the 30' of ROW on the east
side of Ziegler Road or the section line. Until this time, the 2 existing ROWs
shown on future improvements to Ziegler Road were mistakes that kept
appearing on plans. In fact, the first time I observed the 2 existing ROWs
marked on an aerial; Tom Daugherty told me to ignore the upper line, it was
wrong. Note 6, on the Alta survey, states the ROW on the east side of the
section line is included in platted lots. The original 1882 ROW dedication
was not vacated prior to the platting of Fossil Lake 1" filing per Charlie
Johnson, Larimer County Engineering and Larimer County Planning Dept.
According to our plat, the ROW on the east side of the section line shrinks to
28.50' just north of Rookery Road. ROW shrinks again to 23' south of
Rookery Road to Rock Park Drive. Lots 11 and 12 Block 11 were permitted
and built in Larimer Co. with 23' of ROW and a 10' HOA strip of land
between the ROW and the lot property line. The side setback for these lots
is 5' with the 10' of HOA property. Without the 101, Ft. Collins requires a
15' side setback and considers the lots corner lots. If the houses no longer
meet code, they would be classified nonconforming. I have learned permits
for improvements are next to impossible to obtain for nonconforming use
properties. For instance, if the property floods or there is a fire, permits
may not be issued for repairs.
Yesterday I spoke with Traci Stombo in Larimer Co. Engineering regarding
how less than 30' of ROW was approved on our plat. In 1999, 60' of ROW
was the minimum ROW dedication in Larimer Co., which is 30' on each side
of the section line. Traci suggested it was possible 23' was used because of
the road classification. In other words, the road was not expected to carry a
large volume of traffic.
According to Sheri Langenberger, City Engineer, Ziegler Road south of
1
Page 2
Robert Helmick
Trilby, does not have any particular classification. Sheri calls it half of a
road. With the proposed improvements, it will be classified as a connector
local. This reclassification is not identified on the October 10, 2013 city of
Ft. Collins Master Street Plan.
Rob Helmick stated, during a meeting on December 3, the original ROW
dedication of 1882 for Ziegler Road is valid until vacated. The fact the
ROW was never vacated and ROW was dedicated within the original
dedication was an oversight by Larimer County. Personally, I would call it a
mistake of huge proportions. Public property was sold for private use by a
developer. According to the Larimer County. Assessor's office, real estate
taxes are currently paid by the homeowners for the ROW in Lots 1-11 Block
10 and Lot 1 Block 11. Larimer County created this debacle and Larimer
County should step up to the plate and work with the city to resolve the
ROW oversight. Larimer County should be monetarily responsible for all
costs not the homeowners.
In August, a number of Fossil Lake homeowners met with Rob Helmick
regarding issues with the Kechter Farm subdivision. Rob instructed us to
put our concerns in writing. Thirty-seven homeowners signed letters
expressing objections and concerns regarding Zephyr Road's connection to
Rock Park Drive. These letters were faxed to Rob Helmick, Lindsay EX and
Larimer County Commissioners. During the December 3 meeting, Rob
Helmick stated the GDP was approved and nothing could be changed. So
why did he tell us to state our concerns in writing? In fact, Rob stated he is
going to recommend approval of the Kechter Farm subdivision.
It is my understanding Ft. Collins likes connectibility of the street system.
For some reason, the Kechter Farm traffic studies ignore vehicles traveling
from Zephyr Road across Ziegler Road to Rock Park Drive. No through
traffic is considered. Per Fossil Lake plat, Rock Park Drive and Rookery
Road are each designed for under 300 vehicles per day. They both have 46'
of ROW and are classified as Residential Rural streets. One of the most
important specifications for a street with this classification is a minimum of
1-acre lots. Rock Park Drive has no lots fronting the street that are even
close to an acre. Rookery Road has a total of 40 lots on the 46' ROW street,
of which only 8 are an acre or larger. The traffic count dated May 2012
from the city of Ft. Collins counted 547 vehicles per day traveling to and
from Rock Park Drive. It seems the Rock Park Drive and Ziegler Road
intersection has close to twice the amount of traffic per its design. Is this
another oversight by Larimer County? The Ft. Collins Master Street Plan
does not identify Zephyr Road intersecting with Ziegler Road. It is my
Page 3
Robert Helmick
opinion, along with 36 other homeowners in Fossil Lake, adding addition
traffic to a narrow street with limited sidewalks is acting without
forethought. Motorists traveling east will cut through Fossil Lake instead of
travelling north on Ziegler Road and east on Kechter Road. It is a shorter
distance and saves time. With the number of children living in the
neighborhood and all of the bus stops, additional traffic will only create
unsafe conditions for them. We feel the Zephyr Road connection to Rock
Park Drive will create unnecessary traffic within Fossil Lake and when that
occurs who will care? Zephyr Road will exist and Kechter Farm subdivision
will be annexed. Is Larimer County once again handing a bad situation to
the city?
In summary, we ask Larimer County to withhold additional approvals until
the ROW and Zephyr Road issues are resolved. The Fossil Lake plat was
approved by Larimer County with serious errors. We strongly believe
Larimer County should work with the city of Ft. Collins to vacate the 1882
dedicated ROW. Larimer County should fund the vacation process. The
homeowners should not be required to pay for any of the costs, including the
the vacated real estate. If the city will not vacate the ROW north of Rock
Park Drive, the shortage of 7 plus feet can be added to the west side of the
east curb on Ziegler Road. Should the Fossil Lake plat require replatting,
Larimer County will also fund the expense.
Homeowners of Lots 1 and 12 Block 11 request a 5' solid board fence
installed to replace current fencing. The fence will provider a buffer for the
increased traffic created by the the addition of Zephyr Road to Ziegler
Road, road widening and reclassification of the street. Of course, if Zephyr
Road does not intersect on Ziegler Road south of Rookery Road, the fence is
a mute subject.
