HomeMy WebLinkAboutFAIRVIEW ELEVENTH ELIZABETH AND CITY PARK CORNER REDEVELOPMENT - Filed CS-COMMENT SHEETS - 2014-07-17project: Bizabeth & City Park Corner Redevelopment
Project Description: This is a request to re -develop a 22,500 sq. ft. site and demolish the eAsting
4,764 sq ft building formerly occupied by Consuelds Restaurant. A new 7,300 sq.
ft. retail/mixed-use building is proposed.
Date: 04/11/2012 Issue ID 1 Topic: Traffic Impact Study Round: 1 Status: Resolved
Issue: 04/11/2012: The subtotal shown for the Coffee/Donut Shop on page 10 appears to be incorrectly entered.
Date: 04/11/2012 Issue ID 2 Topic: Reports - Soils, Subdrain Round: 1 Status: Resolved
Issue: 04/11/2012: No Comments
Date: 04/11/2012 Issue IQ 3 Topic: Site Plan Round: 1 Status: Resolved
Issue: 05107/2012: Note was added to site plan. 04111/2012: LS 1.0 - It is unclear from the site plan or building
elevation but it should be noted that no steps, extensions of railing, retaining walls, etc. may east in public
right of way.
Date: 04/11/2012 Issue ID 4 Topic: Site Plan Round: 1 Status: Active
Issue: 05/07/2012: Variance for 16 vas submitted and accepted, however revisions need to be made to first
paragraph. 04/11/2012: LS 1.0 - Per 19.6 LCUASS the parking setback based on traffic volumes requires a
506 setback from City Park flo line to the first parking stall. Engineering has a ooncem with traffic rnoverrient
in and out of the parking lot relative to the proposed 20�, setback proposed. Similar projects have requested
less of a setback than the required 506 but a variance request with justification Wll need to be submitted and
reviewed.
Date: 04/11/2012 Issue ID: 5 Topic: Site Plan Round: 1 Status: Active
Issue: 05/07/2012: Per conversation with Nike Oberlander, letter will be submitted prior to or at the staff review
meeting on 05124/2012. 04/11/2012: LS 1.0 6 The emergency acoess easement proposed e)asts on the
property to the south. This portion of the eesemient will need to have a legal description that includes only the
portion eAsting on the south property. A separate legal description will need to be prepared for the proposed
lot.
Date: 04/11/2012 Issue ID 6 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04/11/2012: Sheet 1 — Replace local Entity with Oty of Fort Cdlins in the indemnification statement.
Date: 04/11/2012 Issue ID 7 Topic Construction Drawings Round: 1 Status: Resolved
Issue: 04111/2012: Sheet 2 —The Sidewalk and Curb and Gutter along City Park Avenue is a uniform pour with no
curb heed. Removing the sidewalk will require a remove and replace of curb and gutter as well and possibly
additional street cuts to tie and for demolition.
Date: 04/11/2012 Issue ID 8 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04/11/2012: Sheet 2 —The curb heed along Elizabeth and near the e)asting handicap ramps at the corner of
City Park and Elizabeth is in need of repair. These sections of curb heed will need to be removed and replaced
as necessary.
Date: 04/11/2012 Issue IQ 9 Topic: Construction Drawings Round: 1 Status: Active
Issue: 05/07/2012: Per conversation with Nike Oberlander, letter will be submitted prior to or at staff review meeting
on 05/24/2012. 04/11/2012: Sheet 2 �, If the limits of demolition will oocur on or affect an adjacent property
owner then a temporary construction easement or agreement wrill be required. Proof of this agreement or
easement will be required prior to hearing.
Date: 04/11/2012 Issue ID 10 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04/11/2012: Sheet 2 — Show more dearly the lirrits of the e)asting driveway aooess on the north side of the
property and the proposed vertical curb on the following sheets.
Page 1 of 2
project: Elizabeth & City Park Corner Redevelopment
Project Description: This is a request to redevelop a 22,500 sq. ft. site and demolish the edsting
4,764 sq ft building formerly occupied by Consuelds Restaurant. A new 7,300 sq.
ft. retail/mixed-use building is proposed.
Date: 04/11/2012 Issue ID 11 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 05107/2012: Per resubmittal the storm drain is private and it is intended to be on the utility easement line.
04/11/2012: Sheet 3 6 Is the proposed storm sewer public or private and is it intended to be located within the
proposed 7 foot utility anent?
Date: 04/11/2012 Issue ID 12 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04/11/2012: Sheet 3 — It would be helpful to see a standalone sketch exhibit showing proposed and existing
easements, easements to be abandoned and right of way to be dedicated.
Date: 04/11/2012 Issue ID: 13 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04111/2012: Sheet 4— Handicap parking should be looted as dose to building access as possible.
Date: 04/11/2012 Issue ID 14 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04/11/2012: Sheet 4—At the corner the traffic signal pole provides a pinch point for the sidevualk Provide
additional sidewalk around the back of the signal pole to allow for better pedestrian circulation at this corner.
Additional Right of V\by may need to be dedicated at the coiner to include the additional sidewalk
Date: 04/11/2012 Issue ID 15 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04111/2012: Sheet 4 — Verify that no more than 750 square feet drains across the sidewalk and drivenray
access off of City Park Avenue.
Date: 04/11/2012 Issue ID 16 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04/11/2012: Sheet 4 — It was unclear hove the drainage and proposed contours work along the western
property line adjacent to the proposed building. Is drainage spilling onto the property to the west or draining
across the sidewalk and proposed access ramp on the northwest corner?
Date: 04/11/2012 Issue ID 17 Topic: Construction Drawings Round: 1 Status: Resolved
Issue: 04/11/2012: Sheet 4—The driveway must maintain a 2%cross slope adjacent to the proposed sidewalk on
City Park Avenue.
Page 2 of 2