DATE: July 23, 2012
PROJECT
COMMENT
SHEET
TO: Stormwater Utility
�
PROJECT PLANNER: Jason Holland
PDP120021 Maldonado Syision
(412 N. Whitcomb St��;f�D -Type
Please return all comments to the project planner no later than
the staff review meeting:
August 8, 2012
Note -Please identify your redlines for future
reference
❑ No Problems-�
Problems or Concerns (see below, attached, or ACCELA)
i
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
*Plat Site Drainage Report _Other
Utility _Redline Utility _Landscape
or new construction located in the Eastside and Westside Neighborhoods (roughly, north of Prospect,
and between Taft and Lemay). The owner selects from the Design Assistance Program Consultant's
Master List, and the design must meet -the requirements of the city's building codes. This assistance is
available to anyone, regardless of the building's age or eligibility for designation.
Response:#1 Not applicable. Photos done. Acknowledged.
Department: Environmental Planning
Contact: Lindsay Ex, 970.224.6143, lex anfcgov.com
1. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4)
protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree
having DBH (Diameter at Breast Height) of six inches or more. If any trees on site have a DBH of greater
than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221-6361) to
determine the status of the existing trees and any mitigation requirements as the result of development
impacts.
2. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3),
requires that you use native plants and grasses in your landscaping or re -landscaping and reduce
bluegrass lawns as much as possible.
Response: Acknowledged
Department: Engineering Development Review
Contact: Andrew Gingerich, 970.221.6603, aaingerich _fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit.
Please contact Matt Baker at 224-6108 if you have any questions.
2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional
information on these fees, please see: http://www.fcgov.bom/engineering/dev-review.php
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks,
curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced
or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of
completed improvements and/or prior to the issuance of the first Certificate of Occupancy.
4. Any public improvements must be designed and built in accordance with the Larimer County Urban Area
Street Standards (LCUASS). They are available online at:
http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
5. This project is responsible for dedicating any right-of-way and easements that are necessary for this
project.
6. A Development Agreement is required and will be recorded once the project is finalized with recordation
costs paid for by the applicant.
7. Access will need to be granted to both property owners if a driveway is to be shared and the driveway is
not wide enough on each individual property for each owner to access on their property. For example,
options A and C will both require access easements. Option B allows access to each lot without
requiring access easements.
8. A drive approach permit may be required depending on the improvements, widening, and aligning of the
proposed driveway. This permit has been included with this letter and if you have any questions please
call Engineering Inspections (970) 221-6605.
9. Sidewalk width is 4.5' wide minimum for local street cross section. Verify if the sidewalk is actually 4 feet
in width as shown on the sketches? The sidewalk will need to meet the minimum width standard.
Response: Yes, sidewalk is 4 ft. Acknowledged
Department: Electric Engineering
Contact: Justin Fields, 970-224.6150, 'fields@fcgov.com
Department: Electric Engineering
Contact: Justin Fields, 970.224.6150, ifields(a)-fcgov.com
1. Electric development and system modification charges will apply. Contact Light and Power Engineering
(970) 221-6700 for an estimate of these charges.
2. Utility easements may need to be granted depending on the location of the existing service to 412 N
Whitcomb and how service will be routed to the new lot.
3. The new meter location needs to be coordinated with Light and Power Engineering.
Response: Acknowledged
Current Planning
Contact: Jason Holland, 970.556.3176, jholland �fcgov.com
1. LUC 3.2.2(K) One parking space is required on each lot. Plan concepts A and B would meet this
requirement; Plan C would not meet the requirement. For the driveway layout, Plan B appears to be the
most desirable, however please consider adding a traditional planting strip along the center of the
driveway.
2. The proposed development project is subject to a Type 1 review and public hearing, the decision maker
for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is
not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to
notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and
location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid
potential hiccups that may occur later in the review process.
3. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color
coded flowchart with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
4. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code
(LUC), including Article 3 General Development Standards. The entire LUC is available for your review on
the web at http://www.colocode.com/ftcollins/landuse/begin.htm.
5. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard
Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of
the LUC for more information on criteria to apply for a Modification of Standard.
6. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php.
7. The request will be subject to the Development Review Fee Schedule that is available in the Community
Development and Neighborhood Services office. The fees are due at the time of submittal of the required
documents for the appropriate development review process by City staff and affected outside reviewing
agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal.
8. When you are ready to submit your formal plans, please make an appointment with Community
Development and Neighborhood Services at (970)221-6750.
Response: Acknowledged
IV
Project: Maldonado Subdivision (412 N. Whitcomb St.)