Sincerely,
Stephanie Feller
1? 413 co.larimer.co.us Mail - WEB: Re: Kechter Farm Planned Land Division PLD Preliminary Plat
la6•I�.til•:
U11 `Jll'
A&%
WEB: Re: Kechter Farm Planned Land Division PLD Preliminary Plat
carl@twiconsol.com <cad@twiconsol.com> Wed, Dec 18, 2013 at 12:23 PM
To: rhelmick@ladmer.org
This message was sent by a visitor to the Virtual Courthouse.
Name: Carl Marino
Email: cart@twiconsol.com
Phone: 970-682-2745
To: Rob Helmick
Dated: Wednesday December 18, 2013
Re: Public Hearing Comments
My name is Cad Marino and I am a resident of Fort Collins, CO. We currently are going to be building a new
home on one of the last lots left in Fossil Lake Ranch. Our lot is at the end of Rock Park Drive, east of Ziegler
Road. I have been reviewing the information sent to me by mail, as well as researching the project online at the
Larimer County website/planning/current applications. I have some concerns and have commented on those
below. I may or may not be able to attend the Public Hearing tonight, so I wanted to send you this email for your
use at the hearing. If you can, I would appreciate if someone could air my concerns as a neighbor to this project
by reading, posting or voicing at the public hearing tonight.
1. Given the proximity of this project to Kinard Middle School, I think there should be a strict dedicated
construction truck access road to develop this project. There are many children living in the Fossil Lake Ranch
neighborhood east of Ziegler that attend Kinard Middle School. The only access to the school daily is by walking
or bicycling to the school via Ziegler Road. I think if there were to be large trucks (cement, lumber, stone or other
large construction material vehicles) constantly entering and exiting the project at Ziegler Road, the children's
safety will be jeopardized every day.
A dedicated construction vehicle entrance away from Ziegler Road and Kinard would be safer for everybody
coming and going to Kinard Middle School. This will help to prevent,and minimize potential accidents to
pedestrians.
2. 1 am curious to know what will potentially be located on the planned commercial lot on the corner of Ziegler
Road and Trilby Road just south of Kinard Midddle School. This commercial development of the proposed 6,000-
12,000 square foot building seems like an awful place to have a commercial building located. Will this building be
for offices or is this building going to be occupied by retail stores? Why is planning even considering this
commercial development in the middle of the surrounding and very connected residential neighborhoods? I for one
object to this commercial development as part of this project.
3. We think that certain proposed lot sizes and the zero lot line housing of this project should be re -considered.
The area is known for residential neighborhoods with nice medium to large lots. This project is proposing many
typical lots beginning with 156 lots at 6,900 square feet. These are really small lots for this neighborhood. I think
that the number of proposed houses to be constructed should be reduced overall and the lot sizes increased.
4. 1 think that this project lacks necessary green space, parks and buffered areas.The proposed housing area
north of Zephyr Road is too dense with houses and lacks any recreational green space or parks. These are family
neighborhoods and all future housing projects should include generous areas surrounding all of the homes and
https:llmil.google.corrVniaiI/u/0/?ui=2& k--5ad25453e9&view=pt&search=inbo)dth=143072a38cabe6ce 1/2
12/18/13 co.larimer.coms Mail -WEB: Re: Kechter Farm Planned Land Division PLD Preliminary Plat
integrated for children and adults to access to recreate, walk dogs, bicycle, etc. I think this project lacks a proper
ratio of green space to housing lots.
I hope that my comments can be voiced at tonights hearing. If you would like to contact me today or anytime in
the future, please do not hesitate to do so. Please confirm back to me that you have received this email today.
Thank you very much for your cooperation.
My contact information is as follows:
Cad Marino home phone-970-682-2745 cell phone 720-839-7172
email-cart@twiconsol.com
With My Very Best Regards, Carl Marino
Page sent from: http://www.laHmer.org/planning/planning/current_applications.cfm
Date/Time: 12/18/2013 - 12:23 PM
User located at: 50.134.149.110
ittps://mail.g oog le.con-Vmail/u/O/?ui=2&i k-5ad25453e9&Nievv= pt&search= inbox&th=143072a38cabe6ce 2/2
12t413
co.larimer.co.us Mail - Kechter Farm Buffer
r�;.titi11F`IED Tt� EkCCI.!@N,E
Kechter Farm Buffer
Becky Ford < renoford @com cast. net>
To: "rhelmick@larmer.org" <rhelmick@larimer.org>
Wed, Dec 18, 2013 at 12:26 PM
Hi Rob,
My name is Becky Ford, and I live in the Westchase subdivision, which borders the new Kechter Farm
development. I am writing to request that more trees be added to the border between the Westchase and
Kechter developments, to be a continuation of the natural area north of Westchase. The Westchase subdivision
has a small natural area to the North and a walking trail running along northern and eastern borders of the
subdivision. This trail has beautiful views and wildlife and is enjoyed by all Westchase residents. It was a
significant factor in our own purchase of a home here. Building a subdivision where there is now farmland will
impact not just our views in Westchase subdivision (Fossil Lake and farmland), but also our natural area.
A slightly larger buffer and additional trees between the two subdivisions would add beauty and increase
property values in BOTH subdivisions. It is a win -win proposal. What I see on the plat shows very few trees
between the subdivisions. Adding more trees on the Kechter Farm side would provide a visual and natural buffer
Although the developer may have to plant more trees and/or carve out a bit more space at the back of the
Kechter Farm subdivision, the increased property values would recoup the expense. Water would also be
conserved, as natural areas do not require watering. The Kechter HOA would save money because they would
not have to mow.
Please keep in mind that not everyone who has an interest in this issue has time to write a letter about this.
