Loading...
HomeMy WebLinkAboutFORT COLLINS COLORADO TEMPLE - Filed E-ELEVATION PLAN - 2014-02-210 A 04 40 !V J C SI 0 ARCHITECTURA CONC METAL WIINDC WITH ARTC A a .ca 0 N co 0 N 6) 1/8" = 1'-0" 1 I 2 I 3 I 4 I 5 Lfl GENERAL NOTES - BUILDING ELEVATION :3 1. UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT. 2 INSTALL A RECESSED FIRE DEPARTMENT KNOX BOX BY EACH OF THE THREE KEYED ENTRY DOORS FINISH SHALL MATCH ADJACENT MATERIAL. PAINTED FIBERGLASS Architectural NEXUS, Inc. 2505 East Parleys Way Salt Lake City, UT 84109 T 801 924 5000 f 801 924 5001 http://www.archnexus.o3m /F COLOR�, ,`� M� �O� a BEN -k v0 NRE�SE9 t- AR00403p9� 4V < 4Z /c,FNSED Q� C ._ N 00 O i N O -0 M —j L. p 00 O L O O _U �' L — O r �o 70 U N CA C/) 00 C4 �C .C: o 'C t " O U. O U Yr. � r O LL. NEXUS PROJECT # 11080 CHECKED BY Checker DRAWN BY Author DATE September 11, 2013 SHEET CONTENTS BUILDING ELEVATIONS 000 Aml I:-163 26-99 151 0 a m N C6 77 tV co N W m 1 2 3 4 5 A O► La.. PAINTED FIBERGLASS STATUE A /0 1/8" = 1.-0" GENERAL NOTES - BUILDING ELEVATION 1. UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR. CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT 2. INSTALL A RECESSED FIRE DEPARTMENT KNOX BOX BY EACH OF THE THREE KEYED ENTRY DOORS FINISH SHALL MATCH ADJACENT MATERIAL VVI 1 rl MR I ULAJD, I 1 r. in x C Architectural NEXUS, Inc. 2505 East Parleys Way Salt Lake City, UT 84109 T 801 924 5000 f 801 924 5001 Of CpCO\ BE AMI p * SCHREITER ARC.00403090 \�C� l7 -10 is A40 SFD ARG�/ .0 a) N >% tv 00 O o ICU 00 O O N 'L. .; �0 O =� " 0) O U (n M � � M — o U .C: O 'C O OLL r L U L) � s O LL NEXUS PROJECT # 11080 CHECKED BY Checker DRAWN BY Author DATE September 11, 2013 SHEET CONTENTS BUILDING ELEVATIONS 000 Am2 F -16.,3 E 6 A' 9 9 a D 1-413 wil MA SLATE F ARCHITECTURAL PREi CONCRETE, METAL WINDOW SY; WITH ARTGLASS, 1 E PAINTED FIBERGLASS STATUE 3 C! 5 GENERAL NOTES - BUILDING ELEVATION 1. UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR. CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT. 2. INSTALL A RECESSED FIRE DEPARTMENT KNOX BOX BY EACH OF THE THREE KEYED ENTRY DOORS. FINISH SHALL MATCH ADJACENT MATERIAL. MORONI BASE A--� 2—D4' - 0`.I T.O. TOWER GABLE _n 187'-1" v TOWER PARAPET 02 /1 178 - 5" -�M _ WINDOW GRATE HIGH n 16T -10" `I WINDOW GRATE MID 159' -10"—V WINDOW GRATE LOW /1 15U--10",� UPPER TOWER � -146' -1" v T.O. LOWER TOWER WALL 139' - 6" T 0. PARAPET 02 n 130' - 8" ROOF ACCESS PLATFORMS n 128' - 8" v MAIN FLOOR AL 100, - 0- 0" in 7 X al Architectural NEXUS, Inc 2505 East Parleys Way Salt Lake City, UT 84109 T 801 924 5000 f 801 924 5001 http://www.archnexus com pF Cok,, �P BEI�AMIN,� p * �S{CHR ITER ARC.00403090 ti i� l� 2o-L3 V ARG�\� _^W C W co � 00 O $°,' o —0 CC J CO O O 0 rn V �' i O O� .