Loading...
HomeMy WebLinkAboutMVG-MORNINGSTAR ASSISTED LIVING AND MEMORY CARE - Filed DA-DEVELOPMENT AGREEMENT - 2014-05-20RECEPTION#: 20140024537, 05/14/2014 at 03:00:50 PM,1 OF 24, R $126.00 TD Pgs: 0 Angela Myers, Clerk & Recorder, Larimer County, CO DEVELOPMENT AGREEMENT THIS DEVELOPMENT AGREEMENT (the "Agreement"), is made and entered into this 12-tg day of -O!Vd!4 201�y, by and between the CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City"; and MVG-MS (Ft. Collins) LLC, a Colorado limited liability company, hereinafter referred to as the "Developer." WITNESSETH: WHEREAS, the Developer is the owner of certain real property situated in the County of Larimer, State of Colorado (hereafter sometimes referred to as the "Property" or "Development") and legally described as follows, to wit: MVG-Morningstar Assisted Living & Memory Care, located in Section 30, Township 7 North, Range 68 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. WHEREAS, the Developer desires to develop the Property and has submitted to the City all plats, plans (including utility plans), reports and other documents required for the approval of a final plan according to the City's development application submittal requirements master list (the "Final Development Plan Documents") copies of which are on file in the office of the City Engineer and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of the Property will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the Property and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the Final Development Plan Documents submitted by the Developer, subject to certain requirements and conditions, which involve the installation of and construction of utilities and other municipal improvements in connection with the development of the Property. NOW, THEREFORE, in consideration of the promises of the parties hereto and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, it is agreed as follows: V 1 Ot T-o, -oga lf1s c� CIRfV- be submitted to and approved by the Poudre Fire Authority and City Engineer. (Three plan sets shall be submitted to the Poudre Fire Authority at 102 Remington Street for review and processing.) If such accessway is at any time deemed inadequate by the Poudre Fire Authority or City Engineer, the accessway shall be promptly brought into compliance and until such time that the accessway is brought into compliance, the City and/or the Poudre Fire Authority may issue a stop work order for all or part of the Development. Footing and Foundation Permits 1. Notwithstanding any provision in this Agreement to the contrary, the Developer shall have the right to obtain Footing and Foundation permits upon the installation of all underground water, sanitary sewer, and storm sewer facilities, and an emergency accessway for the phase in which the permit is being requested. Facilities shall include but not be limited to all mains, lines, services, fire hydrants and appurtenances for the site as shown on the Final Development Plan Documents. J. Development Construction Permit 1. The Developer shall apply for and obtain a Development Construction Permit for this Development, in accordance with Division 2.6 of the Land Use Code, prior to the Developer commencing construction. The Developer shall pay the required fees for said Permit and construction inspection, and post security to guarantee completion of the public improvements required for this Development, prior to issuance of the Development Construction Permit. K. Maintenance and Repair Guarantees 1. The Developer agrees to provide a two-year maintenance guarantee and a five-year repair guarantee covering all errors or omissions in the design and/or construction of the public improvements required for this Development, which guarantees shall run concurrently and shall commence upon the date of completion of the public improvements and acceptance thereof by the City. More specific elements of these guarantees are noted in Exhibit "C." Security for the maintenance guarantee and the repair guarantee shall be as provided in Section 3.3.2(C) of the Land Use Code. Notwithstanding the provisions of paragraphs III (H) and (1) of this Agreement to the contrary, the obligations of the Developer pursuant to this paragraph and Exhibit "C" may not be assigned or transferred to any other person or entity unless the warranted improvements are completed by, and a letter of acceptance of the warranted improvements is received from the City by, such other person or entity. III. Miscellaneous to A. The Developer agrees to provide and install, at its expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the City Engineer and Traffic Engineer in accordance with the City's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been completed. B. As required pursuant to Chapter 20, Article IV of the City Code, the Developer shall, at all times, keep the public right-of-way free from accumulation of waste material, rubbish, or building materials caused by the Developer's operation, or the activities of individual builders and/or subcontractors; shall remove such rubbish as often as necessary, but no less than daily and; at the completion of the work, shall remove all such waste materials, rubbish, tools, construction equipment, machinery, and surplus materials from the public right-of-way. The Developer further agrees to maintain the finished street surfaces so that they are free from dirt caused by the Developer's operation or as a result of building activity. Any excessive accumulation of dirt and/or construction materials shall be considered sufficient cause for the City to withhold building permits and/or certificates of occupancy until the problem is corrected to the satisfaction of the City Engineer. If the Developer fails to adequately dean such streets within two (2) days after receipt of written notice, the City may have the streets cleaned at the Developer's expense and the Developer shall be responsible for prompt payment of all such costs. The Developer also agrees to require all contractors within the Development to keep the public right-of-way clean and free from accumulation of dirt, rubbish, and building materials. C. The Developer hereby agrees that it will require its contractors and subcontractors to cooperate with the City's construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. The Developer shall, pursuant to the terms of this Agreement, complete all improvements and perform all other obligations required herein, as such improvements or obligations may be shown on the Final Development