I made the time to write this letter, but there are many, many more who use the trail or have homes that back to
the trail. The residents of Kechter Farm Would also benefit.
Fort Collins is a beautiful city, and I appreciate the work you put into keeping it that way!
Thanks,
Becky Ford
2133 Andrews St.
Fort Collins, CO 80528
renoford@me.com
Sent from my iPad
https://rriail.goog le.comVmail/u/0l?ui=2&ilr5ad25453e9&viev.= pt&search= inbo)dth=143072c47499da73 1/1
aAly\ j-.,j
(�j (2)-1
JVA, Incorporated
"'NNS�NO, Wl
25 Old Town Square
`IN!// WA ""I
`� `� `
Suite 200
Fort Collins, CO 80524
Ph: 970.225.9099
Fax: 970.225.6923
September 16, 2013
Toll Free: 877.444.1951
Web site:
www.jvajva.com
Mr. Terry Farrill
E-mail:
District Engineer
lnfo@jvajva.com
Fort Collins -Loveland Water District/
South Fort Collins Sanitation District
5150 Snead Drive
Fort Collins, Colorado 80525
RE: Utility Service Summary Letter
Kechter Farm
Fort Collins, Colorado 80528
JVA No. 1844c
Dear Terry:
As requested by the Fort Collins -Loveland Water District / South Fort Collins Sanitation
District, JVA has prepared a description of the existing and proposed utility connections for the
above referenced project.
PROJECT DESCRIPTION
Toll Brothers, Inc. is proposing the development of the Kechter Farm property with 414 homes,
1 commercial lot, 1 recreation center, open space and trail systems. The subject property is
approximately 166.79 acres of farmland located on a portion of the SE Quarter of Section 8,
Township 6 North, Range 68 West of the 6`s P.M., Larimer County, Colorado. More
specifically, the property is bounded on the north by Kinard Jr. High School, to the east by
Ziegler Road, to the west by existing residential development, and to the south by Fossil Creek
Reservoir. A vicinity map is included at the end of this letter.
The buildings will consist of single family homes and duplexes. A copy of the proposed utility
plan is included at the end of this letter.
SANITARY SEWER SERVICE
As shown on the Overall Utility Plan, there is an existing 30" public sanitary service interceptor
located across the southern portion of the Kechter Farm property which exits the property along
the southwestern boundary line. This existing sanitary sewer main is controlled by South Fort
Collins Sanitation District. The collection system will consist of a network of 8" to 12" sewer
mains, which will connect to the existing 30" interceptor. Branch lines located under the
proposed streets will collect sewage from 4" PVC laterals that will serve the individual
buildings. Sewage from the proposed commercial lot and recreation center will discharge into
the branch mains by 6" PVC service laterals. All proposed sewage will be conveyed by gravity
flow to the existing 30" sewer interceptor.
BOULDER I FORT COLLINS I WINTER PARK
Kechter Farm
Utility Summary
9/16/13
2 of 2
Due to the high groundwater table, a proposed underdrain/dewatering system will run parallel
and below the sanitary sewer mains.
WATER SERVICE
As shown on the attached Utility Plan, there is an existing 24" water main within East Trilby
Road to the south of Kinard Jr. High School, and an existing 24" water main within East Trilby
Road located in the West Chase Development. These water lines are owned and operated by
Fort Collins -Loveland Water District (FCLWD). The Plan proposes to extend a 24" PVC main
through the site within the proposed section of East Trilby Road to serve the project.
There is also an existing 8" water main within Zephyr Road located in the West Chase
Development, and an existing 8" water main at the intersection of Ziegler Road and Rock Park
Road. These water mains are also FCLWD lines. The Plan proposes to tie into these existing 8"
mains with an 8" PVC main which will be located within the proposed section of Zephyr Road.
An 8" PVC connection will also be made to the proposed 8" water main located within the
proposed Mail Creek Development. All other proposed water mains for the subject
development will be 8" PVC lines.
CONCLUSIONS
Preliminary calculations, a vicinity map, and other reference materials used are attached at the end of
this letter.
Please contact us if you have any questions regarding this submission.
Sincerely,
JVA, Inc.
Jason T. Claeys, P.E.
Project Manager
wz�
Marc Rundle, E.I.T.
Design Engineer
Attachments:
- Vicinity Map
- Sanitary Sewer Flow Calculations
- Will -Serve Letter
- Utility Plan
Sheri La
From:
Ward Stanford
Sent:
Wednesday, February 19, 2014 3:22 PM
To:
'Marc A. Rundle'
Cc:
Charlie R. Hager, Sheri Langenberger
Subject:
RE: Kechter Farm PLD - Traffic Operation Comment 26 - City engineering staff contact
information
Marc,
Thanks for the additional input on the crossing dimensions.
Traffic Operation's see's it this way, and please understand we appreciate the development's will to remove that bulb -
out for better turning characteristics, on your own choice.
Traffic does not see the bulb -out or the current roadway conditions at that location an impact or fault of this
development. Therefore we do not believe we should require this development to reconstruct anything there. If the
development feels the bulb -out and resulting characteristics of that area creates a negative for its future residents
and/or development project, Traffic Operations does not have issues with the bulb -out being modified. If the
development chooses to modify the bulb -out, we would want the changes to not cause a ped crossing width greater
than 18' (12' travel lane and Vane). From our point of view, you can choose to leave it as is, or partially reconstruct the
bulb -out to provide better turning radius but keeping the crosswalk crossing a maximum of 18'.
The old Trilby to new Trilby transition length should be 100', so I need to ask you to revise the 60' transition to be 100'.
This comes from the MUTCD, (as referenced by the AASHTO green book) which provides the lane taper design length
equation of L = (ws"2)/60; (I'm using 5' for W; 35 mph for S). The equation is also the LCUASS equation for the Approach
Taper in Fig 8-3 and Fig 8-11.