� L N O O U o ii) M 00 , — o U .C: o O O = L LL U U L O ~ LL NEXUS PROJECT # 11080 CHECKED BY Checker 000 A.3 1 /8" = 1'-0" DRAWN BY Author ADATE September 11, 2013 SHEET CONTENTS BUILDING ELEVATIONS 71 LO 10, LID N 000 co O N O ■ F'-16:3 t699 E S9 0 1 J 9 L� C A i 71 LO 0 N cM a N 0) IVIL I ML VV1111JUVV J 1 J 1 LIVI WITH ARTGLASS, TYP. 2 P n 5 2. GENERAL NOTES - BUILDING ELEVATION UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT INSTALL A RECESSED FIRE DEPARTMENT KNOX BOX BY EACH OF THE THREE KEYED ENTRY DOORS FINISH SHALL MATCH ADJACENT MATERIAL C Architectural NEXUS, Inc. 2505 East Parleys Way Salt Lake City, UT 84109 T 801 924 5000 f 801 924 5001 hftp://www.archnexus.com !1 BASE 204' - 0" � � pF C 0t ��90 B JAMIN p * SCHREITER 1k ARC.00403090 1` 1�-7D 13 ��V �SFD ARG�\ GABLE_ 187' - 1" LII PET 02 /1 178' - 5" � V'EHIG E HIGH /1 v ATE MID 59' -10" V rE L0 50 60' -10" TOWER /1 146'-1"Z7 R WALL /1 13�9' - 6��1 S PLATFORMS 128'-8-8"" RECAST FLOOR I1 100'-0-0�C� _^W W � Go 0 a. N CID q w L. QO O -0 0 O v i O 0 4) O 0 U N ooy U) N ' 00 N •� o U L O 0LL L U U r 0 LL NEXUS PROJECT # 11080 CHECKED BY Checker DRAWN BY Author DATE September 11, 2013 SHEET CONTENTS BUILDING ELEVATIONS 000 AA F-163 2699 1 2 3 4 1 5 GENERAL NOTES - BUILDING ELEVATION N 1 UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR. CONTRACTOR SHALL SUBMIT PAINT r FD KNOX BOX SECONDARY ROOF COLOR FOR APPROVAL BY ARCHITECT. 4. DRAIN DOWNSPOUT IU EIFS _T.O. MASONRY WALL — EIFS T.0 MASONRY WALL 51 I D DOUBLE LEAF METAL 112' - 112' 0" GATES (SEE C1/AS501) — — T 0 ENCLOSURE WALL L1 _ - _ T 0. ENCLOSURE WALL STONE 108' 0" �7 STONE 108' - t 1 . STONE SCREEN WALL IFGROUNDS BUILDING FLOOR l M " GROUNDS BUILDING FLOOR Architectural NEXUS, Inc `7 1000„-�7 2505 East Parleys Way 1 --- L 09 1 -- _ ___ L --- 1DD' D" U —I] T81a924500 f80192lt Lake City, LIT 145001 — — — — - - C—=--=---------�---_--- --- —I--------------- [—]-------------------------------- GAS METER -------------------------------- HOSE REEL http-//www.archnexus.com SIGNAGE FOR "WASTE" & BOLLARDS "RECYCLING" (SEE SPECS). OF C0� E2 GROUNDS BUILDING EAST ELEVATION INSIDE SCREEN WALL �� o E1 GROUNDS BUILDING NORTH ELEVATION INSIDE SCREEN WALL o A5 1/8" = 1'-0.1 �P B art °� * SCHREITER I EIFS ARC.004030 G G� f�-7v-13 � EIFS — _T.O. MASONRY WALL _ — T.O. MASONRY WALL �tiSF p � 112'-0" 7 112'-0" V STONE o STONE T.O. ENCLOSURE