Loading...
HomeMy WebLinkAboutCOLORADO IRON AND METAL EXPANSION - Filed CS-COMMENT SHEETS - 2014-08-04Response to Comments Colorado Iron & Metal Expansion 5/30/2012 Department: Zoning Contact: Noah Beals, 970416.2313, nbeals &_fcgov.com 1. The new portion of land will need to be platted and will require a PDP and FPD to expand COLORADO IRON AND METAL on to it. It is suggested that the PDP and FPD for the new portion of the land include the existing site. If it does not include the existing site then a major amendment will be required to create driveway access between the two FDP and expand the use of the business to the new portion of land((including relocating a building to be on both lots). A major amendment will be required also to use the new portion of land for stormwater needs of the existing FDP. RESPONSE: As suggested, we have decided to proceed with a PDP/FDP for the entire site, both old and new parcels. 2. LUC 4.28(E)(3)(a)(1) and LUC 4.28(E)(3)(b)(1.) Screening is required of industrial uses/activities and storage not within a fully enclosed structure RESPONSE: Accommodated in the Fencing Plan. 3. LUC 3.2.1 A landscaping plan is required and will need to include street trees LUC 3.2.4 A Lighting plan is required RESPONSE: Acknowledged. 4. LUC 4.28(E)(2)(c) New building color shades shall be neutral, with a medium or dark color range, and not white, bright, or reflective. RESPONSE: Acknowledged. 5. A 10 ft fence will require a building permit and need to be painted to match the building on site. RESPONSE: Acknowledged. Department: Water -Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington(cDfcgov.com 1. Will any additional water or sewer services be needed for the recycling facility? RESPONSE: We proposed a restroom in the building. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty(alcaov.com Topic: Building Deviations Comrnent Number: 22 Comment Criginated: 06/23/2012 06/23/2012: Please change the project titre on ail sheets to "Colorado Iron & Metal Second Fling". Topic: Constnxtion Drawings Comrnent Number. 213 Comment Criginated: 06/23/2012 06/23/2012: Please change the project title on all sheets to "Colorado Iron & Metal Second Fling". Comrnent Number: 29 Comment Criginated: 06/23/2012 06/23/2012: Please change the legal description to match the Subdivision Plat being filed. Comment Number: 30 Corr7nent Originated: 06/23/2012 06/23/2012: The sheet description for C11 in the cover sheet index doesn't match the description show on sheet C11. Cormrnent Number: 31 Comment Originated: 06/23/2012 06/23/2012: Please be consistent with the benchmark descriptions on sheet C2. Coornryient Number: 32 Comment Originated: 06/23/2012 06/23/2012: Please correct the benchmark system name on sheet C2. Comrnent Number: 33 Comment Originated: 06/23/2012 06/23/2012: There are line over text issues on sheets C7, C8 & C9. Topic: General Comment Number: 24 Comment Criginated: 06/23/2012 06/23/2012: Please change the project He on the Phasing Plan sheet to "Colorado Iron & Metal Second Fling". Carrnent Number: 25 Corrirrient Criginated: 06/23/2012 06/23/2012: Please increase the text sizes on the sheet 5 Phasing Plan. Comment Number 26 Comment Originated: 06/23/2012 06/23/2012: Rease change the project title on the Fencing Ran sheet to "Colorado Iron & Metal Second Fling". Cornrnent Number: 27 Comment Criginated: 06/23/2012 06/23/2012: Please increase the text sizes on the sheet 6 Fencing Ran. Topic: Landscape Plans Comment Number: 20 Comment Criginated: 06/22/2012 06/22/2012: Please change the project title on all sheets to "Colorado Iron & Wtal Second Fling". Comment Number: 21 Comment Criginated: 06/23/2012 06/23/2012: Rease increase the text sizes on sheet 3. Topic: Lighting Plan Department: Technical Services Contact: Jeff County, 970-221-6588, jcountyCcifegov.com Topic: lighting Plan Comment Number: 23 ConTrent Originated: 06/23/2012 06/23/2012: Please change the project title on ail sheets to "Colorado Iron & Metal Second Fling". Topic: Plat Comment Number: 1 Canmient Originated: 06/22/2012 06/22/2012: The outer boundary doses. Cormrmient Number. 2 Comment Originated: 06/22/2012 06/22/2012: Please add reference to Lot 23 of North Lemay Subdivision Second Fling in the sub -title. See redlines. Corrrrrent Number: 3 Camrnent Originated: 06/22/2012 06i22012: There seems to be a typo in the legal description. Comment Number: 4 Corrrnent Originated: 06/22/2012 06/22/2012: Are any of the easements shown as "dedicated by rec. no." dedicated to an entity other than the City of Fort Collins? If so, please note this with appropriate easement. C Tna t Number: 5 Comment Originated: 06/22/2012 06/22/2012: Are there any lienholders? If so, please add the signature block. Cormtnent Number: 6 Comment Originated: 06/22/2012 06/22/2012: Please add title policy infommation in the Title Commitment Note. C n neat Number: 7 C Timent Criginated: 06/22/2012 06/22/2012: Pease label all adjoining properties, platted or unplatted. Comment Number: 8 Comnxnt Originated: 06/22/2012 06/22/2012: Pease show the southwest corner & south line of Parcel #1 per rec. #20070090962. Cormnient Number: 9 Cornrnent Originated: 06/22/2012 06/22/2012: Pease add a full decription of both monuments on the basis of bearings, and provide monument records for these comers. Comment Number: 10 Comment Originated: 06/22/2012 06/22/2012: Pease provide the reception number for the 25 Drainage Easement at the south end of the properly. Comnv4 t Number: 11 Comment Crginated: 06/22/2012 06/22/2012: Pease provide the reception number for the 39 Temporary Constniction Easement along the west side of the property. Comment Number: 12 Comment Originated: 06/22/2012 06/22/2012: There are several descrepancies between the legal description and what is shown on the drawing. See redlines. Comment Number: 13 Comment Originated: 06/22/2012 06/22/2012: Pease show the lineenortk for Lot 23 of North Lemay Subdivision Second Fling. Department: Technical Services Contact: Jeff County, 970-221-65M, icounb,0cgov.com Topic: Plat Commend Number: 14 ConTrent Originated: 06/22/2012 06/2212012: Please show the full width of right of way for Buckingham Street. Comment Number: 15 C Tment Originated: 06/22/2012 06/2212012: Please show how the right of way of Buckingham Street was dedicated. Comment Number: 16 Conmient Originated: 06/22/2012 06/2212012: Please check the symbols for the boundary monuments. Some of them are showing as being set, when they were set on the Colorado Iron and Metal plat previously. Topic: Site Plan Comment Number. 