Plan Documents, or any documents executed in the future that are required by the City for the approval of an amendment to a development plan, and the City may withhold (or to the extent permitted by law, revoke) such building permits and certificates of occupancy as it deems necessary to ensure performance in accordance with the terms of this Agreement. The processing and "routing for approval" of the various development plan documents may result in certain of said documents carrying dates of approval and/or execution that are later than the date of execution of this Agreement. The Developer hereby waives any right to object to any such discrepancy in dates. E. Nothing herein contained shall be construed as a waiver of any requirements of the City Code or the Land Use Code and the Developer agrees to comply with all requirements of the same. 11 F. In the event the City waives any breach of this Agreement, no such waiver shall be held or construed to be a waiver of any subsequent breach hereof. G. All financial obligations of the City arising under this Agreement that are payable after the current fiscal year are contingent upon funds for that purpose being annually appropriated, budgeted and otherwise made available by the Fort Collins City Council, in its discretion. H. This Agreement shall run with the Property, including any subsequent replatting of all, or a portion of the Property. This Agreement shall also be binding upon and inure to the benefit of the parties hereto, their respective personal representatives, heirs, successors, grantees and assigns. It is agreed that all improvements required pursuant to this Agreement touch and concern the Property regardless of whether such improvements are located on the Property. Assignment of interest within the meaning of this paragraph shall specifically include, but not be limited to, a conveyance or assignment of any portion of the Developer's legal or equitable interest in the Property, as well as any assignment of the Developer's rights to develop the Property under the terms and conditions of this Agreement. I. In the event the Developer transfers title to the Property and is thereby divested of all equitable and legal interest in the Property, the Developer shall be released from liability under this Agreement with respect to any breach of the terms and conditions of this Agreement occurring after the date of any such transfer of interest. In such event, the succeeding property owner shall be bound by the terms of this Agreement. J. Each and every term of this Agreement shall be deemed to be a material element hereof. In the event that either party shall fail to perform according to the terms of this Agreement, such party maybe declared in default. In the event that a party has been declared in default hereof, such defaulting party shall be given written notice specifying such default and shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to: (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance or; (c) avail itself of any other remedy at law or equity. K. In the event of the default of any of the provisions hereof by either party which shall require the party not in default to commence legal or equitable action against said defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney's fees and costs incurred by reason of the default. Nothing herein shall be construed to prevent or interfere with the City's rights and remedies specified in Paragraph III.D of this Agreement. L. Except as may be otherwise expressly provided herein, this Agreement shall not be construed as or deemed to be an agreement for the benefit of any third 12 party or parties, and no third party or parties shall have any right of action hereunder for any cause whatsoever. M. It is expressly understood and agreed by and between the parties hereto that this Agreement shall be governed by and its terms construed under the laws of the State of Colorado and the City of Fort Collins, Colorado. N. Any notice or other communication given by any party hereto to any other party relating to this Agreement shall be hand -delivered or sent by certified mail, return receipt requested, addressed to such other party at their respective addresses as set forth below; and such notice or other communication shall be deemed given when so hand -delivered or three (3) days after so mailed: If to the City: Engineering Development Review City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 With a copy to: City Attorney's Office City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 If to the Developer. MVG-MS (Ft. Collins) LLC Attn: Max Martin 1509 York Street, Third Floor Denver, CO 80206 With a copy to: MVG Development Attn: General Counsel PO Box 18970 Denver, CO 80218 Notwithstanding the foregoing, if any party to this Agreement, or its successors, grantees or assigns, wishes to change the person, entity or address to which notices under this Agreement are to be sent as provided above, such party shall do so by giving the other parties to this Agreement written notice of such change. O. When used in this Agreement, words of the masculine gender shall include the feminine and neuter gender, and when the sentence so indicates, words of the neuter gender shall refer to any gender; and words in the singular shall include the plural and vice versa. This Agreement shall be construed according to its fair meaning, and as if prepared by all parties hereto, and shall be deemed to be and contain the entire understanding and agreement between the parties hereto pertaining to the 13 matters addressed in this Agreement. There shall be deemed to be no other terms, conditions, promises, understandings, statements, representations, expressed or implied, concerning this Agreement, unless set forth in writing signed by all of the parties hereto. Further, paragraph headings used herein are for convenience of reference and shall in no way define, limit, or prescribe the scope or intent of any provision under this Agreement. P. Lender Acknowledgment 1. The City acknowledges that, pursuant to Section III.N of this Agreement, the Developer may in the future request that copies of all notices given by the City to the Developer shall also be given to a lender which will be identified in writing to the City by name and address. The City further acknowledges that such lender has a right (but not the obligation) to remedy or cure any default by the Developer under this Agreement on behalf of the Developer and that the City will accept such remedy or cure if properly carried out by the Lender on behalf of the Developer. 