Sheri, any comments/concerns?
Kind Regards,
Wed,1i awfmd
Traffic Systems Engineer
City of Fort Collins
Traffic Operations
970-221-6630
wstanford@fcgov.com
From: Marc A. Rundle [mailto:mrundle@jvajva.com]
Sent: Wednesday, February 19, 2014 11:30 AM
To: Ward Stanford
Cc: Charlie R. Hager; Sheri Langenberger
Subject: RE: Kechter Farm PLD - Traffic Operation Comment 26 - City engineering staff contact information
Good morning Ward,
Thank you for your detailed response to my question and the LCUASS code references. We've revised the proposed
connection to existing East Trilby Road with a smoother transition and restriped existing Trilby Road to the east end of
KECHTER
FARM
a � �
KECHTER RD
KECHTER RD
HEARTHSTONE DR
N
KINARD MS
ZEPHYR RD E TRILBY RD
I
S
25
NORTHWEST
1
POND /i
< Q FOSSIL CREEK
RESERVOIR
VICINITY MAP
wS
Kechter Farms
Sanitary Sewer Flow Calculations
Design Engineer: M. Rundle
Design Firm: JVA, Inc.
Project Number: 1844c
Date: September 4, 2013
DESIGN CRITERIA:
Design Critertia for Gravity Sanitary Sewers Lines
Residential Peak Flow Factor Equation (PF ):
Assume: 2.5 People/Dwelling
Daily Use: 125 Gallons per Capita per Day PF = (t 8 + V) Where: P is the population in thousands
Infiltration Factor: 0.3 (4 + -,fP)
ALCULATIONS
Single Multi Infiltration Infiltration Peaking Peak Peak Accumulated Accumulated
Manhole Family Family Commercial People (gpd) (gpm) Factor Flow Flow Peak Flows Peak Flows
/nnril /nnml (nnml lrfel
Upstream of SSMH-27
163
408
15300
10.63
4.02
220221
152.93
152.93
0.341
Upstream of SSMH-26
29
73
2738
1.90
4.28
41779
29.01
181.94
0.405
Upstream of SSMH-04
West Branch
114
285
10688
7.42
4.09
156318 108.55
290.50
0.647
Upstream of SSMH-04
East Branch
106
265
9938
6.90
4.10
145781
101.24
101.24
0.226
Upstream of SSMH-01
0
0
0
0.00
4.50
0
0.00
391.74
0.873
Total 412 1031 38663 26.85 20.99 564099 391.74
Flow Calculations Sanitary Calcs 1 of 1
Kechter Farms
Sanitary Sewer Pipe Size, Capacity & Depth Calculations
Design Engineer:
M. Rundle
Design Firm:
r JVA, Inc.
Project Number:
1844c
Date:
September 4, 2013
DESIGN CRITERIA:
Design Critertia for Gravity Sanitary Sewers Lines
Q _ 1.49 ARY3Sy' - Mannings Equation
n Mannings Coefficient = 0.013
ALCULATIONS
Accumulated Accumulated Pipe Proposed Full Full Depth (in)
Manhole Peak Flows Peak Flows Size Sloe Capacity Velocity Q/Q d/D Velocity (ft/s)
p p y •� full using Flow
(gpm) (cfs) (in) (ft/ft) (cfs) (ft/s) Master using Flow Master
Upstream of SSMH-27
152.93
0.341
8
0.004
0.766
2.195
0.445
3.72
0.465
2.13
Upstream of SSMH-26
181.94
0.405
10
0.004
1.389
2.547
0.292
3.72
0.372
2.20
Upstream of SSMH-04
West Branch
Y90.50
0.647
10
0.004
1.389
2.547
0.466
4.80
0.480
2.50
Upstream of SSMH-04
East Branch
101.24
0.226
8
0.005
0.857
2.454
0.263
2.76
0.345
2.07
Upstream of SSMH-01
391.74
0.873
12
0.004
2.259
2.877
0.386
5.16
0.430
2.69
Pipe Size, Capacity & Depth Sanitary Calcs 1 of 1
FORT COLLINS-LOVELAND WATER DISTRICT
v
V
April 12, 2012
Mr. Tom Dougherty
220 East Mulberry
Fort Collins, CO 80524
RE: Kechter Farm GDP
Dear Mr. Dougherty,
r SOUTH FORT COLLINS SANITATION DISTRICT
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District is willing and
able to provide service provided all District requirements are satisfied.
The project can be served by an existing 24 inch waterline. The District's existing facilities are capable
of providing domestic water service in accordance with Section 8.1.2 of the Larimer County Land Use
Code.
An existing 30 inch sanitary sewer interceptor can serve the project. The District's existing facilities are
capable of providing sanitary sewer service in accordance with Section 8.1.1 of the Larimer County Land
Use Code.
Please do not hesitate to contact me at 226-3104, extension 104, if you have any questions or require
additional information.
Respectfully,
Mr. Terry W. Farrill, P.E.
District Engineer
xc: Mr. Michael D. DiTullio, District Manager
5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186
Sheri Langenberger
From:
Jason T. Claeys <jclaeys@jvajva.com>
Sent:
Tuesday, April 30, 2013 9:50 AM
To:
Sheri Langenberger
Cc:
Craig Foreman; cdjones@larmer.org
Subject:
RE: Kechter - Zeigler Alignment
Sheri,
Based on Craig's response, are you comfortable with the proposed Zeigler layout and modification to the right-of-way. I
would like to send our line work to the surveyor for the MLD.