17 C ri ent Originated: 06/22/2012 06/22/2012: Rease change the project title on all sheets to "Colorado Iron & Metal Second Fling". Comment Number: 18 C nment Originated: 06/22/2012 06/22/2012: Rease change the legal description to match the Subdivision Rat being filed. Comment Number- 19 Comrnent Originated: 06/22/2012 06/22/2012: Rease increase the text sizes on sheet 2. Department: Traffic Operation Topic: General Cormient Number: 1 Comment Criginated: 06/26/2012 06/26/2012: Project isn't increasing in scope or scale, just repositioning some already approved buildings on a larger land area. No traffic related issues. Corrrnent Number: 1 Comment Originated: 06/22/2012 06/2212012: Add note to core drill opening in eAsting MH for the new sewer service. Co nrnDnt Number: 2 CaTrnent Originated: 06/22/2012 06/2212012: There has been a change in the approach to the fire hydrant that needs to be moved. This is an old hydrant that needs to be replaced. Rease add the appropriate notes to require that the hydrant be replaced and that the new valve on the hyrant run be installed and restrained to the tee on the 12' rrain. The other references to coordinating with Water Utilities on the shutdown would be the same. Department: Zoning Contact: Noah Beals, 970-416-2313, nbealgMcgay.com Department: Zoning Contact: Noah Beals, 970-416.2313, nbealsCcfcgov.can Topic: General Cormxnt Number: 1 CorTrnent Originated: 06/25/2012 06/25/2012: Sheet 2 and 3 Have a note that an area around building three will be (interim gravel base future asphalt surface). This note does not match the phasing plan of sheet 5. Rerrove this note (interim gravel base future asphalt surface) from site and landscape plan and incorporate the gravel base to asphalt change into the phasing plan. Co wnent Number: 2 Comment Originated: 06/25/2012 06/25/2012: Cn the phasing plan phase 3 is indicated to be planted with a dryland seed mix. Details of the seed mix needs to be identified on the plans and approved by the city enviromental planner. Comment Number: 3 CArrrnent Originated: 06/25/2012 06/25/2012: Is building 2 to be constructed under phase 2? Mat is phase 1 improvements tied to? There needs to be a note that all interim conditions will be eorrpleted during phase 1. A note needs to be added that if the phases are not completed within five years of approval of the Final Development Plan that those not completed will need to be reviewed by minor amendment to bring the site into compliance with the current code of the future time. Notes on the landscaping plan about the timing of improvements of the detention plan contradict the phasing plan. Remove these notes from the landscaping plan and incorporate them into the phasing plan. -k P Project: Colorado Iron & Metal Expansion (Replat) Project Description: This is a combined Project Development Plan/Final 7velopment Plan request to replat and add an adjacent 3.015 acres to the existing approved Colorado Iron and Metal Final Development Plan, #FDP110005 of 5.72 acres, combining both lots for a total of 8.739 acres. The existing 5.72 acre site currently contains a 30,000 sq. ft. building. A 50' x 40' building, approved on the previous FDP110005, would be constructed on a portion of the added 3.015 acres, as well as approximately 1/3 of another 100' x 40' building also approved on the previous FDP. Sign posted; #49 Date: 06/27/2012 Issue ID: 1 Topic: Construction Drawings Round: 1 Status: Resolved Issue: 06/27/2012: Please provide a clearer "sharper" key map that is easier to read and can be reproduced. Date: 06/27/2012 Issue ID: 2 Topic: Construction Drawings Round: 1 Status: Resolved Issue: 06/27/2012: Sheet C1 - Revise the legal description on the cover sheet 1 to match the plat or vice a versa Date: 06/27/2012 Issue ID: 3 Topic: Construction Drawings Round: 1 Status: Resolved Issue: 06/27/2012: Sheet C3 - Label adjacent lot ownership on similar to what was done on sheet C4. Date: 06/27/2012 Issue ID: 4 Topic: Plat Round: 1 Status: Active Issue: 08/06/2012: The new easement shows up on the site plan but has not been added to the plat. Please add to the plat. 06/27/2012: Verify with Poudre Fire that the emergency access easement isn't required to be extended to the west for buildings 2 & 3. Date: 06/27/2012 Issue ID: 5 Topic: Construction Drawings Round: 1 Status: Resolved Issue: 06/27/2012: Sheet C3 - Their was a proposed fire hydrant callout on the previous plans located along Buckingham just west of the east access. This callout appears to be missing from these plans. Has the fire protection been revisited? Date: 06/27/2012 Issue ID: 6 Topic: Construction Drawings Round: 1 Status: Active JIssue: 08/06/2012: What road material is anticipated for access to the Phase 2 bailer building? Please add note or callouts for road materials for access and the emergency access road. 06/27/2012: Please revisit the phasing shown on all sheets. Their are some discrepancies between C3 and C4 for example. Ensure that all are consistent. Date: 06/27/2012 Issue ID: 7 Topic: Plat Round: 1 Status: Resolved Issue: 06/27/2012: The temporary construction and slope easements are not processed through the City of Fort Collins. However, they will need to be recorded and copies provided to Engineering prior to signing mylars. Date: 06/27/2012 Issue ID: 8 Topic: General Round: 1 Status: Resolved Issue: 06/27/2012: Buckingham was resurfaced in 2011. Any cuts in the pavement may be subject to triple impact fees. Date: 6/27/2012 Issue ID: 9 Topic: Construction Drawings Round: 1 Status: Active Date 08/06/2012: Sheet C8, add stationing under the preliminary design callout. 