Loading...
HomeMy WebLinkAboutBANNER HEALTH MEDICAL CAMPUS - Filed CS-COMMENT SHEETS - 2014-07-09DELICH ASSOCIATES Traffic & Transportation Engineering -/ i 2272 Glen Haven Drive Loveland, Colorado 80538AV - -- - - Phone: (970) 669-2061 Fax: (970) 669-5034 '7,f MEMORANDUM TO: Mark Ostrand, Banner Health Cliff Trausch, Banner Health Paul Klumb, PCK Real Estate City of Fort Collins FROM: Michael/Matt Delich DATE: July 18, 2013 SUBJECT: Banner Health Medical Campus Auxiliary Right -turn Lane Analysis (File: 1267ME02) The purpose of this memorandum is to provide an allocation analysis of the required eastbound right -turn deceleration lanes on Harmony Road approaching Lady Moon Drive and Cinquefoil Lane in Fort Collins, Colorado. The "Banner Health Medical Campus Transportation Impact Study," (TIS) was completed in May 2013. This memorandum provides a breakdown of the long range (2035) traffic volumes that contribute traffic to the eastbound right -turn deceleration lanes at the Harmony/Lady Moon and Harmony/Cinquefoil intersections based upon various developments in the area, as well as background traffic. The overall site plan for the Harmony Tech Park ODP is provided in Appendix A. The traffic volumes for the eastbound right -turn deceleration lane at the Harmony/Lady Moon intersection are attributed to three major developments within the Harmony Tech Park ODP and background traffic. The three developments are: 1) The Banner Health Medical Campus, which is on Parcels G & H of the Harmony Tech Park ODP, located in the southeast quadrant of the Harmony/Lady Moon intersection; 2) The Harmony Tech Park (HTP), which is all of the parcels west of Lady Moon Drive, between Harmony Road and Rock Creek Drive; and 3) Imago, which is on most of the parcels east of Lady Moon Drive, between Harmony Road and Rock Creek Drive, that make up the remainder of the Harmony Tech Park ODP. The background is essentially the existing traffic plus unbuilt development south of Rock Creek Drive. The traffic volumes for the eastbound right -turn deceleration lane at the Harmony/Cinquefoil intersection are attributed to three major developments and background traffic. The three developments are: 1) The Banner Health Medical Campus; 2) Imago; and 3) The Winchester Property, which is located in the southeast quadrant of the Harmony/Cinquefoil intersection. The background is traffic related to development south of Rock Creek Drive. The percentage of site generated traffic from these developments and the background traffic was calculated for both eastbound right -turn deceleration lanes at the Harmony/Lady Moon and Harmony/Cinquefoil intersections. The percentage breakdown attributable to each development is presented in Figure 1, for the respective right -turn lanes. Andrew S. Gingerich From: Andrew S. Gingerich Sent: Thursday, December 20, 2012 4:15 PM To: kevin@northernengineering.com; 'Randall Provencio' Cc (randall@northernengineering.com) (randall@northernengineering.com) Sheri Langenberger Subject: Banner Health - Cinquefoil ROW Kevin and Randall, Staff was able to meet this morning at our transportation coordination meeting and discuss the cross section and Right of Way requirements for Cinquefoil. Prior to our meeting we had not yet received any information from Matt Delich but were still able to make a determination based upon the existing portions of Cinquefoil that have been built. It was decided to keep Cinquefoil as a collector and use the right of way cross section for on street parking which requires 76' of total right of way. This cross section from a roadway standpoint will only be 2' wider in total (1' at the flowlines) than what is existing and thus will match pretty cleanly as well as it will continue the on street parking which exists along the existing length of Cinquefoil. Please let me know if you have any questions, Andrew S. Gingerich, P.E. `Ciof gart Coffins Engineering Development Review 281 North College Avenue Fort Collins, CO 80524 Phone: 970.221.6603 g9in9erich@fcgev com Banner Health - 36% HTP - 27% Imago - 16% Background - 21 % 1 1� a� M o Jg Banner Health - 89/. Winchester - 16% Imago - 74% Background - 2% 0 Cr c 9 Harmony TRAFFIC VOLUME BREAKDOWN OF THE EASTBOUND RIGHT -TURN LANES ON HARMONY ROAD Figure 1 -_/I f DELICH - / [-ASSOCIATES