2. Nothing contained herein shall be construed to impose any liability or obligation of the City to the lender, except as expressly provided herein. ATTES r "= SEAL City Clerk / �We APPROVED AS TO CONTENT: APPROVA-E-DAS Deputy City THE CITY OF FORT QOLLINS, COLORADO, a Municipal Corporati By: City Manager DEVELOPER: 14 MVG-MS (Ft. Collins) LLC, a Colorado limited liability company By: Millennium Venture Group, Inc., a Delaware corporation, its Manager By: Carolyn S. Po ell, Vice President, General Counsel and Secretary STATE OF COLORADO ) )BNveK ) ss. COUNTY OFR ) The foregoing instrument was acknowledged before me this Ott day of A , 20_Lq_, by MVG-MS (Ft. Collins) LLC, a Colorado limited liability company, by Millennium Venture Group, Inc., a Delaware corporation, its Manager, by Carolyn S. Powell its Vice President, General Counsel and Secretary. My Commission Expires: 3 31 # 1 15 4W ---- 9- . 1fWMGMA 0. oO+.014;0 NOTARYPUBLIC VA78 OF OOLORADO NWARY102013 01ef W WeOMMIBSION ENPIREB MARCIMS Mi EXHIBIT "A" 1. Schedule of electrical service installation. Electrical lines need to be installed prior to the installation of the sidewalk, curb returns, handicap ramps, paving and landscaping. If the Developer installs any curb return, sidewalk or handicap ramp prior to the installation of electrical lines in an area that interferes with the installation of the electrical line installation, the Developer shall be responsible for the cost of removal and replacement of those items and any associated street repairs. 2. Schedule of water lines to be installed out of sequence. Not Applicable. 3. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable. 4. Schedule of street improvements to be installed out of sequence. Not Applicable 5. Schedule of storm drainage improvements to be installed out of sequence. Not Applicable. 16 EXHIBIT "B" STANDARD OPERATING PROCEDURES (SOPs) MVG Morningstar Assisted Living and Memory Care Lochwood Drive, Fort Collins, CO A. PURPOSE In order for physical stormwater Best Management Practices (BMPs) to be effective, proper maintenance is essential. Maintenance includes both routinely scheduled activities, as well as non - routine repairs that may be required after large storms, or as a result of other unforeseen problems. Standard Operating Procedures (SOPS) should clearly identify BMP maintenance responsibility. BMP maintenance is typically the responsibility of the entity owning the BMP. Identifying who is responsible for maintenance of BMPs and ensuring that an adequate budget is allocated for maintenance is critical to the long-term success of BMPs. Maintenance responsibility may be assigned either publicly or privately. For this project, the privately owned BMPs shown in Section B below are to be maintained by the property owner or property manager. B. SITE -SPECIFIC SOPS The following stormwater facilities contained within the MVG Morningstar Assisted Living and Memory Care development are subject to SOP requirements: - Permeable Pavers - Dry Detention Pond and Water Quality Outlet Structure - Grass Swale (without underdrain) - Dry Wells - Storm Drains The location of said facilities can be found on the Utility Plans for MVG Morningstar Assisted Living and Memory Care. Inspection and maintenance procedures and frequencies, specific maintenance requirements and activities, as well as BMP-specific constraints and considerations shall follow the guidelines outlined in Volumes 3 and 6 of the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. 17 SOP Maintenance Summary Stormwater Facility/BMP Ownership/Responsibility UDFCD Maintenance Reference Permeable Pavers Private See Permeable Powment Systems Dry Detention Pond Private See Extended Detention Basins Grass Swale Private See 6ross Buffers and SmIes Dry Wells Private Storm Drains Private Permeable Pavers Maintenance Plan Routine Maintenance Table (Summary from Chapter 6 of UDFCD) Reauired Action Maintenance Obiective Frequency of Action Debris Removal, Sweeping, and Remove debris with regular Routine - Sweeping should be Vacuuming sweeping of the pavement performed weekly to monthly surface, typically performed depending on the season. with a broom sweeper. Frequency of vacuuming is site Removing solids from void specific but recommended spaces will require a vacuum or twice annually to maintain regenerative air infiltration rates. Sweeper. Snow Removal Conventional plowing operations Non -routine - Performed as should be used for snow needed after winter storm removal. Do not use sand or events. deicing liquids on permeable pavement systems. If sand is accidentally used, use a vacuum sweeper to remove it Full or Partial Replacement of Concrete pavers, when installed Non -routine - Performed as Pavement or InfilI Material correctly, should have a long needed when surface service life. Follow industry infiltration becomes completely guidelines for installation and clogged or when individual replacement after underground pavers require a repair. repairs. If the surface is completely clogged, restoration of infiltration can be achieved by removing the first I to 1 inch of soiled aggregate inf ill material with a vacuum 18 sweeper. Replace with clean aggregate inf ill material using a push broom. Inspections Inspect to ensure that the Routine - Inspect pavement facility continues to function as condition at least annually, initially intended. either during a rain event or with a garden hose to ensure that water infiltrates into the surface. Systematic measurement of surface infiltration can be accomplished using ASTM C1701 Standard Test Method for Infiltration Rate of In Place Pervious Concrete Routine Maintenance Table (Summary adapted from Chapter 6 of UDFCD) Reauired Action AAnin+amrre_ _i •-46:_.. Sediment, Debris and Remove sediment, debris and Routine - Including just before Litter Removal litter from the entire pond to annual storm seasons (that is, minimize outlet clogging and April and May), end of storm improve aesthetics season after leaves have fallen, and following significant rainfall events. Major Pond Sediment Remove accumulated sediment Non -routine - Performed when Removal from the bottom of the basin. sediment accumulation occupies 20 percent of the pond volume. This may vary considerably, but expect to do this every 15 to 25 years, as necessary per inspection if no construction activities take place in the tributary watershed. More often if they do. Mowing & Plant Care Maintain healthy, weed -free Non -routine - Performed as vegetation needed depending on planting scheme and cover. Weeds should be removed before they flower. Aeration Supply the soil and roots with J Routine - Performed at least 19 I. General Conditions A. The terms of this Agreement shall govern all development activities of the Developer pertaining to the Property. For the purposes of this Agreement, "development activities" shall include, but not be limited to, the following: (1) the actual construction of improvements, (2) obtaining a permit therefor, or (3) any change in grade, contour or appearance of the Property caused by, or on behalf of, the Developer with the intent to construct improvements thereon. B. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, sidewalks, and bikepaths shall be installed as shown on the Final Development Plan Documents and in full compliance with the standards and specifications of the City on file in the office of the City Engineer at the time of approval of the utility plans relating to the specific utility, subject to a three (3) year time limitation from the date of approval of the site specific development plan. In the event that the Developer commences or performs any construction pursuant hereto after the passage of three (3) years from the date of approval of the site specific development plan, the Developer shall resubmit the utility plans to the City Engineer for reexamination. The City may then require the Developer to comply with the approved standards and specifications of the City on file in the office of the City Engineer at the time of the resubmittal. C. No building permit for the construction of any structure within the Property shall be issued by the City until the public water lines and stubs to each lot, fire hydrants, electrical lines, sanitary sewer lines and stubs to each lot, and public streets (including curb, gutter, sidewalk, and pavement with at least the base course completed) serving such structure have been completed and accepted by the City. No building permits shall be issued for any structure located in excess of six hundred and sixty feet (660') from a single point of access, unless the structures contain sprinkler systems that are approved by the Poudre Fire Authority. D. Any water lines, sanitary sewer lines, storm drainage lines, electrical lines, and/or streets described on Exhibit "A," attached hereto, shall be installed within the time and/or sequence required on Exhibit "A." If the City Engineer has determined that any water lines, sanitary sewer lines, storm drainage facilities and/or streets are required to provide service or access to other areas of the City, those facilities shall be shown on the Final Development Plan Documents and shall be installed by the Developer within the time as established under "Special Conditions" in this Agreement. E. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer, and storm drainage facilities and appurtenances, and all streets, curbs, gutters, sidewalks, bikeways and other public improvements required by this Development as shown on the Final Development Plan air and increase infiltration, reduce soil compaction, and help water move into the root zone once per year when the ground is not frozen. Water turf thoroughly prior to aeration. Avoid aerating in hot A dry conditions. Heavy traffic areas may require more frequent aeration Mosquito Control Inspect for signs of mosquito Routine - Inspect Weekly. breeding; provide treatment Typically, inspections start in when breeding is found. mid -May and extend to mid - Inspection and treatment is September. recommended to be performed by a mosquito control service Inspections Inspect basins to insure that Routine - Annual inspection of the pond continues to function hydraulic and structural as initially intended. Examine facilities. Also check for the outlet for clogging, erosion, obvious problems during routine slumping, excessive maintenance visits, especially sedimentation levels, for plugging of outlets. overgrowth, embankment and spillway integrity and damage to any structural element. Grass Swale Maintenance Plan Routine Maintenance Table (Summary from Chapter 6 of UDFCD) Required Action Maintenance_ f3hier4iw -4 e..a:-- Debris and Litter Removal Remove litter and debris to Non -routine - Perform as prevent rill and gully needed based on inspection, but development from preferential no less than two times per year. flow paths around accumulated debris, enhance aesthetics, and prevent floatables from being washed offsite. Sediment Removal Remove accumulated sediment Non -routine - Remove sediment near culverts and in channels to as needed based on inspection. maintain flow capacity. Spot Frequency depends on site replace the grass areas as specific conditions. For necessary. planning purposes, it can be estimated that 3 to 10% of the swale length will require 20 sediment removal on an annual basis. Mowing Deter weeds and maintain a Routing- Mowing manicured healthy stand of grasses, both grass may vary from as native and manicured. frequently as weekly during the summer, to no mowing during the winter. Aeration Supply the soil and roots with Routine - Performed at least air and increase infiltration, once per year when the ground reduce soil compaction, and is not frozen. Water turf help water move into the root thoroughly prior to aeration. zone. Avoid aerating in hot do dry conditions. Heavy traffic areas may require more frequent aeration. Irrigation Schedule and Avoid over or under watering to Non -routine - Adjust irrigation Maintenance maintain healthy grass cover schedules throughout the which promotes sediment and growing season to provide the pollutant removal rates, proper irrigation application rate. Fertilizer, Herbicide, and Use the minimum amount of Non -routine - Apply on an as - Pesticide Application biodegradable nontoxic needed basis only and decrease fertilizers and herbicides application following needed to establish and establishment of vegetation. maintain dense vegetation cover that is reasonably fee of weeds. Inspections Inspect vegetation for uniform Routine - Minimum of twice cover and traffic impacts. annual inspection of infiltrating Check for sediment surface. accumulation and rill and gully development. Routine Maintenance Table Reauired Action Maintananee 06iAW-tiv! Fwmneman~ of I.