06/27/2012: Sheet C7 & C8 - Consider removing overall Buckingham street plan station callout title and instead list the stationing under the "preliminary" and "frontage" callouts. Date: 06/27/2012 Issue ID: 10 Topic: Construction Drawings Round: 1 Status: Resolved Issue: 06/27/2012: Sheet C9 - Ensure that stationing of Cross Sections match the profile stations. Page 1 of 2 Project: Colorado Iron & Metal Expansion (Replat) Project Description: This is a combined Project Development Plan/Final Development Plan request to replat and add an adjacent 3.015 acres to the existing approved Colorado Iron and Metal Final Development Plan, #FDP110005 of 5.72 acres, combining both lots for a total of 8.739 acres. The existing 5.72 acre site currently contains a 30,000 sq. ft. building. A 50' x 40' building, approved on the previous FDP110005, would be constructed on a portion of the added 3.015 acres, as well as approximately 1/3 of another 100' x 40' building also approved on the previous FDP. Sign posted; #49 Date: 06/27/2012 Issue ID: 11 Topic: Plat Round: 1 Status: Active Issue: 08/06/2012: The 45' drainage and access easement is now shown on the plat but is being designated as being vacated. This easement will need to remain to provide access to the property to the east for the parking lot and concrete slab. 06/27/2012: The 45' Drainage and access easement on the east side of the project is not shown on the replat. Shouldn't this access still remain for the adjacent lot? Date: 06/27/2012 Issue ID: 12 Topic: Plat Round: 1 Status: Active Issue: 08/06/2012: The drainage easement is now shown. However, the temporary construction easement is not and specifically the area where it is outside of the property boundary at the south end of the site. 06/27/2012: The drainage easement dedicated on the original plat is no longer being shown and it is assumed that it is being vacated by this plat. Is it possible to show a legend of what is being vacated and dedicated by this plat similar to what was done on the original? Similarly, the offsite temporary construction easement on the original plat could be shown with a hatch to clearly show what portions are being vacated by this plat. hate: 08/08/2012 Issue ID: 13 Topic: Construction Drawings Round: 2 Status: Active ✓ Issue: 08/08/2012: Sheet C3 - Add standard street cut note to this sheet. Date: 08/08/2012 Issue ID: 14 Topic: Construction Drawings Round: 2 Status: Active Issue: 08/08/2012: Sheet C5 - More information is needed for grading design i.e. (spots, slopes, corners, etc.) ate: 08/08/2012 Issue ID: 15 Topic: Construction Drawings Round: 2 Status: Active Issue: 08/08/2012: Transfer phasing notes from seperate phasing plan to a phasing sheet in the utility plans. Date: 08/08/2012 Issue ID: 16 Topic: Construction Drawings Round: 2 Status: Active Issue 08/08/2012: The development agreement will need to be revised and re -recorded in order to include the additional area being added with this project. Page 2 of 2 fr V�, 2 � l Z6 �Z �, S,4� Da--p,artment: Current Planning intact: Seth Lorson, 970-224-6189, slcwson(q-jgpv.,com Toric-, Undscape, Flans Corfm4t NUab",r: 11 Ccfm-e,,t aqir�?,ed: 08`35`2012 0&0, r 2(012. S,irra* and Sprirxj, S,-,c;,,,VCraIb but the t.-Otai qluanfltj<� do not axredly add up. Please r Z I :�OWOQA Dcpkart-fm-rI: Etigint-i,igD--vc4WrientRaiie,,,,j Cot-Aact: Andrewk('34im-fich, 970-221-6603, aqinmrjchOcgpvcoQi Tojc: ConsrLm-tion Drm%in�p Oxim-nt Nuril)er: 6 Ccrcuf-ent Cri,,( gI inat.-,-Al: GG"27/2012 'vViat road rrktei-ial is anticipated fcr ---ccess to the Phase 2 bailer buildi I -q? Re Cs- I - (" -,e fi,-,.r road fmterials for access arid the errerc�eficv a,r -,v r oad. ,?,1✓:PlxiteDhsi-j swcll iefr"Ges/7202eI aoas. arx'.1 C4 tof exa-m.k-f. Ensure, thiat all are RESPONSE: Phasing has been revised and coordinated. Note the bailer building is now in phase 4 and the access and emergency access road are part of phase 2. VVe added a note that &Oains that the phase 4 cannot be constructed until the paved industrial yard area in phase 2 is constructed. 0- -er;t Gr;, 0 -1 CiC 1,11; F! 6"J "13, C '13 l 'I�t .1 ee'. A C3 - Acid stre�el cut note. Itc, this s; RESPONSE: Revised accordingly CL-4Tment Minter: 14 C 2(11112 08�,C,",2,�G i Z S'e--t C5 - Nbre informat'jon is (need,-7,d fcr grading design i e i sk-x-)es, 1 I.Z :R� ;A Corm-,ent Nunter. 15 C c m. -, I -er t a, g irlate- d: C,,-',, C�a!2 012 0&:C,&"2rC) 12: Tracisfer phasing notes from s—epece-le pbasing plan to a P %i i -xg - I I 1sheet in the utility puns. RESPONSE: Revised accordingly. ("'n-ent NuAr: 16 rarrrrent (-Aioineiiedi C, 06i2r'12 C&C61,20121, J"ne develcorrent cgreement will reed to Le, revi,>c� and re-rrded in crdei t.13 i includle fle a0jiticcal area Leincg F.&Jed with this prcJecl. zgngwklgj't • �••-• Topic, Plat Ccm-rmit NurTber: _4 03/27i,'012 j kii ZY? 2. w u on th plan Ld, h�: not L-&--r ,,! 