Project Description: Request to subdivide and replat an existing 9,009 square foot lot into two
separate lots. Lot 1 would contain 4,497 square feet and Lot 2 would contain
4,496 square feet. An existing single family detached home is situated on the
future Lot 1. Lot 2 will be sold for future construction of a new detached single
family residence. Two Modification of Standards accompany this request: 1)
Modification to the rear setback for future garages on both lots. 2) Modification to
the lot size requirement standard.
Date: 08/10/2012 Issue ID: 1 Topic: General Round: 1 Status: Active
Issue: 08/10/2012: Since this is being processed as PDP and not just a paper exersice as a simple lot split on a plat
the standard PDP requirements will apply. The primary requirements are a grading plan and a drainage
report/letter meeting the standard requirments of the design criteria manual. They must be prepared by a
professonal engineer registered in Colorado.
Date: 08/10/2012 Issue ID: 2 Topic: General Round: 1 Status: Active
Issue: 08/10/2012: The drainage outfall for this site appears to be sheet flow runoff to the property to the east and
sheet flow to Whitcomb. The design engineer will need to verify and document the existing flow patterns. Of
particular concern on this site is the amount of runoff leaving the site and draining to the east onto other private
property. It must be shown that the proposed volume of runoff from the 100 year -two hour design storm will
be equal to or less than it is now. The building gutters and downspouts must be considered in this evaluation.
Their size and flow direction need to be shown on the plans and documented in the report.
Date: 08/10/2012 Issue ID: 3 Topic: General Round: 1 Status: Active
Issue: 08/10/2012: Onsite water quality treatment must be provided in accordance the Urban Storm Drainage Criteria
Manual, Volume 3 - Best Management Practices (BMPs).
(http://www.udfcd.org/downloads/down_critmanual_vollil.htm) Extended detention is the usual method selected
for water quality treatment; however the use of any of the BMPs is encouraged. In this case disconnection of
impervious area or raingardens are two suggested options.
Date: 08/10/2012 Issue ID: 4 Topic: General Round: 1 Status: Active
Issue: 08/10/2012: It is important to document the existing impervious area since drainage requirements and fees are
based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table
summarizing the areas is required prior to the time fees are calculated for each building permit.
Date: 08/10/2012 Issue ID: 5 Topic: General Round: 1 Status: Active
Issue: 08/10/2012: The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new
impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for
existing impervious area. These fees are to be paid at the time each building permit is issued. Information on
fees can be found on the City's web site at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or contact
Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow required before the
Development Construction permit is issued. The amount of the escrow is determined by the design engineer,
and is based on the site disturbance area or a minimum amount in accordance with the Fort Collins
Stormwater Design Criteria.
Date: 08/10/2012 Issue ID: 6 Topic: General Round: 1 Status: Active
Issue: 08/10/2012: The design of this site must conform to the drainage basin design of the Old Town Master
Drainage Plan as well the City's Stormwater Criteria Manual.
Date: 08/10/2012 Issue ID: 7 Topic: General Round: 1 Status: Active
Issue: 08/10/2012: There should be a 5 foot drainage easement along the north property line as well as the ones
shown. The drainage easement in the center of the two lots that serves as access should be the same width
Page 1 of 2
Project: Maldonado Subdivision (412 N. Whitcomb St.)
Project Description: Request to subdivide and replat an existing 9,009 square foot lot into two
separate lots. Lot 1 would contain 4,497 square feet and Lot 2 would contain
4,496 square feet. An existing single family detached home is situated on the
future Lot 1. Lot 2 will be sold for future construction of a new detached single
family residence. Two Modification of Standards accompany this request: 1)
Modification to the rear setback for future garages on both lots. 2) Modification to
the lot size requirement standard.
as the access easement; just label it access and drainage easement. No easement should be shown
anywhere you want to place buildings. If there is a need to route drainage flows along the back property line an
easement should be shown there as well. The 5 feet of drainage easement does not need to be shown as a
seperate easement on top of another easement; it too can just be labeled drainage and utility easement unless
you have a specfic reason you want it that way.
Page 1 of 2
F6rt Collins
Current
Planning
PO Box 580 * Fort Collins, CO 80522
970.221.6750 * 970.224.6134 - fax
PROJECT
COMMENT
SHEET
DATE: July 23, 2012
TO: Development Review Engineering 4(vi rAl
PROJECT PLANNER: Jason Hollands
PDP120021 Maldonado Subdivision
(412 N. Whitcomb St.) PDP - Type I
Please return all comments to the project planner no later than
the staff review meeting:
August 8, 2012
Note --Please identify your redlines for future
reference
❑ No Problems
❑ Problems or Concerns (see below, attached, or ACCELA)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other.
