September 30, 2013
Mr. Robert Helmick, AICP
Development Planning
200 West Oak Street, Suite 3100
P.O. Box 1190
Ft. Collins, Colorado 80521
Dear Mr. Helmick:
Sent via facsimile #i 970-49&7711
September 25, 2013, Theresa Shepherd and I met with you at the Larimer County
Planning office window to pick up preliminary plans for the Kechter Farm Development.
You presented us copies prepared as requested. I also asked for the Zeigler Road design.
You found it on page 52. Since it was within a large bundle of drawings, you asked that I
request a copy from JVA Consulting Engineers. You gave me the name of the project
engineer, Jason and his phone number. Additionally.yAu stated there was no r ght-o f wav
(ROW) taken from our side of thf street, which is the east side.
We picked up copies of sheet 52 at the JVA Ft. Collins office on Friday, September 27.
After reviewing the plan for the street improvement, I noticed 2 existing ROWS identified
on the east side of Zeigler Road. There were also 2 statements on the page identifying the
existing ROW is based on the Fossil Creek PUD Id filing. We are located in Fossil Lake
PUD. Last year, during a community meeting with the developers, we were given the street
improvements drawn on aerial photos. It also showed 2 existing ROWs. When I asked
why 2 ROWs, Tom Daugherty told us the top or the most easterly ROW was incorrect.
'Today I spoke with Jason Claeys, JVA Project Manager for Kechter Farm. He stated the
CAD operator make a mistake with the incorrect PUD. He also said JVA had been under
extreme pressure to produce the documents. When asked about the 2 existing ROWS
shown, he replied the upper or the farther east ROW was incorrect.
Herein lies the problem, the 60' of ROW was measured from the upper ROW not the lower
ROW. According to my measurements from the lower ROW, the street improvement is
now 12.50' short. It is now down to 47.50' of ROW.
Jason also told me the Kechters did not want to vacate any ROW and 3.50' of ROW was
coming from the east side of the street. The parkway on Zeigler Road is 4' wide on the
south side of Rookery Road not 6' wide, as on the north side of Rookery. If 3.50' is taken,
there will be no parkway, and the curb will be against the sidewalk. In other words, the
street will be even closer to our house creating safety issues.
`Toll `Brothers°
April 17, 2014
Mr. Kenneth J. Kechter &
Mrs. JoAn E. Kechter
KenJo Legacy, LLC
6841 Hidden Springs Road
Fort Collins, CO 80526
Re: Lot 3 Water Well - 248069
Dear JoAn, Ken & Ron:
Mr. Ronald A. Kechter
A. W. Kechter, LLC
5024 Harvest Moon Circle
Fort Collins, CO 80528
The land improvements on Lot 1 include some dewatering of the high groundwater table to facilitate the
planned development. As a result, Toll Brothers performed a registered well search within a 600ft
boundary of our project, in accordance with State regulations. The water well on Lot 3of Kechter Farm
MLD, registered with the State of Colorado #248069, was identified in our search. We understand that
this well is supplied by water from a source about 30ft below ground. The underdrain for Lot 1 drains
water above the bedrock (25ft and above) which we do not believe will affect the operation of the well.
Please sign in the space indicated below to acknowledge your attention to this.
Should you have any questions or concerns regarding this matter please do not hesitate to contact me.
We greatly appreciate your prompt attention to this matter and look forward to completing our closing.
Sincerely,
Mark Teplitsky
Toll Brothers, Inc.
Mr. Kenneth Kechter
KenJo Legacy, LLC
Mr. Ron Kechter
A.W. Kechter, LLC
s. JoAn Kechter
KenJo Legacy, LLC
10 Inverness Drive East, Suite 125 — Englewood - Colorado — 80112 - P: (303) 708-0730 - F: (303) 708-0731
Oct 02 2013 1:54PM HP LRSERJET FAX S FELLER 970226457 page 2
Page 2
Robert Helmick
Last year I had numerous conversations with Ft. Collins Planning Department regarding
the ROW on the east side of Zeigler Road. I -Was assured if gib �.�.ROW was rea lmd
it would come from the Kech,_ter nMn on the,WestSI&O of i e street.
It appears this is the second time the Kechters have refused to vacate ROW. Zeigler Road
starts to curve easterly in the middle of the drives in front of the northernmost farm house.
There does not seem to be any logical reason for the curve other than to preserve the
existing Kechter structures. The developers' representatives made It very clear streets with
curves are not desirable with the city or county.