'd tr t'r 0 - k SN, 's . t J "li-cl , -) Fie, dj T. Plea,e P-drl to th plat- 06/27,12D12. Verify vkh Poudre Fire thalf, the enrerrgenq axess e, isn5t r� uii-ed to F-e e:�tei,lded to the for tuildincs 2 & 3. RESPONSE: This was revised prior to hearing. See revised Oat sheet. / c.errent is novi shO I i Tl`,,Z-3; 4191' drlainage, I ao�� S eL:.,L "'3 rt-::I" j,�� j3n� �11 as T 1-3 e��seme, zl;, L'J p c 45 .- to ff),e e� for tne, pa�rjn,'rj ic"L apndl CC, Ic-Ae "ab Cf`27 '2012: 5' Dr. ji-ag6, )(11 i s --an -tcf on 'he sd- ir the prcjet is r ct src.fir c�n tih� Ell,! t_xJl,-Jr1't t1 �F4 n-li i for thle. ajjac,_j­,' RESPONSE: This was revised prior to hearing. See revised Oat sheet. ✓ t j , j "t is t­�,—)�,�,sjc ' i�J ��l i iA, '­1 is t ()i anc I 5r,,4DCificali I y it 11'.61 area Onef-e i I iS outsi'de- of tjhe or c,-rly L-,4,_x, 6­,daly at I C, rP, i j &'ISr I 1-: 111 dedi calte,I o'n Inn cx, k-1 j nal P1 at I S f i 13 JI a 1 t I �S �S: � L 11 - rf 11 1 t! 114� t ­u vau4 e� j hv t is la". t Qv t(J --Js pig' simi! af to ,, al A c 4A -Ind dt�dicat,�d b ih t, ov�,Z; (Acce ( a !egend of vJ)at is being v�x,-_ (_ _ i i ,al ? S.i cri lairk i the ­ff sire t- - ')C cf-, 'J, piz-:j! ccu!d be ary ccr,.�,v ucti�:.n ea�er,­& L ie A xi v s 1��Ar �,miti i a � ia tj to cl eaf 1 v st x.-)w vhat pert i ons Fire L"Ar -aca-ted Oy thiS pia RESPONSE: This vies revised prior to hearing. See revised plat sheet. ✓ 2 Departrm-,O: Forestry Cot -tact: limButchman, 970-2211-63b1, Topic: Landscape Pians Cctmy,,nt Nurrixf: 1 06/27/2912: sy x", i-e of the tr atthieN%Nrx'� :(--A,, of tie sidevyet of the � itrxoe are cuitedose toge le '-� it 11 Tl-jis ocrours oi'h t e Street trees ard tt, tre�.- behin�l the \,malk. Pcsiticr,'N tna—­' in ba-.V, of dhe 'ov s in thi, area-c cudd irrpe the all marrental tree s andusi� '--'I;nci--- tr4e try bei-drd the in tl­iq -,irea are quite di,,xe r"') the sid-eviak LIST all Oha,nudie--r Pear in thds are�j -WH help in ri-aintaining grcvth over t le side,�'ralk, at 8 fee-t Also xross tf e frcct of the site b-tMe&, Curb Cuts pl�-YJ!,"q the n i e, njvof trie in t.,% of the In" rove sr)jtI. xl- Mdi! 0r (�"rah 't' ii,'i area. _.`tent vJth fi- e, ex;str,,':4 raAj Of Th S il "' e the w ,. 'de 04C ci frorit of vie tioo, iing v,�,,ere are p) are--] t* i,�- ilia 1pk -id Linden) iar in plan[r t S i' pro',!es and ri aif ief , -t C, pjttii q a shlrub b=--d on the side of the fe-, Ice in froct of ti le bukli 1 uLi are sIn":,'"mi in the lafl%1I afLc-i RESPONSE: Revised accordingly. Please see the revised landsape plan. CoiTment Nurrr: 2 add, tj";Eire not ,_. i; -drin' sp .-iv iir",i"Ic'-� 'U'Oc T I :a' 1�­ , - J,V �j � 'j" "�:'i �'I A % J-1 0 271 2012 or irlp 0, --lual tree basin for nd,'­ RESPONSE: See landscape notes 3,19, and 20 Mich address these axmwAs. DepartrTient: Light And Pavwr Contact: Rob Irish, 0-70-224-6167, riris� ♦ •A Topic: General Con-rnent Nunixr: 1 Cb--went Orignated: 06/26i2012 063/26i201 2: -Square footage and front foctajec-har,,j:e� W 11 apply to t1he. ne.�jly aquifed eK]i xent parc�el Con rent Nunl)er: 2 Conr-e-ntOriginat-ed: 06126V2012 03/22(�20,12. aner is responsibiefcr unpaid develcpffent charges on the eAsfirg d�-veloprnelt. Q.)iwent NWA)er: 3 C,on-iY-ent aijnateed, CC/ 26;2(j'12 C(�/2(�V'-A)] 2-, VMII the existing electric transfonTa need to be rc�rxated? If so, contact I fight & M Po,ier Engineering (221-6,70-1) to diSCUSS Sr�n'--.-rn Modl�cation antl rellcy-at:on d)arges RESPONSE: The eAsting transformer won't need to be relocated. Acknowledged. Departnient: StortTwvt-ter Engineering C�xAact: Glen Schlueter, 970-2224-6065, c 11luete , o corn Topic: General Cci-m,n-i Nun-i)er: 7. The laixkscapina and ror*',d ccullatwatiot,, dces rcf riv&et thedr:4enliq,.i pcnd Pats. Rajvever Ot Ith -cnd is in th--- rear of �q requirea 0 k,� F tr,e site ar.d` al�o behind ex;sfina Wsin 31':+�g the fendrr, (--,f the L orld ate", �I;e Lise a--, a scrap rretal bt;, r, -i,-ist be noted itl t�le RESPONSE: A variance has been added to the drainage report. Carr t-went Nivyi-)er: A. 1he,--,r;rc4p n-eta-1 bd(-)q stcxed in tilt; pond, 'This cculd vkh a foretay ancl/Of boret enfilon area uv�4rearn of, the out!etstructrUe Basil, K-andar,(�,F)224- )30 discuss the method(s) \j(,,u prop)se to use 13)ie the subrritt-al This need1St,-.)1,-x--, op 1'.ti plan set.. and sized in the draii lage rep(.P, anill r t' e ulHi RESPONSE: A sand filter system has been added to the drainage plan and design information has been documented in the drainage report. 4 Department: Stormwater Engineering Contact: Glen Schlueter, 970-224-6065, gschlueterna.fcgov.com 1. This project is located within the Poudre River 500-year floodplain and Protected by Levee (shaded Zone X). A Flood Risk Map showing the property and the FEMA floodplain is attached. RESPONSE: Acknowledged. 2. Chapter 10 of City Code prohibits the construction of critical facilities within the 500-year floodplain. This will not be a critical facility, so there will be no floodplain permitting requirements for the development of this property. RESPONSE: Acknowledged. 3. The Floodplain Administrator for the Poudre River Floodplain is Marsha Hilmes-Robinson; 970.224.6036, mhilmesrobinson@fcgov.com. Feel free to contact Marsha if you have any questions or concerns. RESPONSE: Acknowledged. 4. The information submitted wasn't clear on what the proposed use is for the recently acquired property except a detention pond is shown on the south end of it. This may be a challenge since the topographic map shows the pond located within part of the lime pile and uphill from the rest of the site. If the material is to be removed there may be requirements for removal and disposal. Please contact Matt Zocalli at 224-6008 in the Utilities Regulatory and Governmental Affairs division. RESPONSE: Acknowledged. 