-+!. Sediment, Debris and Litter Remove sediment, debris, Non -routine - Remove debris as Removal weeds and litter from the top needed after storm events or of the Dry Well to minimize seasonally such as during the clogging and improve I Fall with heavy amounts of 21 aesthetics. leaves and twigs entering the stem. Gravel Replacement The top layers of Dry Well will Non -routine - Remove and clean require periodic removal and portions of the gravel media washing of the gravel media to every one to two years. Clean ensure infiltration rates are gravel of sediment and replace. maintained. Filter fabrics may be used to minimize sediment penetration to the gravel layer. Inspection Ensure Dry Wells are Routine - Inspect Dry Wells at functioning as intended and are least four times per year and not clogged. after large storm events. Routine Maintenance Table Reauired Action Maintenance Obiective Freouencv of Action Debris Removal from Inlets and Catch Basins Remove debris and trash from inlets to prevent them from continuing downstream or clogging and reducing the flow capacity of the system. Non -routine - Remove debris as needed after storm events or seasonally such as during the Fall with heavy amounts of leaves and twigs entering the stem. Debris Removal from Storm Ensure the pipe systems Non -routine - Pipe cleaning is Pipes function as intended. Reduced recommended as needed based capacities in the pipes will on the results of inspections or cause the system to back up when the system is no longer and increase the frequency of able to regularly convey routine surface flooding that could storm flows from the site. damage property. Inspection Use a video camera to inspect Routine - Visually Inspect pipes the condition of the storm and inlets at least annually or drain pipes looking for sediment after major storm events. buildup and structural integrity. Every 2-5 years the pipes Clean out pipes as needed. If should be inspected with a the integrity of the pipe is video camera. compromised, then repair the damaged sections . 22 EXHIBIT "C MAINTENANCE GUARANTEE: The Developer hereby warrants and guarantees to the City, for a period of two (2) years from the date of completion and first acceptance by the City of the public improvements warranted hereunder, the full and complete maintenance and repair of the public improvements constructed for this Development. This warranty and guarantee is made in accordance with the City of Fort Collins Land Use Code and/or the Transitional Land Use Regulations, as applicable. This guarantee applies to the streets and all other appurtenant structures and amenities lying within the rights -of -way, easements and other public properties, including, without limitation, all curbing, sidewalks, bike paths, drainage pipes, culverts, catch basins, drainage ditches and landscaping. Any maintenance and/or repair required on utilities shall be coordinated with the owning utility company or city department. The Developer shall maintain said public improvements in a manner that will assure compliance on a consistent basis with all construction standards, safety requirements and environmental protection requirements of the City. The Developer shall also correct and repair, or cause to be corrected and repaired, all damages to said public improvements resulting from development -related or building -related activities. In the event the Developer fails to correct any damages within thirty (30) days after written notice thereof, then said damages may be corrected by the City and all costs and charges billed to and paid by the Developer. The City shall also have any other remedies available to it as authorized by this Agreement. Any damages which occurred prior to the end of said two (2) year period and which are unrepaired at the termination of said period shall remain the responsibility of the Developer. REPAIR GUARANTEE: The Developer agrees to hold the City of Fort Collins, Colorado, harmless for a five (5) year period, commencing upon the date of completion and acceptance by the City of the public improvements constructed for this Development, from any and all claims, damages, or demands arising on account of the design and construction of public improvements of the Property shown on the approved plans and documents for this Development; and the Developer furthermore commits to make necessary repairs to said public improvements, to include, without limitation, the roads, streets, fills, embankments, ditches, cross pans, sub -drains, culverts, walls and bridges within the right-of-way easements and other public properties, resulting from failures caused by design and/or construction defects. This agreement to hold the City harmless includes defects in materials and workmanship, as well as defects caused by or consisting of settling trenches, fills or excavations. 23 'P Further, the Developer agrees that the C the warranty period, for any claim of da engineering techniques and due caution structures or buildings, the changing of natural creeks and rivers, and any other and all monetary liability occurring and Developer. ity shall not be liable to the Developer during mages resulting from negligence in exercising in the construction of cross drains, drives, courses of streams and rivers, flooding from matter whatsoever on private property. Any er this paragraph shall be the liability of the The obligations of the Developer pursuant to the "maintenance guarantee" and "repair guarantee" provisions set forth above may not be assigned or transferred to any other person or entity unless the warranted improvements are completed by, and a letter of acceptance of the warranted improvements is received from the City by, such other person or entity. 24 Documents and other approved documents pertaining to this Development on file with the City. F. Street improvements shall not be installed until all utility lines to be placed therein have been completely installed, including all individual lot service lines (water and sewer) leading in and from the main to the property line and all electrical lines. G. The installation of all utilities shown on the Final Development Plan Documents shall be inspected by the Engineering Department of the City and shall be subject to such department's approval. The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict, the Final Development Plan Documents shall supersede the standard specifications, except that if the conflicts are a result of Federal or State mandated requirements, then the Federal or State mandated requirements shall prevail. H. Public easements shall be provided for access, utilities and drainage as required by the design and location of such infrastructure and as reflected on the plans. Alignment and grades on privately maintained streets and drives shall allow for safe access, ingress and egress by