_Utility _Redline Utility _Landscape
City of
F6rt Collins
REVISION
Current Planning PO Box 580 COMMENT SHEET
Fort Collins, CO 80522-0580
Fax: 970-224-6134
DATE: August 31, 2012
TO: Development Review Engineering
PROJECT PLANNER: Jason Holland
PDP120021 Maldonado Subdivision
(412 S. Whitcomb St.) PDP - Type I
2nd Round of Review
PLEASE NOTE:
Please return all comments to the project planner no later than the staff
review meeting:
September 12, 2012
Note - Please identify your redlines for future reference
❑ No Problems ❑ Problems or Concerns (see below, attached, or DMS)
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site Drainage Report _Other
Utility Redline Utility _Landscape
Project: Maldonado Subdivision (412 N. VUhitoomb St.)
Project Description: Request to subdivide and replat an eAsting 9,009 square foot lot into two
separate lots. Lot 1 would contain 4,497 square feet and Lot 2 would contain
4,496 square feet. An eAsting single family detached home is situated on the
future Lot 1. Lot 2 will be sold for future constnaction of a new detached single
family residence. Two Modification of Standards accompany this request: 1)
Modification to the rear setback for future garages on both lots. 2) Modification to
the lot size requirement standard.
Date: 08/08/2012 Issue ID 1 Topic: General Round: 1 Status: Active
Issue: 08/08/2012: Please provide a gradinglutility plan with your next submittal. This should indude grading spot
elevations, slopes, etc. as well as existing utilities and proposed servioes.
Date: 08/08/2012 Issue ID: 2 Topic: General Round: 1 Status: Active
Issue: 08/08/2012: Add note to grading/utility plan that if sidevalk is need of replacement prior to construction or is
replaced during construction that it should be replaced with 4.6 width sidewalk
Date: 08/08/2012 Issue ID 3 Topic: Plat Round: 1 Status: Active
Issue: 08/08/2012: Label the right of way width along VVhitcorrb
Date: 08/08/2012 Issue IG 4 Topic: Plat Round: 1 Status: Active
Issue: 08/08/2012: The seperate site exhibit shamed the proposed home being 5 from the south property line. The
Oat shows a 10' utility easement in this area. The building can not be constructed on top of the utility
easement.
Date: 08/08/2012 Issue ID 5 Topic: Plat Round: 1 Status: Active
Issue: 08/0812012: The proposed garage will not be able to be constructed on top of the drainage easement that is
shmw on the plat.
5' w ;— P•� -mot L.� —� 1 C,-
Ate- l C4) c5 t
Page 1 of 1
412 N. Whitcomb
Comment Responses
Please see the following summary of comments regarding the project request referenced above. The
comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be made at the
time of formal review of this project. If you have any questions regarding these comments or the next steps in
the review process, you may contact the individual commenter or direct your questions through the Project
Planner, Jason Holland, at 970-556-3176 orjholland@fcgov.com.
Comment Summary:
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbeals(afcgov.com
1. Land Use Code (LUC) 4.8 In the Neighborhood Conservation Medium Density District (NCM) single family
detached is reviewed by a basic development review. However single family detached with more than
one principal structure on one lot is a Type 1 review.
If a replat is included then the whole proposal will be a Type 1 review.
Response:
2. LUC 4.8(D)(1) Each lot is required to have at least 5,000 sq ft for each single family dwelling.
Current proposal lot size does not meet the minimum standard and will require a Modification.
Density standards also requires that the lot be at least 2 times greater than the total square footage of the
Buildings
Response:
3. LUC 4.8(D)(5) Floor Area Ratio for the rear one half of a lot is maximum of 33% square footage (note this
is not foot -print)
Response:
4. LUC 4.8(E)(1) The minimum lot width shall be 40 feet for each lot.
LUC 4.8(E)(2) The Front setback is 15 feet and 20 feet for garage doors.
LUC4.8(E)(3) The Rear setback is 15 feet from a non -alley and 5 feet from an alley.
Department: Zoning
Contact: Noah Beals, 970.416.2313, nbeals a(D.fcgov.com
LUC 4.8(E)(4) The side setback is 5feet or 15 along a Street on a corner lot.
A site plan will be required with the replat to establish the shared driveway access. In turn a Modification
will be necessary for the garage to be placed zero (0) feet from the side property line and five (5) feet
from the rear property line.
Response:
5. LUC 4.8(F) The development standards in this section do apply.
LUC 3.5.2(D) The garage standards in this section do apply.