5. There are several standard comments that apply which are the same as the ones that applied to the recently approved project. Starting with, since this is an addition to the existing site it is important to document the existing impervious area because drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated. RESPONSE: Acknowledged. 6. If there is an increase in impervious area greater than 1000 square feet, additional onsite detention is required with a 2 year historic release rate for water quantity. In the Dry Creek basin the two year historic release rate is 0.2 cfs/acre. RESPONSE: Acknowledged. 7. Water quality treatment for any increase in impervious area is also required as described in the Urban Storm Drainage Criteria Manual, Volume 3 - Best Management Practices (BMPs). (hftp://www.udfcd.org/downloads/down_ critmanual_vollll.htm) Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. RESPONSE: Acknowledged. 8. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for ann-n-entCriginated: 08iTIV21012 08/10/2012: Roodplain corTy-i-ent: Please add the U.!,,A,�hyj note to the Drainage and Erosion Control Ran (Sheet C6)-1 a. Life, Safety and Emergency Response &jtical facilities are prohlb"e.1 Vm . thin the Poudre Rvenr 13500-year Floodplan. Z*VW9,141 a 0 11K Topic: Erosion Control Comet NUmber: 2 Con-rrent D-iginated: 06/27/2012 06/27/2012: Please see, the Erosion Control aiecklist U, requiren-ents nee�-la-1 on the Utility PI --4ns and in the Drainage Rep. -A 1 1 11"071 Topic: General CorrTrent Nurser: 1 Com-nent Criginate:d: 03,127/201 C6/27/201 2: The detention pond needs to be designed to the Detention Pond Landscape Standards, Additional landscriping is needed. Pk--asea-)ordi.,-,-ate this re-quirerlyant Wth Storn-�i%ote,r staff RESPONSE: Gen Schlueter's axnT-ent 7 above states that a variance request for this standard would be supported. Please see the attached variance request subrrifted by Apex Engineering. Conrrmnt Mnter: 5 0,,,ainiat--A' 06/29i- 12 ?,�� � I f (Y:,/29/' 12: Rleaspd�r,&hoin� de'V'ji! t!"--rrr-,r the pat� thesse L-7;ke to U icrCAI, Ave A 4h In --t e,,'st RESPONSE: The flow path is not at the outlet structure it is on the east side of the pond and will flow into the eAsting detention pond to the east. Ux-nment Nunber: 6 (.Iiscussion in rp,-�evj rneetir� is au;eptabl& Department: Technical Services Contact: Jeff County, 970-221-6W, Topic: Fkjilding Elevations 5 Coi-,ir-Firtaiginated: 0 Z2012 W; MUM W-062012 This has not been addressed. 2-,d should be cut and tt,,e title sf�culd match the subdivision plat. ad Sec 06/23/2012: Pease change the project title on al; sheets to"Color , o Iron & Metal ond Filing". RESPONSE: The building elevations have been revised accordingly. Topic: Construction Drawings Corm-ent (-)iginat---,(± C62N2012 conTreint Number: 28 O&OK012: Ple-ese take the caw-ei out Let "Wtal" and "Second". C6/23,'2012: Pease change the pi-ciect title on all sits to "Colorado Iron & Metal Second F i I i t xg ". RESPONSE: Revised accordingly. Comirrient Number:C 29 awj-ient0riqinated 06/232012 08/0812012: The legal 011 need to be changed. Rea -se n-atch the legal on the subdivision Oit, 06/2S2012: Pleacse change the iecal to ryatch thes Subdivisicx-) Rai bein-0 fille-cl. RESPCNSE:Re,Ased accordingly. Corrn-ent NUnivir: 30 Czn-ii-ent Oriainated: OCVZ!2012 O&W-V2012: This has not been address -&-I 06,230 12: The sheet description for C,j,I in the- cover sheet index doesn't n-otch the description shoj�,n on sheet C1 1 RESPONSE: Revised accordingly. Cxxi-tir,nit Number: 31 C,)rTyyf�nt(j-ignclledlD,33/23,20112 CAon On G"Gity of F v .V2� 12 Benchrrerk B4D2 needs to haVe t! E See r-,A-lines T�23/Z)12 RESPONSE: Revised accordingly. CfjUm-f,4-,t Nurr&er: 32 Cli06/2--.1/2012 08/08/2012- Sere cowmient#:,31. nnarneo)d. %2S-2012: Pease correct the tenchrrerg', s%ysti��- e,et C2, RESPONSE: Revised accordingly. CornTerd Number: 33 Conir e,.tC)riginaed, 06/23,22012 X 0&W2012 There are still line over text issues on sheet CO, 06/23V2012: There are line over text issues on sheets C7, C8 & C9, zo-no iskm=z - �� Topic: General Cornna Number: 24 Cowent Originated: 06/23/2012 06,'018/2012: This has not been addressed. 2nd should be smelled out to match the SuLdivision plat. M23012: Please change the prcj�. title can the Phasing Plan sheet to"Cdcfado Iron & tvbtal Second Filing". Cotmwd Number: 26 Corr Trent Criginated: OC32312201 2 08/0&2012: This has not been adldressed2,nd should be spelled out and the title should match the subdivision plat. 06/23/2012: Please change the prc)j,--,4,-t title on the Fencing Plan sheet to "Colorado Iron & Nt-tal S nd Filing". RESPONSE: Revised Accordingly. Please, see revisions. Conent Number: 27 C0lTTT-&)t Originated: 0612312012 08/08/2012- There is still text that needs to he larger. 06,123/2KA2 Please ina-euse the text s-Zes on the sheet 6 Fen.cinq Ran, RESPONSE: Revised accordingly. Please see revisions. Coientt Nuatw: 35 Cco-wemO-iginaed: Ck3 Tj&`2012 RESPONSE: Revised accordingly. Please see revisions. Tofk: Landscape Plans Con "tit Nunber: 20 Con-n-ent' Originated: 06,22/20112 0805/2012: This has not been cxlclre-5sad 2ni'1 should t)e sr Merl out and the title should n-etch the subdivision`; plat, 0G'22/2fJ1 2. Please changsa the pi-ple-_1 tiflie on all shee-ts to "Colarado Iron & I'A'Aal Seco. nd Filing". Corynent Number- 21 Con-iTL-nt Originated: 06/2a"2012 08/0&2012: There is still text that needs to h larger. 7 0623/20112 Please increase the text sizes on sheet 3 r Topic: UglAing Plan Corment Originated: C6/2 j42012 Corrtmnt Number: 23 C&CO2M 2, This has riot been addressed. 