Loading...
HomeMy WebLinkAboutBANNER HEALTH MEDICAL CAMPUS - Filed E-ELEVATION PLAN - 2013-10-07O1A aD NO !V Q METAL PANEL — fMETAL FENCE AND T.O. PARAPET SECURITY GATE - _I 59,_8" T.O. ROOF LEVEL LEVEL 2 15.4,E - B.O. CANOP 14'-0" LEVEL 1 _ D'-0i. BUILDING MOUNTED SIGNAGE AMBULANCE DROP-OFF CANOPY T.O. PARAPET T.O. ROOF - _L- LEVEL 48'_0" CAN SIGN LEVEL 3 32,_O,r 2 B.O. CANOPY { 14'-0" LEVEL 1 ) 0 ro - EIFS, COLOR 1 EIFS, COLOR 2 `MASONRY, TYPE 1A METAL PANEL CURTAIN WALL MASONRY, TYPE 1 STOREFRONT WINDOW - — - MASONRY PARAPET CAP - — - MASONRY, TYPE 2A �7METAL PANEL CANOPY ME_TAL PANEL MECHANICAL - — - — - — SCREEN BEYOND (TYP.) MASONRY PARAPET CAP - -- — - —- —— --- - CURTAIN WALL MASONRY PARAPET CAP MASONRY, TYPE 1 METAL PANEL MASONRY, TYPE IA ROOF TOP MECHANICAL SCREEN MASONRY, TYPE 2 STOREFRONT STOREFRONT WINDOW - - — - — - - — - — - — - — - — - — - - - - MASONRY, TYPE 2A CURTAIN WALL - METAL PANEL - MASONRY, TYPE IA - MASONRY, TYPE 1 - STO-Nf r METAL PANEL I BUILDING MOUNTED SIGNAGE CURTAIN WALL METAL PANEL MASONRY PARAPET CAP - — - - CURTAIN WALL STONE —METAL PANEL - — - — - - — — - — - — - — - — - — - — - - — — - — - - - - ----- --- ------------- --METAL PANELMECHANICAL SCREEN ---—--—-—- - — - - —- - CURTAIN WALL METAL PANEL CANOPY MASONRY, TYPE 1 METAL PANEL STOREFRONT -�' �- - -----—-—-—-—- — - — - —- - - MASONRY, TYPE IA --—-—-—-— - - — - —- MASONRY PARAPET CAP r r �N MASONRY, TYPE 1 BUILDING MOUNTED SIGNAGE CURTAIN WALL EIFS, COLOR 2 S AREA REPRESENTS THE PORTION OF THE- ILDING THAT WILL BE BUILT AS A PART OF PHASE 1 :ER TO SHEET 7, 8 & 9 FOR MORE DETAILED PHASE :NATIONS FOR THIS AREA. h fall r3K+X�P"`a: .. µlft"�tp+�� f�l '� UMI/i!38U aftn. ..rys..w:re,n+,mw ee,c na�.iea awy+.�k«rmx .w > MASONRY, TYPE 1 MASONRY, TYPE 1 MASONRY, TYPE IA METAL PANEL MASONRY, TYPE lA EIFS, COLOR 1 MASONRY, TYPE 2 SUNSHADE FIN MASONRY PARAPET CAP STOREFRONT WINDOW _— _MECHANICAL SCREEN — - — -1- - FINAL PLAN NOTES 1. THESE ELEVATIONS ARE REPRESENTATIVE OF THE FULL BUILD FOR THE BANNER HARMONY MEDICAL CENTER TO ESTABLISH THE ARCHITECTURAL CHARACTER OF THE BUILDING MASSING AND MATERIALS. 2. REFER TO SHEETS 7 -13 FOR THE PORTION OF THE BUILDING THAT WILL BE DEVELOPED AS A PART OF PHASE 1. 3. THE CORRESPONDING PHASE 1 ELEVATIONS, WITHIN THE CONTEXT OF THE FULL BUILD, HAVE BEEN OUTLINED BY DASHED WHITE LINES ON SHEETS 1 & 2. 