Thanks,
JASON T. CLAEYS, P.E., LEED AP
Project Manager
JVA, Incorporated
25 Old Town Square, Suite 200
Fort Collins, CO 80524
www.ivaiva.com
Direct: 970.530.0818
Mobile: 970.817.1712
Phone: 970.225.9099
Fax: 970.225.6923
Boulder - Fort Collins - Winter Park
From: Craig Foreman [mailto:CFOREMAN@fcgov.com]
Sent: Tuesday, April 30, 2013 9:31 AM
To: Jason T. Claeys; cdjones@larimer.org
Cc: Sheri Langenberger
Subject: RE: Kechter - Zeigler Alignment
2
Correct on the trail alignment. This way the trail will come from Bacon School eastward along the north side of Zephyr
and provide better conductivity between the two schools with minimal street crossing.
At the intersection of Trilby and Ziegler we'll us the light to get trail users on to the east.
Thanks. Craig
From: Jason T. Claeys mailto jclagys(&jvajva.com]
Sent: Monday, April 29, 2013 3:45 PM
To: cdjones larimer.org
Cc: Craig Foreman; Sheri Langenberger
Subject: RE: Kechter - Zeigler Alignment
Clint,
1 spoke with Mike and Tom. They had coordinated the trail location with Craig Foreman and it appears that the request
was to place the trail alignment along the north side of Zephyr, to the north side of Trilby, then crossing Zeigler at the
intersection of Trilby and Zeigler. It sounds that this alignment was preferred rather than extending the trail along the
south side of Trilby.
Craig, can you confirm that this trail alignment is correct?
Thanks,
JASON T. CLAEYS, P.E., LEED AP
Project Manager
JVA, Incorporated
25 Old Town Square, Suite 200
Fort Collins, CO 80524
www.*vaiva.com
Direct: 970.530.0818
Mobile: 970.817.1712
Phone: 970,225.9099
Fax: 970.225.6923
_Boulder - Fort Collins - Winter Park
From: „Clinton Jones [mailto:cdiones*Iarimer.org]
Sent: Monday, April 29, 2013 7:55 AM
To: Jason T. Claeys
Subject: Fwd: Kechter - Zeigler Alignment
Jason,
Here are Sheri's comments.
Clint
---------- Forwarded message ----------
From: Sheri Langenberger <SLanszenber er ,fc og v.com>
Date: Thu, Apr 25, 2013 at 3:15 PM
Subject: RE: Kechter - Zeigler Alignment
To: %dionesalarimer.ora" <cdiones(a�larimer.or >
Clint
I reviewed the drawing with Joe Olson and overall the transitions and x-section south of Rookery looked okay and
matched what we had discussed before. The cross section for North of Rookery Road the street section matched what
we had discussed before but I thought the sidewalk on the west side was also going to serve as the Regional Trail
connection.
Per the last drawing I had of Kechter Farms the Regional Trail was going to run along the West side of Kechter Road to
Rookery Road and then cross. If that is still the correct planned alignment than additional row along the West side from
Trilby to the crossing at Rookery Road is needed and that cross section should be adjusted to show this wider sidewalk
that will serve as the trail. The plan for the trail may certainly have changed since the last time I saw an overall plan — I
just want to make sure it is accounted for where ever it is to go.
Joe wanted it noted that what has been submitted are not stripping plans.
Hope this is helpful and thanks for forwarding this on for our review. If you can let me know where it has been agreed
that the regional trail will go 1 would appreciate it.
Thanks
Sheri
Sheri Langenberger
Development Review Manager - Engineering
City of Fort Collins
(970) 221-6573
From: Clinton Jones [mailto:cdionesOlarimer.or4]
Sent: Tuesday, April 23, 2013 2:05 PM
To: Sheri Langenberger
Subject: Fwd: Kechter - Zeigler Alignment
Sheri,
Martina and I took a look at this exhibit and didn't see any issues. I just wanted to see if you have any
comments before I give Jason the go ahead.
Thank
Clint
---------- Forwarded message ----------
From: Jason T. Claeys <'cl laeys(a-)jvajva.com>
Date: Mon, Apr 22, 2013 at 6:15 PM
Subject: Kechter - Zeigler Alignment
To: Clinton Jones <cdiones@larimer.org>
Clint,
I know that we coordinated review of this layout a few months ago. The Kechter's are in process of completing
the MLD for the Kechter outparcel and would like to include any right-of-way dedications for Zeigler
included. Attached is the same exhibit that we had been passing around for review. 'I adjusted one note in the
street cross sections to delineate "existing".
The one question I have is in regards to the lane redirect as Zeigler goes south, just past the intersection of
Rookery Road. The road is making a 5' transition to the west to accommodate a 6' bike lane on the east side of
Zeigler. Referencing LCUASS, redirect tapers are to reference Figures 8-2 and 8-3, which are the design
requirements for left turn lanes. Figure 8-3 directs the design of a "Redirect Taper" with the taper length equal
to ws^2/60. For a redirect width of 5', the minimum taper length is 75'.
Since the Kechter's are wanting to have this platted with the MLD, I would like to be sure that I am going in the
correct direction and not having us replat Zeigler in the future because my assumptions were incorrect.
Thanks for your help and please feel free to give me a call if you would like to discuss further.
Thanks!
JASON T. CLAEYS, P.E., LEED AP
Project Manager
JVA, Incorporated
25 Old Town Square, Suite 200
Fort Collins, CO 80524
www.ivaiva.com
Direct: 970.530.0818
Mobile: 970.817.1712
Phone: 970.225.9099
Fax: 970.225.6923
Boulder • Fort Collins - Winter Park
Clint Jones
Larimer County Engineering Department
200 W. Oak St., Suite 3000
4
PO Box 1190
Fort Collins, CO 80521-1190
Phone: (970) 498-5727
Clint Jones
Larimer County Engineering Department
200 W. Oak St., Suite 3000
PO Box 1190
Fort Collins, CO 80521-1190
Phone: (970) 498-5727
Click here to report this email as spam.