owners, visitors, the general public and public safety officials and equipment, as approved by the City Engineer. I. All storm drainage facilities shall be designed and constructed by the Developer so as to protect downstream and adjacent properties against injury and to adequately serve the Property (and other lands as may be required, if any). The Developer shall meet or exceed the minimum requirements for storm drainage facilities as have been established by the City in its Drainage Master Plans and Design Criteria. The Developer, for itself and its successor(s) in interest, does hereby indemnify and hold harmless the City from any and all claims that might arise, directly or indirectly, as a result of the discharge of injurious storm drainage or seepage waters from the Property in a manner or quantity different from that which was historically discharged and caused by the design or construction of the storm drainage facilities, except for (1) such claims and damages as are caused by the acts or omissions of the City in maintenance of such facilities as have been accepted by the City for maintenance; (2) errors, if any, in the general concept of the City's master plans (but not to include any details of such plans, which details shall be the responsibility of the Developer); and (3) specific written or otherwise documented directives that may be given to the Developer by the City. The City agrees to give notice to the Developer of any claim made against it to which this indemnity and hold harmless agreement by the Developer could apply, and the Developer shall have the right to defend any lawsuit based on such claim and to settle any such claim provided Developer must obtain a complete discharge of all City liability through such settlement. Failure of the City to give notice of any such claim to the Developer within ninety (90) days after the City first receives a notice of such claim under the Colorado Governmental Immunity Act for the same, shall cause this indemnity and hold harmless agreement by the Developer to not apply to such claim and such failure shall constitute a release of this indemnity and hold harmless agreement as to such claim. Approval of and acceptance by the City of any storm drainage facility design or construction shall in no manner be deemed to constitute a waiver or relinquishment by the City of the aforesaid indemnification. The Developer shall engage a Colorado licensed professional engineer to design the storm drainage facilities as aforesaid and it is expressly affirmed hereby that such engagement shall be intended for the benefit of the City, and subsequent purchasers of property in the Development. J. The Developer shall pay the applicable "stormwater plant investment fee" in accordance with Chapter 26, Article VII of the City Code. This fee is included with building permit fees and shall be paid prior to the issuance of each building permit. K. The Developer shall provide the City Engineer with certified Record Plan Transparencies on Black Image Diazo Reverse Mylars upon completion of each phase of the construction. Utilities will not be initially accepted prior to as -built drawings being submitted to and approved by the City of Fort Collins. L. The Developer specifically represents that to its knowledge all property dedicated (both in fee simple and as easements) to the City associated with this Development (whether on or off -site) is in compliance with all environmental protection and anti -pollution laws, rules, regulations, orders or requirements, including solid waste requirements, as defined by the U. S. Environmental Protection Agency Regulations at 40 C.F.R., Part 261, and that such property as is dedicated to the City pursuant to this Development, is in compliance with all such requirements pertaining to the disposal or existence in or on such dedicated property of any hazardous substances, pollutants or contaminants, as defined by the Comprehensive Environmental Response Compensation and Liability Act of 1980, as amended, and regulations promulgated thereunder. The Developer, for itself and its successor(s) in interest, does hereby indemnify and hold harmless the City from any liability whatsoever that may be imposed upon the City by any governmental authority or any third party, pertaining to the disposal of hazardous substances, pollutants or contaminants, and cleanup necessitated by leaking underground storage tanks, excavation and/or backfill of hazardous substances, pollutants or contaminants, or environmental cleanup responsibilities of any nature whatsoever on, of, or related to any property dedicated to the City in connection with this Development, provided that such damages or liability are not caused by circumstances arising entirely after the date of acceptance by the City of the public improvements constructed on the dedicated property, except to the extent that such circumstances are the result of acts or omissions of the Developer. Said indemnification shall not extend to claims, actions or other liability arising as a result of any hazardous substance, pollutant or contaminant generated or deposited by the City, its agents or representatives, upon the property dedicated to the City in connection with this Development. The City agrees to give notice to the Developer of any claim made against it to which this indemnity and hold harmless agreement by the Developer could apply, and the Developer shall have the right to defend any lawsuit based on such claim and to settle any such claim provided the Developer must obtain a complete discharge 4 of all City liability through such settlement. Failure of the City to give notice of any such claim to the Developer within ninety (90) days after the City first receives a notice of such claim under the Colorado Governmental Immunity Act for the same, shall cause this indemnity and hold harmless agreement by the Developer to not apply to such claim and such failure shall constitute a release of this indemnity and hold harmless agreement as to such claim. M. The Developer acknowledges and agrees that the City, as the owner of any adjacent property (the "City Property") on which off -site improvements may be constructed, or that may be damaged by the Developer's activities hereunder, expressly retains (and does not by this Agreement waive) its rights as property owner. The City's rights as owner may include without limitation those rights associated with the protection of the City Property from damage, and/or the enforcement of restrictions, limitations and requirements associated with activities