APPENDIX A 4z Dan From: James Prelog games@northernenglneering,comj Sent: Wednesday, November 27, 2013 4:33 PM To: dan@alphagps.com Subject: Dan, The combo inlet back of boxes should be staked per the details provided and coordinated with the contractor who will Pour in place. When the sidewalk is adjacent to the curb and gutter the back of the box 15 1 foot behind the flowline with the lip of gutter warping over 2 feet to the front of the grate. When it is just curb and gutter the back of the box is 2 feet behind the flowline. The flowline Is then warped back over 2 feet. The rest of the dimensions can be determined from the detail and coordination with the contractor constructing it. Please contact Randall if you have further questions. Have a Great-Dayl ✓A^f&e PREZOgJ' PE NORTHERN ENGINEERING 200 South College Avenue, Suite 10 I Fort Collins, Colorado 80524 0: 970.221.4158 ext. 5408 1 D: 970,558.5408 1 M: 970.231.3430 F: 970.221,4159 1LamesOnorthern nutneerinn.corn 1 www.nartherneneir arinv cam 1 Andrew S. Gin erich From: ,urnt' Jay Kralicek <Jaymes.Kralicek@jedunn.com> f' Sent: �`I �Qind, December 02, 2013 3:16 PM T" ' To: dv�f Rick Richter; Andrew S. Gingerich Cc; Matt Bilstein;'mark.ostrand@bannerhealth.com'; Mike Sills Subject- "r ARE: B ner Fort Collins Medical Center Construction Update Meeting At chments: L r�� Uttyequence - Dunrite.pdf; Banner Harmony Right of Way Schedule Plans Exhibit ��V r( VISED 11-15-13 PRO ....pdf en 4nen, V �- We wanted to follow up on our November 1.9`rmeeting with a few progress updates and projections. B low Is ,an ��ate 6J r,dtli^e from the Meeting Agenda discussion topics. Please review and provide any comments you might dait.es showy; are anticipated and are subject to change due to weather, unforeseen conditions, �11'tri: i , drld other factors out JE Dunn's control. As work progresses and we near our building permit date, we'll look to schedule a second meeting to ensure we are all on the same page with permit standing. Goal for issuance of full building permit: Jan 06, 2014 1. Schedule for completing Utilities / Infrastructure a. Utilities: We have met with our utilities subcontractor, Dunrite Excavation, to discuss ways to accelerate the schedule in an effort to meet building permit prerequisites. Dunrite has added a third crew, increased manpower, and is working weekends as weather allows. Attached is an updated schedule/sequence based upon this acceleration. Weather permitting, we plan to have all building permit required utilities complete on Jan 06, 2014 — this includes Le Fever and Cinquefoil utilities, entire site water main loop, and fire hydrants. b. Infrastructure: Weather over the coming weeks and months will have a major impact on any concrete work. JE Dunn would like to further discuss timing of infrastructure work as it pertains to the issuance of jj the full building permit and going vertical with steel erection. IN 2. Timeline for testing and city review of pavement sections a. Le Fever: Ground performed testing on Mon 11/25/13. Currently awaiting final pavement design. Scheduled to place road base once pavement design is complete (next week?), but have yet to determine if curb & gutter is to be placed this time of year. City Water Department confirmed that the existing water main in question will riot need to be relocated. b. Cinquefoil: Anticipate completion of all roadway utilities in late December. Will coordinate. with Ground for testing and design. Yet to determine if curb & gutter is to be placed this time of year. 3. Curb and Gutter a. Road base required to back of curb? — No, contractor option b. City inspector requesting curb placement postponed until Spring —JE Dunn would like to further discuss timing of curb & gutter installation as it pertains to the issuance of the full building permit and going vertical with steel erection. 4. Are Cinquefoil and Le Fever necessary prior to going vertical with Lady Moon providing access? a. Projected completion status on Jan 06, 2014 i. Le Fever: All utilities installed and tested, base course placed. Curb & gutter weather dependent, JE DL)nn would propose holding off until consistent favorable temps. Asphalt pavement placed in the Spring'1.4. S 1 m t ii Cinquefoil: A]| utilities installed andtcs��d, and soils testing completed. Base Course to be � design, JE D would propose ho|dinQoff on curb & p|oced,assumin8comp|edonofpavement esQn� Dunn ' gutter until consistent favorable tenops.Asphalt pavement placed in the Spring 14. iii Site: Water mainand fire hydrants installed and tested. Emergency access roads placed. Foundations complete and ready for steel erection, B]Gplaced ifweather allows. 