It is apparent the Kechters' desire to sell the agriculture ground for a higher use and profit
in the process. I am not opposed to the development; however, all actions created by the
development have a consequence. The one that is first and foremost at this time is by the
ROW where there is nothing left to take. ing
Why make homeowners on the east side of
Zeigler Road pay twice because the Kechter properties are too close to the street?
Since the Kechters do not want to vacate any ROW„ why not just forget about Zephyer
Road intersection across from Rock Park Drive? It would certainly solve many issues.
Zeigler Road would not have to be improved; school children would not be put fn peril
with the crossover traffic on Rock Park Drive and Crane Drive and 1,500 plus vehicles per
day would not be added to Zeigler Road south of Rookery Road.
In conclusion, I do not agree with any subtraction of ROW from the east side of Zeigler
Road and highly recommend the closure of the intersection of Zephyer Road to Zeigler
Road. Your written response is requested within 5 business days.
Respectfully submitted,
Stephanie Feller
Sheri Langenberger
From:
Sheri Langenberger
Sent:
Wednesday, October 22, 201411:19 AM
To:
Brian J. Campbell
Cc:
Shane Boyle; Glen Schlueter
Subject:
FW: Kechter Farm Storm Culvert Crossing
Attachments:
20141007164256.pdf
Brian
I took a look at the attached sheet that you had sent to Rob, reviewed it and talked to Stormwater about this as well.
The new pipe under Trilby that you are showing doesn't meet our cover requirements (minimum of 3 feet from top of
pipe to top of pavement) and we would not approve this as shown.
This section also is showing changes to the overall grading plan and those sheets will also need to be revised to show the
revised grading you are proposing.
This location (south side) was identified as a field access to the south property — does this proposal impact that? Will
this still be used as a field access and is there enough room between this and the future back of lots for this to
accommodate this?
The addition of this pipe looks like it will impact one tree, but as long as they can just move that tree to the west and still
get it planted in the area a minor amendment will not be needed for the loss of the street tree.
Please let me know if you have any questions.
Engineering and Stormwater will both need to review and sign off on these revisions so please send the revised sheets
to both of use for review.
Thanks
Sheri
Sheri Langenberger
Development Review Manager - Engineering
City of Fort Collins
(970) 221-6573
From: Robert Mosbey
Sent: Tuesday, October 14, 2014 2:39 PM
To: Sheri Langenberger
Subject: FW: Kechter Farm Storm Culvert Crossing
Here's the email from Brian with the revision sheet (second page).
Rob V. Mosbey
Chief Construction Inspector
rmosbevCDfcaov.com
(970) 221-6659 (office)
(970) 213-8537 (cell)
From: Brian J. Campbell [mailto•bcampbell jvajva.com]
Sent: Tuesday, October 07, 2014 4:46 PM
To: Robert Mosbey
Subject: Kechter Farm Storm Culvert Crossing
Hi Rob,
As you may be aware, the original JVA project manager for this project has left JVA and I am in the process of trying to
tie up any loose ends that have come up during the construction process. Attached is a revision to the approved plan
Sheet 73. The Irrigation Overflow Crossing at Trilby needs to be included on this plan as shown on the attachment. Can
we handle this through an as -built process or do we need to complete a plan revision? Let me know.
Thanks,
Brian
BRIAN J. CAMPBELL, P.E.
Project Manager
JVA, Incorporated
25 Old Town Square, Suite 200
Fort Collins, CO 80524
www.iva4va.com
Direct: 303.565.4883
Phone: 970.225.9099
Mobile: 970.531.8592
Fax: 970.225.6923
Boulder • Fort Collins • Winter Park • Glenwood Springs
i-
March 25, 2014
Mr. Bob Poncelow
Poudre Fire Authority
102 Remington St
Fort Collins, CO 80524
Re: Kechter Farm
Dear Bob:
cToll 93rothers
America's Luxury Home Builder®
Thank you for meeting with me last week regarding our project and our proposed plan to facilitate an
earlier start of our model homes and clubhouse, prior to installation of utility and road infrastructure.
Attached, please find the amended temporary access plan for your use and approval. As requested we
incorporated the following changes:
• Temporary access road was increased to 30'
• Hammerheads were added where requested
• Construction parking and unloading has been illustrated
• Emergency vehicle turnaround has been increased to 100' diameter
• Road base for the temporary access road has been identified as CDOT Class 6
As we discussed, the Poudre Fire Authority's approval will apply only to construction of the model
homes and clubhouse. Occupancy of the buildings shall not take place until all of the typical
requirements of our development agreement with the City of Fort Collins, Poudre Fire Authority
regulations, and typical certificate of occupancy regulations have been met.