2nd should be spelled of andthetitle should match the subdivision plat. 06/23/2012- Please change the project title on all sheets to "Colorado Iron & Metal S---culd RirKf, TONST17-31 ", Pffs ".6-OF-Irs- I WOME Commnit Numix-r: 1 08/07/12012: The after boundary closes- C)CV2212012-. The outer boundary closes. C;orrrmnt Nurri)er: 2 Con-rient 0-iginate-c-11: 06/22/2012 Cc4-mierit Originated: W222012 M07/21012: This has not beer a.Jdresc-�:d. 06/2'-X20,12: Please add reference to Lot 23 of Nkyth Lernay Subdivisico Second Riling in the sub -title. See redlines. RESPONSE This ms revised prior to hearing. See revised plat sheet. Conm,nt Number. 3 06/22.�Z.02 009,2012, This has not been Cr-,/22,2012: --lberets—cerris to be a tyFy) 1he 1OV:i! rd RESPONSE: This was revised prior to hearing. See revised plat sheet. Cxmrert Nurrfw: 4 06V,,?2j2012 06122/2012 AVe, any of the as "dex.licated by rec. no." d Micatexj t- an ort t RESPONSE. The only easement that falls into this category is the slope and construction easement to the vI Mich has now been filled in with the appropriate reception nunter. Grit Number: 5 CaTrnefit Originated 00/22j2012 ()&0912012i This has riot been addressed. signature block, 06/22/2012 Are there any lienholders? If so, please add the 0 RESPONSE: This was revised prior to hearing. See revised plat sheet. Co m-ent Criginated: 06/22/2012 the Nle-�v Belgium Bre�j on flh.e C&07/2.01 2: This has riot addr essed. Please show n n-1h siale of Bucltingharn Street. ODplatted. 22/2012&- R�se label ail adjoining properties, platted or un RESPONSE: This was revised prior to hearing. See revised plat sheet. Corrrnerft Nurrk;er: 10 Co-. rrent C�riginated- 06i2212012 08109122012: This has not been addressed. 06/222012: Reese provide the reception numt�er for the 25 Drainage Easen-ent at the with end of the property. RESPONSE: The City of Fort Collins is a party to this eaSernent, so they WII be recording this easement as part of the approval of this project. The reception number is not known until that happens. OD-22012 0 'i'090-12: This h&q not been addressed. M222/20012: Please provide the reception nuffber for the 39 Term rary Construction Ez-seweit aloes the �A&---t side of the pro p--fty. RESPONSE: This reception nufter has now been filled in with the appropriate reception number. Seethe revised plat. Ca-mm,rit Nunber: 15 (%)n-rr)eqt Origin�:-AcA C)&2'-,,,,2(-j12 0&07/20-12: T�is has Lkx,111 ;-7dldressed, but a reference to note �L' is needed L'E�k:�,jv the S-.,ec4 nan'& 'ow fhe right Cif "",gay of Bjckirvhln-'! Street ")/C�'s dd:i 'at-d, RESPONSE: This was revised prior to hearing. see revised Oat sheet. Cc4Tn-c-,rA Muaivr: 36 CrxTi-ren' Cuginaied: '0M0/2'0-1'2 ()810920, 12- The bc-f.-,,is of bearings in th<-- legal deg,',riPtion de ri t notch the basis of bearingS st -atei vo-it. RESPONSE: This was revised prior to hearing. See revised plat sheet. (,'myrent Number: 37 Domin-ent Originated: 03a09/2011 "e" M09/201 2: Is the access for an adjoining lot, in the 45 drainage & access easement to be vacated? If so, it cannot be vested without consent from the Aciner. RESPONSE This was revised prior to hearing. See revised plat sheet where this 9 easement is now show again and is not proposed to be vacated. C4nTrr-nt Number: 33 Corrin-ent aginated-1 0&091'2012 08/09/2012: There is an existing drainage easement (per Vanv&Ps Subdivision 2nd Filing) along the east side of the property. Please sf-ohn this on the plat. RESPONSE: This was revised prior to hearing. See revised plat sheet where this easement is now sham. Topic: Site, Flan Cis Tm-nt Number: 17 CorrTT�e-ntaginated M22/2012 C,-&07/2)12: -l"his has not been addressed. 2nd should be spellend out and the title shia.ild n-atch th,3 SULAIJSiOrl plat. Ck)1222M2- Please change the pro ect title or, all sheets to "Colorado Iron & Nbtal fond Plil1q, "I RESPONSE: Revised accordingly. Please see revisions. Coramt-A Nurybvr, 13 Con irect Originated: OG22/2012 C)P,,'C&2012-. The legal still doesn't rnatch the plat. %22/2012 Please change the legal description to match the Subdivision Plat beii-g filed. xww=-Z -, F--. =L.-. 0 M yj C1 'M21i12: T111,ere is sti?l text that needs to be larger. CX52Z2012: PI e increase the text sizes on sheet 2. RESPONSE: Revised accordingly. Please see revisions. Cbrirt-ent RESPONSE: Revised accordingly. Please see revisions. DermrtiTent: Zoning Contact: Noah Beals, 970-416-r3'13, LiLm-A]'j�goy.qrxn WHEN=, Ce1252012: Is building 2 to he cxxistructe-d Under phase 2? \M,at is phas.e 1 irrprovea�ts tied to? 10 Cor-ire.nt Originla�ed: 0&22�20'12 L I a) 12 Corwent Oiginated: 0(-3W2,5/'201 2 there needs to be a r',Ote that all interim conditions vvill be completed during phase 1 A note needs to be added that if the phases are not coWleted within five years of approval Of the Final Devckprmnt Plan that thoSp_ not ocxTieted will need to be re-vieved by minor an-endi-rent to brirg the site into complianceWL�Ithe current code of the future tine. Wes on the landscaping plan aboLt the timingofivy-proverwts of the detention plan contradict the phasing. plan. Ren-ove these notes from the landscaping plan and incorporate them into the phasing plan. RESPONSE: Revised accordingly. Please see revisions to the phasing plan. Coment Originated: 08107/2012 OP)OT2012: A note needs to be added that if the phases are not con-pleted Wtl in five years of approval of the Final D&jellopment Plan that those not OD(Tpleted WH need to be raAeI,%ed by n-inor aa-endwerlt to bring the site into (mpliance Wth the current code of ti re future firre. RESPONSE: Revised accordingly. Please see revisions to the phasing plan. C-m-ment Number: 5 Con-p,ent ajgjnat-adW07/2012 Ce/oj7,12012 Ec- sure to include the iightir-K-1 plan, elevations and other plans ttrat verenct inClUded in this last subi-nittal with final submittal, RESPONSE: Vye are including all sheets in the electronic final submittal. 