5. Building Permit status a. Outstanding fees: ]E Dunn to continue to monitor asfees are calculated b. Reviews & Comments: Dunn vviU c )E D continue to monitor and coordinate with design team to address. 6. Other Thankyou' Jaymes Kralicek Senior Project Engineer JsounocnnstRuruon zoouoco/oradoBlvd, Suite 1zocm.Denver, CO8Vzzz | yuww.ieuduzn.cum m�mxozouuraaz mnunon0s.000uror | =~ �� � , � '~ ��� n FI (s) JE Dunn Construction Ink 0 2000 S. Colorado Blvd, Suite 12000 JEDUIMM Denver, CO 80222 C ON�STRIJCTION Phone: 303.753.8988 Fax 303.980.0977 BANNER FORT COLLINS MEDICAL CENTER CONSTRUCTION UPDATE MEETING Project No: 13072100 Date: December 09, 2013 Place: City Engineering 1) Schedule for completing utilities / infrastructure a) Utilities: We }rave filet with our utilities subcontractor, Dunrite Excavation, to discuss ways to wccieratc the ;chedule in an effort to meet buildin<< permit prerequisites, DInr-ite has added a third crew.. increased rntrnpmer, and is workiru- weekends as weather allows. Attached is an ul:>dated sclledt 1C s�;qucnd c ba ec upon this acceleration. Weather perrnitting, we plan to have all building permit required utilities c0113piete on Jan 1 32011--this includes Le Fever and Cinquefoil utilities, entire site water rnairr loop, and fire hydrants. b) Infrastructure: Weather over the coming, weeks and months will have a major impact on any concrete 'Ix. -11_. Dunn ti,Nould like to fur-ther discuss tiniim.r of infrastructure work as it p r iron to the srramc of tic full boil I n'- permit aura ,roirle vertical with steel erection. 2) Timeline for testing and city review of pavement sections a) Le Fever: Ground performed testing On Mon I 1 13, Currently awaiting; final pavan cnt digs � ;�. 11 17urnn would propose to hold off on placin<_; curb and gutter until consistent v,,nrm tcllipi t�itutrcS dre rcttcl�cd. 11 i�, proposed that road base not be placed on I_,e Dever until just before curb and gutter plaeerncnt. (`ity a'titd, Department confirmed ilim the existing; water ntmn ill gt1C.StlOn will not need 10 he rC1 �cfltedl. b) Cinquefoil lnticip�tte completion of all roadwa� u tililies in late December, Will coordinate with Ground ust and des Inn. Yet to detcrknirte if curb and guitcr k to be placed this lime ofycar. 31' Dtnul prop�»�s p lacitl a temp ctnerp.ency access road down Cinquefoil to complete the loop to 1 larmom Rd. I ir�t lift of road base would then be placed just prior to curb and gutter 3) Curb and gutter a) Road base required to back of curb? No, contractor option b) City inspector requesting club placement postponement until Spring. JL Dilntl WOLI d like to .'.niter discuss tinfiin}' of Curb & <'utter installation as it pertains to the issuance of Ilse full buildinll permit and ��oirrr� vertical %>ith steel erection. 4) Are Cinquefoil and Le Fever necessary prior to going vertical with Lady Moon Dr. providing access? a) Projected completion status on Jan 13, 2014 i) Le Fever: All utilities installed and tested, final p'lvenrent design completed. Ilase Course placed just pl for to curb and stutter (proposed). Curb (lCp(..'IldVitt-.11= DUMI `X0.11ul holdinu o[Tuntil consistent tiivorable tetltps. Asphalt pavement plruced in thr Sprimt , if) Cinquefoil: All u.rtilitit;s installed and ICstcd. and soil, ILCStit,u, c)Inplt tet.l. ?(Y wide temp c°nl t ;c.ney ccu�ss road in place, connectitrt; to Elarmony Rd. Base course placed just prior to curb and gutter (h 01)0'Wd). .I1: 1:)unri would ptopo.se holdimg oft on curb & gutter until consktcnt favorable temps. Asphalt pavement placed in the sm-irl" , [4. iii) Site: Water main and fire hydrants installed and tested. }i,mer ;e.ncy access rinds placed. Foundation,) complete and ready I'Or steel erection, SOG placed if weather illows. 5) Outstanding fees a) City tap fees for water and sewer; amount and when needed? b) Fees for final building permit; amount and when needed? 6) Other BFCMC OAC Meeting Agenda