6
SOVE M W
ul ��
`j tax' AMM v m o swim
a66 r aw-w-my
FOSSIL LAKE RANCH
SUBDIVISION
---------
- --
KECHTER FARM
SUBDIVISION
565'
IXWW
579'
pmposw Par
26s' 2 .5,
WHF bar Ex MF aai
6,0,
U0.
♦s' GD' 6D' 12D' 12D' IX
UTL rlEW � 3—,
W� TaAVEL 1A1� EX TW& L 860:
LAaE
TYPICAL WEST HALF SECTION OF ZIEGLER•
ALONG KECHTER OUTPARCEL
(NORTH OF ROOKERY)
ON FOSSL cams PW RW RM PLAT
the median, as shown on the attached "Trilby Road Transition.pdf". Based on these improvements, do you any further
concerns with the proposed connection to existing East Trilby Road?
Also, Comment #39 requests the removal of the bulb -out at the NW corner of Trilby Road and Ziegler Road (shown
below):
Comment Number: 39
02/07/2014: Do not remove the bulb -out at the NW corner of Ziegler and Trilby. This will keep the west side
N/S ped crossing a little shorter. Scaling from aerial maps and the submitted plans that the current narrowest
width is about 17'-18' between the bulb -out and the median. That basically meets standards for a travel lane
and bike lane. Please contact us if the dimensions are inaccurate.
As labeled on the "Existing Trilby Road Bulb-out.pdf", the narrowest width is 15'-9" based on the survey information we
have. Does the City still wish to remove the bulb -out given this smaller dimension? If so, would a 11' wide travel lane
and an approximately 5' wide bike lane be acceptable?
Please advise. Thank you for your help.
MARC A. RUNDLE
Design Engineer
JVA, Incorporated
1319 Spruce Street
Boulder, CO 80302
www.vava.com
Direct: 303.565.4972
Phone: 303.444.1951
Fax: 303.444,1957
Boulder • Fort Collins • Winter Park
From: Ward Stanford [mailto:WSTANFORD(&fcgov com]
Sent: Friday, February 14, 2014 12:09 PM
To: Marc A. Rundle
Cc: Charlie R. Hager; Sheri Langenberger
Subject: RE: Kechter Farm PLD - Traffic Operation Comment 26 - City engineering staff contact information
Marc,
The bike lanes and travel lanes need to connect smoothly in the transition, as well as water flowing between the street
sections. Typically a traditional lane/street taper is utilized to accomplish street width transitions. The type shown on
the drawings typically does not accomplish those goals as well as a traditional lane taper plus leaves an area that doesn't
typically self -clean. Smooth tapers provide better commuter guidance and do not pose as much safety risk (abrupt curb
change).
Chapter 7 of LCUASS has information about transitions for roadway shifts or lane drops and joining existing
improvements (7.4.6 and 9), but they aren't specific to width changes. They refer to figures for lane transitions though.
Please confer with Sheri Langenberger on what the engineering design side expects as she knows the City engineering
standards better than I. From a traffic standpoint I prefer and believe this width transition is not different than a lane
drop such as was on Harmony between Timberline and the RR tracks, where Harmony went from a 6 lane section to the
4-lane section.
FOSSIL LAKE RANCH +�> n�*-•
SUBDIVISION
6370' VM DISTANCE
s
i' 9KE LANE
12' WNE LANE ZIEGLER ROAD
...____12' DIM LANE 6' Ilm LANE
-- wenTK ale a tvr1EN
UIIUtT -
.______-___— ------- — -- — f/SflIflR - - - - -
------ 'h- - _-
1%611Y wff-w-my
i
MY
SED I �/\ KECHTER
IAL SITE ` V OUTPARCEL
F -
f��A
f
' I
I
I
o
� ExewAwr+rir-161r
a
_O I
i
r -�.Ir OAAE LANE,,-- . _ ZIEGLER ROAD = - _ ••,•�.w.o-,.� — - - - --- - - -
S --6' BILE LANE._.--- -12' DI6VE LANE- �►-anmraixg _-- _.- ---
— ---------------- J_____ 9' U1M FASEtEA-
to__________________ 6 1
AGIR-OF-MIR'
mw-W-WAY °� i KECHTER FARM
SUBDIVISION r
oESIDNm NY, KRw
MINN BY: mw
CMECNED BY: JTC
JOB NUMBER: 161/0
DATE 04=3
\\ 7 oNA, INC
H
m
SS I
EX RDw \
553'
PROPPED NwUS X \ Z
Lu
NNF mw IX NMFMe—
sa '
�I ia'
EAR 43 PNN�7 ONETWWEI' LANE 1UDJOW) OML<L. Li
LANE � � CL
Q
Y R
TYPICAL WEST HALF SECTION OF ZIEGLER' w
ALONG KECHTER OUTPARCEL CD
(SOUTH OF ROOKERY) N
Dow wff-w-66B' o" 6 am
ON M531. CFW PA RW R m PIAT
BNEET NUMBER
1 O 1
Page 1 of 1
Sheri Langenberger
From: Lindsay Ex
Sent: Tuesday, July 03, 2012 5:01 PM
To: Laurie Kadrich
Cc: Mark Sears; John Stokes; Pete Wray; 'Mike Sollenberger; 'Tom Dougherty';'linda.ripley@ripleydesigninc.com';
'Rob Helmick'; 'Jeffrey Boring'; Sheri Langenberger
Subject: Kechter Farm Update
Laurie and all,
Mark Sears and I just finished meeting with Russ Legg and a phone conversation with Mike Sollenberger.
Based on these conversations, Mark and I have agreed that if the current configuration (as presented last
Friday) remains in place and that a deed restriction is committed to for the peninsula, then this project will
have City support at the July hearing of the Planning Commission.