11 existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area or a minimum amount in accordance with the Fort Collins Stormwater Design Criteria. RESPONSE: Acknowledged. 9. The design of this site must conform to the drainage basin design of the Dry Creek Master Drainage Plan as well the City's Stormwater Design Criteria and Construction standards. RESPONSE: Acknowledged. 10. The drainage report can be a new study or an addendum to the original study just approved. It probably makes sense to have it as a stand alone new study. RESPONSE: We have submitted a stand along new study. Department: Fire Authority Contact: Ron Gonzales, 970.221.6635, rr onzales(D-poudre-fire.org 1. 1. The Poudre Fire Authority has no comments to make upon this acquisition of land; however, PFA reserves the right for comments when a structure is proposed to be placed upon this land. RESPONSE: Acknowledged. Department: Environmental Planning Contact: Lindsay Ex, 970-224.6143, lex D-fcgov.com 1. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3), requires that you use native plants and grasses in your landscaping or re -landscaping and reduce bluegrass lawns as much as possible. Reveille Bluegrass is one option for having bluegrass lawns and using less water. RESPONSE: Acknowledged. Department: Engineering Development Review Contact: Andrew Gingerich, 970.221-6603, aginyerich .fcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have any questions. RESPONSE: Acknowledged. 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php RESPONSE: Acknowledged. 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. RESPONSE: Acknowledged. 4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping meeting and determine if a traffic study is needed for this project. In addition, please contact Transportation Planning for their requirements as well. RESPONSE: Acknowledged. 5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm RESPONSE: Acknowledged. 6. This project is responsible for dedicating any right-of-way and easements that are necessary for this project. Additional right of way will be required along the frontage of Buckingham Street. Buckingham Street is considered a 2-lane collector minor and requires 76 feet of right of way. Additional easements may be required based upon revised building, utility and detention pond locations. RESPONSE: See plat. 7. Roadway improvements will need to be extended from the previous plan across the new proposed frontage and the corresponding length added to the offsite improvements design of the existing plans. RESPONSE: Acknowledged. 8. Utility plans will be required and a Development Agreement will be recorded once the project is finalized. RESPONSE: Acknowledged. 9. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. RESPONSE: Acknowledged. Department: Electric Engineering Contact: Justin Fields, 970-224.6150, Jfields@fcgov.com 1. The owner is responsible for any unpaid electric development charges on the new parcel. RESPONSE: Acknowledged. Current Planning Contact: Seth Lorson, 970-224.6189, slorson fcgov.com 1. The proposed development project is subject to a Type 1 review and public hearing, the decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid potential hiccups that may occur later in the review process. RESPONSE: We have decided not to have a neighborhood meeting. 2. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. RESPONSE: Acknowledged. 3. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. RESPONSE: Acknowledged. 4. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. RESPONSE: Acknowledged. 5. Please see the Submittal Requirements and Checklist at: hftp://www.fcgov.com/developmentreview/applications.php. RESPONSE: Acknowledged. 6. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. RESPONSE: Acknowledged. 7. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. RESPONSE: Acknowledged. City of F6rt Coltins June 27, 2012 Troy Jones MTA Planning & Architecture 108 Rutgers Ave. Fort Collins, CO 80525 RE: Colorado Iron & Metal Bpansion (Replat), FDP120002, Round Number 1 C011"MityDevelopment and Neighbortiood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov cwYcbmVc[xn^rrtrewew Please see the fdlowing summary of corrrnents from Oty staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any corrrnents, you may contact the individual c om-nenter or direct your questions through the Project Ranner, Seth L_orson, at or slorson@fcgov.com. Comment Summary: Department: • r. wt: Sethl-orson,• • CcEw• • w• Topic: Building Bevations ConTrlent Number 2 Comment Originated: 06/26/2012 06/26/2012: Rease provide odor elevations to confirm corrpliance with Sec. 4.28(E)(2)(c). Topic: General C iTylent Number: 1 Cormient Originated: 06/26/2012 06/26/2012: The proposed recycling and light industrial uses are pemitted in the industrial zone district subject to an administrative hearing (Type 1). Comment Number: 9 Comment Originated: 06/26/2012 06/26/2012: Digital copy of plans required. Topic: Landscape Plans Corr mm t Number: 3 Corrrrient Originated: 06/26/2012 06/26/2012: Rease provide interior and exterior parking lot landscape calculations according to Sec. 3.2. 1 (D)(1)(a), 3.2.2(4(1), and Figure 1 at 3.2.1(P. Also, what is the hashed area that the trees are planted in? Comment Number: 5 Corrrnent Originated: 06/26/2012 06/26/2012: Rease provide an irrigation plan with identified hydmzones as per Sec. 3.2.1(J) and 3.2. 