Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK THIRD SECOND TEPLAT - Filed H-HISTORICAL MAPS - 2015-03-02City 0� Planning, Development & Transportation Engineering Department Fort Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax DEVELOPMENT CONSTRUCTION PERMIT Permit Number: / 3 _ Z _?> Issuance Date: Project Name: Harmon Technology Park Third Filin Second Re lat Project Location: south side of Precision Drive west of Lad Moon Drive Permittee: Derek Cohen Brinkman Construction City and developer contacts: See attached Exhibit iis "for names and phone numbers of all contact persons f project. 00. Fees: Permit Application Fee (paid at the time of application) $ 20020000 Construction Inspection Fee (paid prior to issuance of this permit) otal 814.00 Development Bond or other approved security: Amount of security deposited withohWri Ity to n the approved uarantee the plans for the developmentpletion of all ublic improvements to be constructed ass $ 10 169.50 Form of security deposited with the City: check PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Proj ect Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. N 3. Construction time restrictions: n/a Development Construction Permit, Page 2/6 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration in accordance with Section 2.6.3(K) of the Land Use Code: a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the 11 as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. OR Development Construction Permit, Page 3/6 N 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: n/a Permittee's acknowledgment signature: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: Date: w 13 Approval for issuance: j:;,City Engineer Approval ) Date: la (Permit Issuance Date) N Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: City Staff Contact Persons: Development Engineer: Harmony Technology Park Third Filing, Second Replat Marc Virata 281 North College Avenue, Fort Collins, CO 80524 970 221-6567 Construction Inspector: Wayne Lenard 281 North College Avenue, Fort Collins, CO 80524 970 222-6824 Current Planner: Pete Wray 281 North College Avenue, Fort Collins, CO 80524 970 221-6754 Water Utilities Engineer: Erosion Control Inspector: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 970 221-6854 Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 970 218-2932 Natural Resources: Lindsay Ex 281 North College Avenue, Fort Collins, CO 80524 970 221-6143 Traffic Operations: Ward Stanford 626 Linden Street, Fort Collins, CO 80524 970 221-6820 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Forestry: Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 M Development Construction Permit, Page 5/6 970 221-6641 Light and Power: Doug Martine 700 Wood Street, Fort Collins, CO 80521 970 224-6152 Developer' Contact Persons: Permittee/General Contractor: Owner/Developer: 19 Architect/Planner: Project Engineer: M Derek Cohen Brinkman Construction 3003 E. Harmony Road, Suite 300 Fort Collins, CO 80528 970 672-1008 (office) 970 443-4417 (cell) 970 206-1011 (fax) derek.cohen@brinkmanpartners.com Dan Berlin / Jeff Reed CBI Real Estate Holdings, LLC 3461 Precision Drive Fort Collins, CO 80528 970-482-8845 (office) 970-217-9930 (cell) 970-482-4236 (fax) dberlin@customblending.com Matt Chaiken Ware Malcomb 6251 Greenwood Plaza Blvd. Building 6, Suite 100 Greenwood Village, CO 80111 720-488-2626 x1505 (office) 303-689-1505 (cell) 720-488-2625 (fax) mchaiken@waremalcomb.com John Gooch Aspen Engineering 19 Old Town Square, Suite 238 Fort Collins, Colorado 80524 970-419-4344 (office) 970-420-5345 (cell) Development Construction Permit, Page 6/6 johng@aspen-engineer.com General Contractor: Dave Lenort Brinkman Construction 3003 E. Harmony Road, Suite 300 Fort Collins, CO 80528 970 267-0954 (office) 970 631-7636 (cell) 970 206-1011 (fax) Dave.lenort@brinkmanpartners.com M M