All parties agreed we still need to work out the issues regarding ultimate ownership (with the preferred
ownership being Natural Areas) and the funding and timing of restoration. However, because a donation
of land needs to be heard by the Land Conservation Stewardship Board and ultimately approved by
Council, we cannot agree Natural Areas will ultimately accept the donation. At the same time, I think we
can all agree conceptually that the peninsula (and southern 110 acres) is best managed in the long run by
the public and that the City, County and the applicants will work toward this goal.
If I have missed anything, please feel free to jump in and clarify. Otherwise, have a wonderful 4th of July
and I'll talk to you all when I'm back in the office next week.
Cheers,
Lindsay
Lindsay Ex, LEED Green Assoc.
Environmental Planner
CDNS I City of Fort Collins
Iex0fcgov.com
970.224.6143
7/5/2012
FORT COLLINS • LOVELAND WATER DISTRICT
Y
V
April 12, 2012
Mr. Tom Dougherty
220 East Mulberry
Fort Collins, CO 80524
RE: Kechter Farm GDP
Dear Mr. Dougherty,
(0 SOUTH FORT COLLINS SANITATION DISTRICT
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District is willing and
able to provide service provided all District requirements are satisfied.
The project can be served by an existing 24 inch waterline. The District's existing facilities are capable
of providing domestic water service in accordance with Section 8.1.2 of the Larimer County Land Use
Code.
An existing 30 inch sanitary sewer interceptor can serve the project. The District's existing facilities are
capable of providing sanitary sewer service in accordance with Section 8.1.1 of the Larimer County Land
Use Code.
Please do not hesitate to contact me at 226-3104, extension 104, if you have any questions or require
additional information.
Respectfully,
Mr. Terry W. Farrill, P.E.
District Engineer
xc: Mr. Michael D. DiTullio, District Manager
5150 Snead Drive, Fort Collins, CO 80525
Phone (970) 226-3104 Fax (970) 226-0186
Traffic Systems Engineer
City of Fort Collins
Traffic Operations
970-221-6630
wstanfordt@fcgov.com
From: Marc A. Rundle [mailto:mrundle0jv4jya.com]
Sent: Friday, February 14, 2014 11:41 AM
To: Ward Stanford
Cc: Charlie R. Hager
Subject: Kechter Farm PLD - Traffic Operation Comment 26 - City engineering staff contact information
Good morning Ward,
We are currently working on addressing the Kechter Farm PLD Traffic Operation comments and would like to confirm
the Trilby Road transition requirements referenced in Traffic Operation Comment 26 with City engineering staff. Can
you please direct me to the person who would be able to confirm the lane taper/transition standards?
Thank you very much for your help in advance.
MARC A. RUNDLE
Design Engineer
JVA, Incorporated
1319 Spruce Street
Boulder, CO 80302
www.vava.com
Direct: 303.565.4972
Phone: 303.444.1951
Fax: 303.444.1957
Boulder - Fort Collins - Winter Park
Click here to report this email as spam.
Sheri Langenberger
From: Chris Stull <cstull@tollbrothersinc.com>
Sent: Thursday, January 30, 2014 6:11 PM
To: Jim Lynxwiler
Cc: 'linda.ripley@ripleydesigninc.com'; Sheri Langenberger
Subject: RE: Kechter Farm
Thanks Jim. When is a good time for you to meet? In the meantime, I will confirm the overall length of the
road with our engineer. Additionally, please note that we are proposing to extended the fire hydrant to a
distance that is within 300' feet of all structures. I am also not sure how the structures would be sprinkled
while under construction. By the time the units are complete, fire access will not be an issue. Our plan on
how to maintain the fire access is unsophisticated but the sequencing can best be explained in
person. Essentially we will build the permanent infrastructure up to the fire road and remove the fire road
when the adjacent infrastructure is complete. Please let me know when you are able to meet.
Thanks
Christopher Stull
Asst. Vice President
Toll Brothers - Colorado
(0)303-254-7494
(F) 303-452-3433
The information provided herein is for informational purposes only. Nothing contained herein is intended to obligate or
bind Toll Brothers, Inc., its affiliates, or subsidiaries unless signed by all parties in an Agreement of Sale.
From: Jim Lynxwiler [mailto:jlynxwiler@poudre-fire.org]
Sent: Thursday, January 30, 2014 5:26 PM
To: Chris Stull
Cc:'linda.ripley@ripleydesigninc.com'; Sheri Langenberger
Subject: RE: Kechter Farm
Hello Chris,
Thank you for your time yesterday afternoon. After our discussion, I had the opportunity to meet with the Fire Marshal
regarding the proposed temporary fire lane at Kechter Farm which would enable construction of the clubhouse and
three model homes prior to or in conjunction with installation of the utilities and road infrastructure. The general plan
(width, road base, turnarounds, turning radii, etc.) for the fire lane is fine, however as I presumed, he is concerned about
the overall length of the dead end road; which as I understand it, is 1200 feet or more in length. He is asking that the
three model homes as well as the clubhouse be sprinklered in order to account for the access problem. He is also asking
me to have a conversation with you to better understand how the temporary fire lane will be preserved during
construction of Eagle Roost Drive and Zephyr Road, or in other words, how fire access can be maintained, uninterrupted
while permanent roads are being built. Please contact me at your convenience. I'm also happy to meet with you in
person should that be preferable.