WALL T.0 ENCLOSURE WALL L1 - 108'-0" 1 108'-0�" EARTH BERM R C GROUNDS BUILDING FLOOR I — _ �_ — _ _ _ _ _ GROUNDS BUILDING FLOOR 100- 0" `7 100' - 0�I C�—=-1C-------------------------------------------� _W D1 GROUNDS BUILDING NORTH EXTERI E V TION D4 GROUNDS BUILDING EAST EXTERIOR ELEVATION N OOo A.5 1/8" = 1'-0"1,00IA.5 1/8" = 1'-01, ^, W � `— '0 00 L. N O °' o EIFS - - - - T.O. MASONRY WALL EIFS _ _ _ T.O. MASONRY q 00 J O „-�7 112-0 STONE T.O.0 cc ENCLOSUREIWALL f" STONE T.O. ENCLOSURE WALL n L w am O 108'-0° EARTH BERM 108 0 STONE SCREEN WALL O 'i .^ p " GAS METER EMO V V r , N R _ _ _ _ _ - _ _ I _ GROUNDS BUILDING FLOOR GROUNDS BUILDING FLOOR V 00 .0 00 ---------- ----------------------- 100'0" M C4 . L L-------------------I 1000 1---------- d r O . — O C C1 GROUNDS BUILDING SOUTM EXTERIOR ELEVATION C4 GROUNDS BUILDING WEST EXTERIOR ELEVATION B 000 A.5 1/8" = 1'-0" 000 A.5 1/8" = 1'-O" O U U STONE _ — — — — — STONE T.O. UTILIT108'A L — �-a — — T 0 UTILIT108WALL O ~ EARTH BERM LL EARTH BERM i. MECHANICAL ENCLOSURE FLOOR _ — — — �_ _ _ MECHANICAL ENCLOSURE FLOOR /1 # REVISIONS — — —�— — — — — �-- — — — — — — — 100' - 0" — — 100-0, I I T MECHANICAL ENCLOSURE LOWER I MECHANICAL ENCLOSURE LOWER — — — — — — — — — — — r — — — — — FLOOR Ll — — — — — —I— — — — — F9 ��� 94' - 0" " B1 MECHANICAL ENCLOSURE NORTH EXTERIOR ELEVATION B4 MECHANICAL ENCLOSURE EAST EXTERIOR ELEVATION 000 A.5 1/8" = 1'-01, 000 Al 1/8" = 1'-01, e NEXUS PROJECT # 11080 STONE STONE CHECKED BY Checker T.O. UTILITY WALL _ T 0 UTILITY WALL A 108' 0" " -`7 DRAWN BY Author 1081 DATE September 11, 2013 EARTH BERM EARTH BERM SHEET CONTENTS sr _ MECHANICAL ENCLOSURE FLOOR MECHANICAL ENCLOSURE FLOOR I1 BUILDING 100'-01, 100,-0" ELEVATIONS g_----i I ------- Q MECHANICAL ENCLOSURE LOWER I MECHANICAL ENCLOSURE LOWER �rn I -FLOOR - _ _ _ - — _ _ FLOOR - - - - - - - 9- 0 L- - - - - - - - 1 __- - 000 M Al MECHANICAL ENCLOSURE SOUTH EXTERIOR ELEVATION A4 MECHANICAL ENCLOSURE WEST EXTERIOR ELEVATION 000 A 5 1/8" = 1'-01, 2 A.5 1/8" CID Am5 F'163 1699 1 1 2 3 4 1 5 1 0 r, a f CK 0 N 1 4. C 0 1RCHITECTURAL GRADE SHINGLES :IFS ACCENT BAND :IFS ;AST STONE 4ASONRY r, 7 X aj Architectural NEXUS, Inc 2505 East Parleys Way Salt Lake City, UT 84109 T 801 924 5000 f 801 924 5001 http://www.archnexus.com of COZO�P 9 co BE JAMIN p * CHREITER ARC.00403090 AR��\� ,C Q� N M 0 I L CO MID 0 O �", v �, O 0 O 70 O U o (/) 0 N , - O .C: O O 0 L L IL U s 0 NEXUS PROJECT # 11080 CHECKED BY Checker DRAWN BY Author DATE September 11, 2013 SHEET CONTENTS BUILDING ELEVATIONS 000 Am6 F-163 2699