on the City Property by the Developer as an easement recipient. N. If the Developer or Contractor or any agent or representative thereof causes damage to any public infrastructure (including without limitation, any surface pavers, flagstones, or other stone or concrete surfaces, planters, street and decorative lights, or canopies) such damage shall be promptly repaired with the same kind, quality, color, serviceability and material composition aspects as was possessed by the infrastructure damaged, unless otherwise expressly agreed to by the City in writing. Paver repair and replacement in Downtown alleys shall comply with the City's specific requirements for pavers. II. Special Conditions A. Water Lines Not Applicable B. Sewer Lines Not Applicable C. Storm Drainage Lines and Appurtenances 1. All on -site and off -site storm drainage improvements associated with this Development, as shown on the Final Development Plan Documents, shall be completed by the Developer in accordance with said Final Development Plan Documents prior to the issuance any certificate of occupancy. Completion of improvements shall include the certification by a professional engineer licensed in Colorado that the drainage facilities which serve this Development have been constructed in conformance with said Final Development Plan Documents. Said certification shall be submitted to the City at least two weeks prior to the issuance of any certificate of occupancy in this Development. 2. The Developer shall be responsible for maintaining the structural integrity and operational functions of all drainage facilities throughout the build -out of this Development. If at any time following certification (as required pursuant to paragraph one (1) above) of said drainage facilities and during the construction of structures and/or lots within this Development the City reasonably decides that said drainage facilities no longer comply with the Final Development Plan Documents, the City shall give written notice to the Developer of all items which do not comply with the Final Development Plan Documents. Unless the Developer successfully appeals the decision of non-compliance, it shall bring such facilities back up to the standards and specifications as shown on the Final Development Plan Documents. Failure to maintain the structural integrity and operational function of said drainage facilities following certification shall result in the withholding of the issuance of additional building permits and/or certificates of occupancy until such drainage facilities are repaired to the operational function and structural integrity which was approved by the City. 3. The Developer agrees to provide and maintain erosion control improvements as shown on the Final Development Plan Documents to stabilize all over - lot grading in and adjacent to this Development. The Developer shall also be required to post a security deposit in the amount of $10,026.00 prior to beginning construction to guarantee the proper installation and maintenance of the erosion control measures shown on the Final Development Plan Documents. Said security deposit(s) shall be made in accordance with the criteria set forth in the City's Storm Drainage Design Criteria and Construction Standards (Criteria). If, at any time, the Developer fails to abide by the erosion control provisions of the Final Development Plan Documents or the erosion control provisions of the Criteria after receiving notice of the same or an emergency situation exists which would reasonably require immediate mitigation measures, then, in either event, and notwithstanding any provisions contained in paragraph III(J) to the contrary, the City may enter upon the Property for the purpose of making such improvements and undertaking such activities as may be necessary to ensure that the provisions of said plans and the Criteria are properly enforced. The City may apply such portion of the security deposit(s) as may be necessary to pay all costs incurred by the City in undertaking the administration, construction, and/or installation of the erosion control measures required by said plans and the Criteria. In addition, the City shall have the option to withhold building permits and certificates of occupancy, as stated in Paragraph III.D of this Agreement, as it deems necessary in order to ensure that the Developer installs and maintains the erosion control measures throughout the build -out of this Development. 4. It is important that all lots be graded to drain in the configuration shown on the Final Development Plan Documents. For this reason the following requirements shall be followed for all buildings/structures on all lots: Prior to the issuance of a certificate of occupancy for any lot or building the Developer shall provide the City with certification that the lot and or the building has been graded correctly. This grading certification shall demonstrate that the lot or building finish floor elevation has been built in accordance with the elevation specified on the Final Development Plan Documents. The certification shall also show that the minimum floor elevation or minimum opening elevation for any building constructed is in compliance with the minimum elevation as required on the Final Development Plan Documents. The certification shall demonstrate as well that any minor swales adjacent to the building or on the lot have been graded correctly and in accordance with the grades shown on the Final Development Plan Documents. The certification shall also show that the elevations of all comers of the lot are in accordance with the elevations shown on the Final Development Plan Documents. Said certification shall be completed by a Colorado licensed professional engineer and shall be submitted to the City at least two weeks prior to the date of issuance of the desired certificate of occupancy. 5. The Developer shall obtain the City's prior approval of any changes from the Final Development Plan Documents in grade elevations and/or storm drainage facility configuration that occur as a result of the construction of houses and/or development of lots, whether by the Developer or other parties. The City reserves the right to withhold the issuance of building permits and certificates of occupancy for this Development until the City has deemed such changes as being acceptable for the safe and efficient delivery of storm drainage water. 