Regards,
Jim Lynxwiler
Poudre Fire Authority
Community Safety Services
102 Remington St.
Fort Collins, CO 80524
970-416-2869
From: Jim Lynxwiler
Sent: Wednesday, January 29, 2014 12:26 PM
To: 'cstull@tollbrothersinc.com'
Cc: linda.ri Ig_ey@riplM designinc.com; Sheri Langenberger
Subject: FW: Kechter Farm
Hello Chris,
I received your email from last evening alerting me to your original email of January 16th. Sorry, I'm not quite sure how
this was overlooked and I certainly regret any delay it may have caused you. As I've been unable to reach you by phone,
I hope this email will provide the information you need to proceed.
I've reviewed your attachment, titled "Exhibit A — Temporary Access," which connects Trilby Road to the Kechter Farms
Development so as to allow construction of the clubhouse and model homes on either side of this temporary fire lane at
its southern extent. Overall the plan looks very good. My only question for you relates to the sharp, less-than-90 degree
turn shown near the final intersection of Zephyr Rd. and Eagle Roost Dr. As long as this turn meets our turning
requirements (25' inside radius, 50' outside radius) we should be fine.
Please contact me should you need additional assistance.
Thanks,
Jim Lynxwiler
Poudre Fire Authority
Community Safety Services
102 Remington St.
Fort Collins, CO 80524
970-416-2869
From: Chris Stull fmailto:cstull0tolibrothersinc.coml
Sent: Tuesday, January 28, 2014 11:18 PM
To: Jim Lynxwiler
Subject: FW: Kechter Farm
Jim,
I wanted to follow up on the email below that I sent a few weeks back. Is there a time that we could meet to
discuss? Please feel free to call me directly at 303-435-0114 if needed.
Thanks
Christopher Stull
Asst. Vice President
Toll Brothers - Colorado
(0) 303-254-7494
(F) 303-452-3433
Toll Trother
An--e.,,ca -, L—wri Mine Bu,'Ider * J
The information provided herein is for informational purposes only. Nothing contained herein is intended to obligate or
bind Toll Brothers, Inc., its affiliates, or subsidiaries unless signed by all parties in an Agreement of Sale.
From: Chris Stull
Sent: Thursday, January 16, 2014 10:12 AM
To: 'Jim Lynxwiler (ilynxwiler pgudre-fire.org)'
Cc: Jason T. Claeys <jclaeys(&ivajva.com> (iclaeys(&Jvajva.com)
Subject: Kechter Farm
Jim,
You and I met several weeks back to discuss the requirements for a temporary access at the Kechter Farm
project. This temporary access would allow us to start the construction of the community rec center along
with 3 model homes prior to the streets being completed. I have attached a diagram that our engineering firm
has completed to illustrate our intent. Your feedback to grant approval is appreciated. If needed I am
available to meet and review in person or can be reached on my cell phone at 303-435-0114 if you have
further questions.
Thank you!
Christopher Stull
Asst. Vice President
Toll Brothers - Colorado
(0)303-254-7494
(F) 303-452-3433
"Toll I-. rya er
1,r:�rcd5 Lacy UN 11clatt bufArr'
The information provided herein is for informational purposes only. Nothing contained herein is intended to obligate or
bind Toll Brothers, Inc., its affiliates, or subsidiaries unless signed by all parties in an Agreement of Sale.
Sheri Langenberger
From: Sheri Langenberger
Sent: Thursday, January 16, 201410:09 AM
To: 'Jason T. Claeys'
Cc: Wyatt D. Dubois; John G. Jordan; Clint Jones Oonescd@co.larimer.co.us)
Subject: RE: Kechter - Cul-de-sac and profile example
Jason
I will take a look at these and provide you with some comments once I've had a chance to review them.
After our last meeting I did have a chance to look into the couple of items that we discussed.
For the irrigation pipe that is proposed to cross the row in several places. The standard as we have been discussing is
that the pipe needs to be sleeved. We can look at alternatives but the irrigation pipe type and material must be some
type of water tight pipe (gasketed pipe) and it will depend on how large the pipe is and the design and pipe type. So I
need additional information on the design of this system.
As for the radii for the bump out. 15 foot radii where used in Rigden Farm. This is the radii that should be used for the
inner radii a 10 foot radii can be used for the outer radii.
For Chicory Court — based on the design being that the inlets are sized for the flows and this area is not intended to be a
detention pond area cut off walls do not need to be provided behind the street curb. We would like to see some sort
of grouted rip rap or other conveyance structure from the curb openings to help direct the flows away from the street
and to the inlet. This will also prevent undermining of the curb where the water leaves it.
Sheri
Sheri Langenberger
Development Review Manager - Engineering
City of Fort Collins
(970)221-6573
From: Jason T. Claeys [mailto Jclaey_*(&jyajva.com]
Sent: Tuesday, January 14, 2014 3:30 PM
To: Sheri Langenberger
Cc: Wyatt D. Dubois; John G. Jordan
Subject: Kechter - Cul-de-sac and profile example
Sheri,
We generated a game plan that should satisfy the design requirements for the Kechter cul-de-sacs. I would like to see if
you can take a quick moment to review our game plan presentation to be sure that it satisfies your design review needs
and also LCUASS.
Attached is profile sheet for Saker Court. You should notice at the end of Saker Court, prior to the cul-de-sac, there are
notes to direct the reviewer and contractor for the profile of the cul-de-sac. The other attachment is of the cul-de-sac
detail that includes a separate flowline stationing around the cul-de-sac. The stationing from the street alignment is
labeled in the plan view to direct the contractor/reviewer to the same points between both profiles. A version of a
station equation.
Thank you in advance for your time. Please let us know if you have any questions/comments/suggestions.
Sincerely,
JASON T. CLAEYS, P.E., LEED AP
Project Manager
JVA, Incorporated
25 Old Town Square, Suite 200
Fort Collins, CO 80524
www.ivaiva.com
Direct: 970.530.0818
Mobile: 970.817.1712
Phone: 970.225.9099
Fax: 970.225.6923
Boulder • Fort Collins • Winter Park