DEVELOPMENT CONSTRUCTION PERMIT
Permit Number. 1 t' — Issuance Date: L, f 3o-zol�
Project Name: Story Book Third Filing
Project A.K.A.:
Project Location: Northeast of Mountain Vista Drive and Little John Lane
Permittee: Nick Galluzzo, Midtowns Homes at Storybook, LLC
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 400.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 492270
Total $ 4,322.70
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 43,577.25
Form of security deposited with the City: * LV to 0 S` d D 34(
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
Development Construction Permit, Page 2/6
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project (utility
plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study,
drainage report, plat easements and any other official documents), shall be kept on the development
site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant may
apply for an extension by reapplication at least two weeks prior to the expiration date. Such
application shall contain information sufficient to justify the granting of the extension. An
extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained in
the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior to
the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements are
completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Constl action Permit, PaLIe 3'
planrlec.l construction on this project. All required perimeter silt fencing and other erosion; sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including gradim)) shall be started in State High vay right-of-\wav tlt]til a prrnlit i;
s;u_d h.v the Colorado Department of "Transportation to allow such work to begin.
'_ t)th�r conditions:
Pcrmittee's acknowledrrnent signature:
H\ sir�nin`, -this permit 1 acknowledges that 1 am acting with the I:nowled �c, consent. uld ctuthorit� ul
the km Ilas ol`tllC prol]ei'tl' (II]CluChl]g al I cm-Nmers 1laving legal or equitable interest in the real property. as
kicl mcd in Section 1-2ofthe City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) Without whose consent and authority the
rcqucsted action could not Iavvf illy be accomplished. Pursuant to said authority, I hereby perlllit City
011ic1a1s to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
oI.k. I also acl:now ledue that 1 have read this permit document with all its requirements and
ronclitiuns. and 1 a-ree to all of the terms and c%oi1tions�vJso stated in this permit.
\ppilcmil Prolm .Mana,er, s Sir�nature.
Date.
: --
����
-IpJI1'(11'(!I,(J!' (SAW(MC'C:
c
t� l.n`inecr '�pprova1�^"�" ~.. — ` Date:
(P�,rmit ]sst ance Date)
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
City Staff Contact Persons:
Development Engineer: Andrew S. Gingerich, P.E.
281 North College Avenue, Fort Collins, CO 80524
970 221-6603
Construction Inspector: Steve Cicione
281 North College Avenue, Fort Collins, CO 80524
970 692-4418
Current Planner: Lindsay Ex
281 North College Avenue, Fort Collins, CO 80524
970 416-2283
Water Utilities Engineer:
Erosion Control Inspector:
Roger Buffington
700 Wood Street, Fort Collins, CO 80521
970 221-6854
Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
970 218-2932
Natural Resources: Lindsay Ex
281 North College Avenue, Fort Collins, CO 80524
970 221-6143
Traffic Operations: Joe Olson
626 Linden Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
970 221-6815
Forestry: Tim Buchanan
Development Construction Permit, Page 5/6
215 N Mason Street, Fort Collins, CO 80524
970 221-6641
Light and Power: Doug Martine
700 Wood Street, Fort Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Project Manager: Blaine Rappe, Manager
Midtown Homes at Storybook, LLC
1043 Eagle Drive, Loveland, CO 80537
Office: 970-667-7000 x 104
Fax:970-635-2514
Email: brappe@lovelandcommercial.com
Developer: Midtown Homes at Storybook, LLC
1043 Eagle Drive, Loveland, CO 80537
Office: 970-667-7000 x 104
Fax: 970-635-2514
Email: ngalluzzo@lovelandcommercial.com
Owner(s): Midtown Homes at Storybook, LLC
1043 Eagle Drive, Loveland, CO 80537
Office: 970-667-7000 x 104
Fax: 970-635-2514
Email: ngalluzzo@lovelandcommercial.com
Planner: Michael McBride
BHA Design, Inc.
1603 Oakridge Drive
970-223-7577
mrncbride@bhadesign.com
Project Engineer: Jerry Robinson
Stewart and Associates
PO Box 429
Fort Collins, CO 80522
970-482-9331
jerryrobinson@frii.com
Development Construction Permit, Page 6/6
General Contractor: Mark Von Ronk
Connell Resources, Inc.
7785 Highland Meadows PKWY #100
Fort Collins, CO 80528
Office: 970-223-3151
mvanronk@connellresources.com