Please confirm the Poudre Fire Authority's agreement to our proposed plan by signing in the space
provided below.
We look forward to working with you and the fire authority throughout this project.
Si erely,
Mark Teplitsky
Project Manager
Toll Brothers, Inc.
Bob oncelow
Poudre Fire Authority
New York Stock Exchange • Symbol TOL
Colorado Division
10 Inverness Drive East, Suite 125 • Englewood, CO 80112 • (303) 708-0730 • Fax (303) 708-0731
tollbrothers.com
No Text
Sheri Langenberger
From: Mark Teplitsky <mteplitsky@tollbrothersinc.com>
Sent: Wednesday, March 26, 2014 10:32 AM
To: Sheri Langenberger
Subject: FW: Kechter Farm
Sheri,
Please see acknowledgment regarding sewer installation adjacent to the clubhouse/models below. Thanks.
From: tfarrill aol.com [mailto:tfarrill@aol.com_]
Sent: Wednesday, March 26, 2014 8:17 AM
To: Mark Teplitsky
Subject: Re: Kechter Farm
Mark,
The installation of 134 as discussed is:acceptaole`to Ehe'.Distr ct
Terry
Mr. Terry W. Farrill, P.E.
District Engineer
Fort Collins - Loveland Water District
South Fort Collins Sanitation District
5150 Snead Drive
Fort Collins, CO 80525
Phone: (970) 226-3104 ext. 104
Fax: (970) 226-0186
tfarrill aol.com
-----Original Message -----
From: Mark Teplitsky <mteplitsky(cDtollbrothersinc.com>
To: tfarrill <tfarrill0-aol.com>
Cc: Chris Stull <cstull(cDtollbrothersinc.com>
Sent: Mon, Mar 24, 2014 5:55 pm
Subject: Kechter Farm
Terry,
Thanks for taking a look at the sequencing plan I sent you last week. Once your operations folks have had a chance to
review I look forward to getting their feedback so we can finalize on our end.
In regards to the section. of B4�
clubhouse, Sheri; has asked foi
install that section In between,'
adequately inspect the.installal
Mark Teplitsky
Project Manager
Toll Brothers
970-222-7930
and
talked, Toll will
ability to
'Toll
Arneric-I'S 1'11.xu ;1' Iicirne Builder*'
April 7, 2014
Mr. Kenneth J. Kechter &
Mrs. JoAn E. Kechter
KenJo Legacy, LLC
6841 Hidden Springs Road
Fort Collins, CO 80526
Re: Kechter Farm Lot 1 Closing
Dear JoAn, Ken & Ron:
Mr. Ronald A. Kechter
A. W. Kechter, LLC
5024 Harvest Moon Circle
Fort Collins, CO 80528
Enclosed with this letter, please find an aerial depiction and respective cross -sections illustrating the
widening to be done on Ziegler road and the associated grading work along the right-of-way. Please note
that the road and grading work will be completed by Toll Brothers. In addition, Toll Brothers will install
the drive cuts as indicated, the necessary tree protection, the modification to the east tip of the Mail Creek
Ditch, and shall perform reseeding of the native grass within the area of disturbance. Due to the
proximity to existing trees, Toll will consult with an arborist prior to any work to ensure appropriate
protection of the trees is taken.
After your review, please sign in the indicated space below to confinn your acknowledgement of this
work.
We greatly appreciate your prompt attention to these documents and look forward to completing our
closing.
cerely,
Mark Tep tsky
Project Manager
Toll Brothers, Inc.
M Kenneth Kechter
KenJo Legacy, LLC
d 0"
Mr. Ron Kechter
A.W. Kechter, LLC
4�_�
JoAn Kechter
KenJo Legacy, LLC
New Yofk Stock Exc ia.tige * Symbol T01.
Colorado Division
10 Iriverriess Drive East, Suite 125 • 1 11glewood, CO 80112 • (303) 708-0730 • Fax (303) 70€3-0731
tolltxrrlt Irers. rom
ILLUSTRATION
SN�4� 9MVMauM9 2M67XrA•
RO•
B efki
1241 2+,•6s lZA(.
ex.rl*�yfl � s ma✓ FWwHPm
Hwo w�'w-
Dwv�'9
Siet•4 � / 1i�C RP
2y.W 4I.�t
�Atic eF i.(6
wAs4- FtrW4ANE
Dwvw.w�
5 �Ki Ztldti+� PO•
EW'AIuV � I
D zH.ay
gkcac sF ?A•Tc
Q-K,