Response: These comments are addressed with the plan submittal
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221.6854, rbuffington cDfcgov.com
1. Existing water mains and sanitary sewers in this area include an 8-inch water main and an 8-inch sewer in
Whitcomb.
2. The water and sewer services for the houses to the east (518 and 520 Cherry Street) extend from
Whitcomb east through this lot or the lot to the south (530 Cherry Street).. These services need to be
located and possibly moved if there are conflicts with the proposed house.
3. Provide an easement for the water and/or sewer services on this site that extend to the houses to the
east
4. Development fees and water rights will be due at building permit.
Response: This easement was created September 15, 1978 and already exists 10feet north of the southern
�'C
Boundary of the property line and connects from 518 Cherry St to Whitcomb St taps. c�
G
Department: Stormwater Engineering (� `a r gt_w�j eo- �5
Contact: Glen Schlueter, 970.224.6065, gschlueter _fcgov.com Iry ,Cit"t0 !/
Pt° se
1. It is important to document the existing impervious area since drainage requirements and fees are based
on new impervious area. An exhibit showing the existing and proposed impervious areas is required.
2. In the Old Town drainage basin a drainage and erosion control report and construction plans are required
if there is an increase in impervious area greater than 5000 square feet. They must be prepared by a
Professional Engineer registered in Colorado. If there is less than 5000 square feet of new impervious
area, a drainage letter should be sufficient to document the existing and proposed drainage patterns. If
there is less than 5000 but more than 350 square feet of new impervious area; a site grading and erosion
control plan is required instead of a complete construction plan set.
3. Water quality treatment is also required as described in the City's Stormwater Criteria Manual. Extended
detention is the usual method selected for water quality treatment; however the use of any of the BMPs is
encouraged. (http://www.udfcd.org/downloads/down_critmanual_vollll.htm)
4. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new impervious
area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for
existing impervious area. These fees are to be paid at the time each building permit is issued.
Information on fees can be found on the City's web site at
Department: Stormwater Engineering
Contact: Glen Schlueter, 970.224.6065, gschlueter fcgov.com
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or
contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow
required before the Development Construction permit is issued. The amount of the escrow is
determined by the design engineer, and is based on the site disturbance area or a minimum amount in
accordance with the Fort Collins Stormwater Design Criteria.
5. The design of this site must conform to the drainage basin design of the Old Town Master Drainage Plan
as well the City's Stormwater Criteria Manual.
Response: Acknowledged
Department: Historical Preservation
Contact: Josh Weinberg, 970.221.6206, jweinberg(afcgov.com
1. Any exterior changes to or demolition of buildings 50 years old or older will need to be reviewed under
the City's Demolition/Alteration Review Process, Municipal Code Section 14-72. This process begins
with a determination of eligibility, which identifies the appropriate review process(es). The determination
of eligibility requires current color photographs, of all sides of each building or structure.. Sufficient
photos should be taken to show the current condition of the building, especially any previous alterations
or additions. Digital photos are encouraged, and may be sent to jeinberg@fcgov.com or
kmcwilliams@fcgov.com. Hardcopies may be sent to P.O. Box 580, 80522; or dropped off at CDNS, 1st
Floor, 281 N. College Ave.
2. The eligibility of a property for landmark designation does not, in any way, designate the property as a
Landmark; it does define which of the various City review processes the development application would
be reviewed under. If any of the buildings or structures are found to be individually eligible for Landmark
designation, then the project would be reviewed for compliance with LUC Section 3.4.7. Section 3.4.7. is
intended to ensure that, to the maximum extent feasible: (1) historic sites, structures or objects are
preserved and incorporated into the proposed development and any undertaking that may potentially
alter the characteristics of the historic property is done in a way that does not adversely affect the integrity
of the historic property; and (2) new construction is designed to respect the historic character of the site
and any historic properties in the surrounding neighborhood.
3. Owners of properties that are eligible as landmarks may choose to have the property officially
recognized as a landmark, and then qualify for financial incentives. Financial programs include 20%
State Tax Credits, $7,500 yearly no -interest loans, $15,000 Historic Structure Assessment grants, State
Historic Fund grants of $200,000 and more, and, for income producing properties, an additional 20%
Federal Tax Credit. Any work, both interior and exterior, which protects or promotes a building's historic
character by meeting the Secretary of the Interior's Standards
(http://www.cr.nps.gov/hps/tps/standguide/index.htm) can qualify. For more details on financial
incentives, please contact Historic Preservation staff.
4. The Design Assistance Program pays for up to $2,000 each year, for the design of alterations, additions,