1 (Q(3)(b). Topic: Lighting Plan Topic: Lighting Plan Comrnent Number: 6 Cormrent Originated: 06/26/2012 06/26/2012: The lighting plan shoes a fixture "C' but does not provide a cut sheet. Rease provide details for fixture "C'. Colmxnt Number: 7 Comment Originated: 06/26/2012 06/26/2012: Fixture A does not meet the "sharp cutoff capability so as to minimize up -light" as required in Sec. 3.2.4(D)(3). Corer lent Number: 8 CArrrnent Originated: 06/26/2012 06/26/2012: Light bleeds beyond the north property line at a higher level of foot candle than permitted, per Sec. 3.2.4(D)(8). Topic: Site Plan Corrrnent Number: 4 Corrrnent Originated: 06/26/2012 06/26/2012: Rease provide better details of fencing and gates: odor and material. Corrrrient Number: 10 Carment Originated: 06/26/2012 06/26/2012: The 10' fence along the west property line must be reduced to 4' between gate #4 and the front property line, per Sec. 3.8.11(C)(2). You may want to consider using the 30' decorative fencing for this portion of the fence. Department: Engineering Development Review Topic: Construction Drawings Comment Number: 1 ConTient Originated: 06/27/2012 06/27/2012: Rease provide a dearer "sharper" key map that is easier to read and can be reproduced. Corrrnent Originated: 06/27/2012 06/27/2012: Sheet C1- Revise the legal description on the cover sheet 1 to match the plat or vice a versa. Comment Number: 3 Comment Originated: 06/27/2012 06/27/2012: Sheet C3 - Label adjacent lot ownership on similar to what was done on sheet C4. Comn nt Number: 5 Comment Originated: 06/27/2012 06/27/2012: Sheet C3 - Their was a proposed fire hydrant callout on the previous plans located along Buckinghamjust west of the east access. This callout appears to be missing from these Paris. Has the fire protection been revisited? ✓ o (-__ C TrYie rt Number: 6 Comment Originated: 06/27/2012 06/27/2012: Please revisit the phasing shown on all sheets. Their are some discrepancies between C3 and C4 for example. Ensure that all are consistent. Comrrl@rit Number: 9 Cormient Originated: 06/27/2012 06/27/2012: Sheet C7 & C8 - Consider removing overall Buckingham street plan station callout title and instead list the stationing under the "prelimnay' and "frontage" callouts. Department: Engineering Developrnent Review Contact: ArxlrewGingerich, 970-2214603, agingerich@fcgov.cam Topic: Construction Drawings Comment Nlunber. 10 Corrrnent Originated: 06/27/2012 06/27/2012: Sheet C9 - Ensure that stationing of Cross Sections match the profile stations. Topic: General Comment Number. 8 Comment Originated: 06/27/2012 06/27/2012: Buckingham was resurfaoed in 2011. Any cuts in the pavement maybe subJect to triple impact fees. Topic: Plat Comment Number: 4 Comment Originated: 06/27/2012 06/27/2012: Verify with Poudre Fire that the emergency access easement isn't required to be extended to the west for buildings 2 & 3. Comment Number: 7 ConTrent Criginated: 06/27/2012 06/27/2012: The temporary construction and slope easements are not proms through the City of Fort Collins. However, they will need to be recorded and copies provided to Engineering prior to signing mylars. Comment Number: 11 Comrnent Originated: 06/27/2012 06/27/2012: The 45 Drainage and access easement on the east side of the project is not sham on the replat. Shouldn't this access still remain for the adjacent lot? Cormxnt Number: 12 Comment Originated: 06/27/2012 06/27/2012: The drainage easement dedicated on the original plat is no longer being shown and it is assumed that it is being vacated by this plat. Is it possible to show a legend of what is being vacated and dedicated by this plat similar to what was done on the original? Similarly, the offsite temporary oonstruction easement on the original plat could be shown with a hatch to dearly show what portions are being vacated by this plat. Department: Environmental Planning Contact: Lindsay Ex, 970-224.6143, le)oMcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 06/26/2012 06/26/2012: Please provide the specifications for the non -turf seed nix. Corrrrertt Number: 2 Cormient Originated: 06/26/2012 06/26/2012: Please remove smooth brome from the turf seed nix - this species is not encouraged to be planted in the City. Department: Light And Power Contact: Rob Irish, 970-224-6167, drishMcgov.com Topic: General Department: Light And Power Contact: Rob Irish, 970-224-6167, drish(a1cgov.com Topic: General Comrnent Number. 1 Comment Originated: 06/26/2012 06/26/2012: Square footage and front footage charges will apply to the newly aqui red adjacent parcel. Comment Number: 2 Comment Originated: 06/26/2012 06/26/2012: Owner is responsible for unpaid development charges on the e)asting development. Comment Number: 3 Comment Criginated: 06/26/2012 06/26/2012: VWII the e)asting electric transformer need to be relocated? If so, contact Light & Power Engineering (221-6700) to discuss system modification and relocation charges. Department: Park Planning Contact: Craig Foreman, 970-221-6618, cforemar cMcwv.cam Topic: General Conrut Number. 1 Comment Originated: 06/08/2012 06/08/2012: No comments Department: Stomuder Engineering Contact: Was Lamarque, 970-416.2418, wlamwxm( fcwv.com Topic: Erosion Control Comment Number: 2 Comment Originated: 06/27/2012 06/27/2012: Rease see the Erosion Control ChecMist for requirements needed on the Utility Rans and in the Drainage Fbport. Topic: General C wnment Number: 1 Comment Originated: 06/27/2012 06/27/2012: The detention pond needs to be designed to the Detention PondLandscape Standards. Additional landscaping is needed. Comrnent Number: 3 Comment Originated: 06/27/2012 06/27/2012: The outfall storm sewer is not entirely located within the off -site drainage easement. The storm sewer needs to be located in the center of a 20 foot easement. Co Truer Number: 4 Comment Originated: 06/27/2012 06/27/2012: The connection of the outfall storm sewer and the eAsting pipe needs to be discussed. The pipe can not connect into a metal culvert. Department: Technical Services Contact: Jeff County, 970-221-M, jcounty a[cgnv.corn Topic: Building Elevations