6. The Developer shall limit the construction of the off -site storm drainage improvements to the limits of construction as shown on the Final Development Plan Documents. The contractor shall re -seed and/or restore all areas that are disturbed during construction of the off -site storm drainage improvements in accordance with the Final Development Plan Documents promptly following construction. The Developer shall ensure that no negative impact occurs to the adjoining properties during the construction of these facilities. No grading shall be done outside of the approved areas as shown on the Final Development Plan Documents. 7. The Developer shall be responsible for maintenance of all storm drainage facilities that are constructed outside of the public right-of-way per the Standard Operating Procedures attached in Exhibit "B". D. Streets. 1. No street oversizing reimbursement from the City is due the Developer for this Development. 2. Notwithstanding any provision herein to the contrary, the Developer shall be responsible for all costs for the initial installation of traffic signing and striping for this Development, including both signing and striping related to the Developer's internal street operations and the signing and striping of any adjacent or adjoining local, collector or arterial streets that is made necessary because of the Development. 3. Following completion of all public infrastructure improvements, the Developer shall continue to have responsibility for maintenance and repair of said improvements in accordance with Sections 2.2.3, 3.3.1 and 3.3.2 of the Land Use Code of the City. E. Natural Resources 1. Prior to the commencement of any development activities within the Limits of Development (L.O.D.), the Developer shall relocate or eradicate any prairie dogs inhabiting any portions of the site using City -approved methods as set forth in Chapter 4 of the City Code. If prairie dogs are present, fumigation is best done between late April and early June and relocation shall occur prior to March 1 or after May 31 of any given year. F. Soil Amendment 1. In all areas associated with this Development that are to be landscaped or planted in accordance with the Final Development Plan Documents, and do not require a building permit, the soils shall be loosened and amended by the Developer in accordance with Section 3.8.21 of the Land Use Code prior to the issuance of any certificate of occupancy in this Development. Completion of soil amendments shall include certification by the Developer that the work has been completed. This certification shall be submitted to the City at least two (2) weeks prior to the date of issuance of any certificate of occupancy in this Development. G. Ground Water, Subdrains and Water Rights 1. The City shall not be responsible for, and the Developer (for itself and its successor(s) in interest) hereby agrees to indemnify and hold harmless the City against any damages or injuries sustained in the Development as a result of ground water seepage or flooding, structural damage, or other damage unless such damages or injuries are proximately caused by the City's negligent operation or maintenance of the City's storm drainage facilities in the Development. However, nothing herein shall be deemed a waiver by the City of its immunities, defenses, and limitations to liability under the Colorado Governmental Immunity Act (Section 24-20-101 CRS, et. seq.) or under any other law. 2. If the Development includes a subdrain system, any such subdrain system, whether located within private property or within public property such as street rights -of -way or utility or other easements, shall not be owned, operated, maintained, repaired or reconstructed by the City and it is agreed that all ownership, operation, maintenance, repair and reconstruction obligations shall be those of the Developer or the Developer's successor(s) in interest. Such subdrain system is likely to be located both upon private and public property and, to the extent that it is located on public property, all maintenance, operation, repair or reconstruction shall be conducted in such a manner that such public property shall not be damaged, or if damaged, shall, upon completion of any such project, be repaired in accordance with then existing City standards. The City shall not be responsible for, and the Developer, for itself and its successor(s) in interest, hereby agrees to indemnify and hold harmless the City against any damages or injuries sustained in the Development as the result of groundwater seepage or flooding, structural damage or other damage resulting from failure of any such subdrain system. 3. Without admitting or denying any duty to protect water rights, the Developer, for itself and its successor(s) in interest, hereby agrees to indemnify and hold harmless the City against any damages or injuries to water rights caused, directly or indirectly by the construction, establishment, maintenance or operation of the Development. 4. The City agrees to give notice to the Developer of any claim made against it to which the foregoing indemnities and hold harmless agreements by the Developer could apply, and the Developer shall have the right to defend any lawsuit based on such claim and to settle any such claim provided the Developer must obtain a complete discharge of all City liability through such settlement. Failure of the City to give notice of any such claim to the Developer within ninety (90) days after the City first receives notice of such claim under the Colorado Governmental Immunity Act for the same, shall cause the forgoing indemnities and hold harmless agreements by the Developer to not apply to such claim and such failure shall constitute a release of the foregoing indemnities and hold harmless agreements as to such claim. H. Hazards and Emergency Access 1. No combustible material will be allowed on the site until a permanent water system is installed by the Developer and approved by the City. 2. Prior to beginning any building construction, and throughout the build -out of this Development, the Developer shall provide and maintain at all times a reasonable accessway to each building. Such accessway shall be adequate to handle any emergency vehicles or equipment, and the accessway shall be kept open during all phases of construction. Such accessway shall be constructed to an unobstructed width of at least 20 feet with 4 inches of aggregate base course material compacted according to city standards and with an 100 foot diameter turnaround at the building end of said accessway. The turnaround is not required if an exit point is provided at the end of the accessway. Prior to the construction of said accessway, a plan for the accessway shall