4 SIGNAGE IS NOT APPROVED THROUGH THE FINAL PLAN, ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN PERMIT FOR APPROVAL AREA REPRESENTS THE PORTION OF THE_ )ING THAT WILL BE BUILT AS A PART OF PHASE R TO SHEET 7 FOR MORE DETAILED PHASE 1 ATIONS FOR THIS AREA. METAL PANEL CANOPY FOR STAFF ENTRANCE AND BIKE PARKING METAL PANEL ROOF TOP MECHANICAL SCREEN SUNSHADE, TYPICAL AT ALL MASONRY PARAPET CAP WEST FACING PATIENT ROOMS Banner Health' FINAL PLAN BANNER HEALTH MEDICAL CAMPUS HARMONY RD. & LADY MOON DR_ FORT COLLINS, COLORADO BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 FULL BUILD - ELEVATIONS BHA Design Incorporated SHE ET: 1 O_ F 13 � Fort Ours, a Drive Fort Collins, Colorado 80525 SEPTEMBER 20, 2013 voice. 970.223.7577 182 77 1827 g-100 2 37 R: z Eq N O m 014 CD '11111011 T.O. ROOF SCREEN N v 146 - 7 1/2" (D&T) 01 01 r 1 PARAPET (D&T 3) 133' - 8" FLOOR " 115' - 4 FLOOR 1 (4910.251) 100' -0 � EAST ELEVATION - SOUTH D&T 10 OF 13 1/8" = 1'-0" T.O. ROOF SCREEN � 146' 71/2" (D&T) PARAPET D&T 3 133' 8" - -- -� FLOOR 2 �115' - 4" �FLOOR 1 (4910.25') 100' -01, EAST ELEVATION - NORTH D&T 10 OF 13 1/8" = V-0" EAST ELEVATION - BED TOWER 10 OF 13 1/8" = V-0" PARAPET ( BED TOWER 3) 133' - 0" FLOOR 2� 115' - 4" LOW CANOPY ROOF 112' - 0" FLOOR 1(4910.25' 100' - 0" EXTERIOR ELEVATIONS - MATERIAL LEGEND ST ) STONE VENEER (COLOR AND FINISH TBD) CMU BLOCK VENEER (DARK COLOR AND FINISH TBD) BLlI (SEE SHEET 12 FOR COURSING DETAIL) BL2) CMU BLOCK VENEER (LIGHT COLOR AND FINISH TBD) (SEE SHEET 12 FOR COURSING DETAIL) SF1) SPLIT FACE VENEER ( DARK COLOR AND FINISH TBD ) (SEE SHEET 13 FOR COURSING DETAIL) SPLIT FACE VENEER ( LIGHT COLOR AND FINISH TBD ) SF2 (SEE SHEET 13 FOR COURSING DETAIL) MPlI ZINC METAL PANEL (WALL) MP2) PREFINISHED METAL PANEL (SCREEN) EIFS-1 EIFS (LIGHT COLOR AND FINISH TBD) EIFS-� EIFS (DARK COLOR AND FINISH TBD) MC) METAL PARAPET CAP PC I PRECAST CONCRETE PARAPET CAP (COLOR AND FINISH TBD) RM 1 ROOF MEMBRANE SS ,I METAL PANEL CANOPY ROOF FASCIA SSI) VERTICAL SUN SHADE SS2) HORIZONTAL SUN SHADE SS3) VERTICAL GLASS SHADE (GV ) VISION GLAZING GS) SPANDREL GLAZING HORIZONTAL CONTROL JOINT PROVIDE CUSTOM SEALANT COLOR TO GI MATCH VENEER. SEE DETAILS: BLOCK: EIFS: VERTICAL CONTROL JOINT C1 PROVIDE CUSTOM SEALANT COLOR TO MATCH VENNER. SEE DETAILS: BLOCK: EIFS: nwc VLEVATON K" RAN 2 FULL BUILD rf��eE i O 1 3 F-1 FULL BUILD FULL PROJECT BUILD NORTH E VAGE IS NOT APPROVED THROUGH THE FINAL N. ALL SIGNAGE WLL RECEIVE A SEPARATE J PERMIT FOR APPROVAL Banner Health® F■ NAM, � P N BANNER HEALTH MEDICAL CAMPUS HARMONY Rom. $ LADY MOON DR. FORT COLLI NS, COLORAIDC7 BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 PHASE 1 - ELEVATIONS BHA Design Incorporated SHEET: 10 0 F 13 1603 Oakridge Drive Fort Collins, Colorado 80525 SEPTEMBER 20 2013 voice: 970.2 � fax 970223,182 77 .1827 9-100 2689 pp XH G. XG XF XD XC XB N SEE MECHANICAL IOWERS, CUNCEALEU BY MASUN NY AND Mt IAL L.UNI"tALtU BY MASUNKY AND Mt IAL PANEL ---- PANEL SCREEN WALLS -- - - SCREEN WALLS CUP EAST ELEVATION 11 OF 13 1/8" =1'-0" TOWERS, CONCEALED BEHIND METAL PANEL SCREEN WALL l CUP WEST ELEVATION 11 OF 13 1/8" = V-0" R CUP SOUTH ELEVATION 11 OF 13 1/8" =1'-0" z q i sm XF XG G. XH T.O. ROOF SCREEN (CLINIC && C 123' -10" EXTERIOR ELEVATIONS - MATERIAL LEGEND ST STONE VENEER (COLOR AND FINISH TBD) CMU BLOCK VENEER (DARK COLOR AND FINISH TBD) BW (SEE SHEET 8 FOR COURSING DETAIL) BL2 j CMU BLOCK VENEER (LIGHT COLOR AND FINISH TBD) (SEE SHEET 8 FOR COURSING DETAIL) SF1 i SPLIT FACE VENEER ( DARK COLOR AND FINISH TBD ) (SEE SHEET 9 FOR COURSING DETAIL) SPLIT FACE VENEER ( LIGHT COLOR AND FINISH TBD ) SF2 ) (SEE SHEET 9 FOR COURSING DETAIL) (FLR 1 LOW) n IMPl) 116' - 8" 7 ( M P2) EIFS-1 EIFS-� MC) OOR 1(4910.2 100' - 0" ZINC METAL PANEL (WALL) PREFINISHED METAL PANEL (SCREEN) EIFS (LIGHT COLOR AND FINISH TBD) EIFS (DARK COLOR AND FINISH TBD) METAL PARAPET CAP (, PC ) PRECAST CONCRETE PARAPET CAP (COLOR AND FINISH TBD) (RM) ROOF MEMBRANE SS) METAL PANEL CANOPY ROOF FASCIA SSl) VERTICAL SUN SHADE SS2 1 HORIZONTAL SUN SHADE SS3) VERTICAL GLASS SHADE GV) GLAZING - VISION GS 1 GLAZING - SPANDREL HORIZONTAL CONTROL JOINT PROVIDE CUSTOM SEALANT COLOR TO CJ MATCH VENEER. SEE DETAILS: BLOCK: EIFS: VERTICAL CONTROL JOINT CI PROVIDE CUSTOM SEALANT COLOR TO MATCH VENNER. SEE DETAILS: BLOCK: El FS: PRAWt ELEVATON KEY PLAN u FILL BUILD 2 PM4EE t O 1 3 � FULL BUILD FULL BUILD T PROJECT NORTH T.O. ROOF SCREEN (CLINIC & CUP T.O. ROOF SCREEN (CLINIC & CUP) I" Banner Health' F■ NAL PLAN BANNER HEALTH MEDICAL CAMPUS HARMONY RD. & LADY MOON DR. FORT COLLINS., COLORADO BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 PHASE 1 - ELEVATIONS SHEET: 11 OF 13 SEPTEMBER 20, 2013 BHA Design Incorporated ' 1603 Oakridge Dnve Fort Collins, Colorado 80525 voice: 970 223.7577 fox 970.223.1827 8-100 2689 s 4 i3l j Wvk BL-1 mpi mpi BL-2 ez-* VATIONS - MATERIAL LEGEND EER (COLOR AND FINISH TBD) (GV) VISION GLAZING < VENEER (DARK COLOR AND FINISH TBD) (GS SPANDREL GLAZING 12 FOR COURSING DETAIL) < VENEER (LIGHT COLOR AND FINISH TBD) 12 FOR COURSING DETAIL) VENEER ( DARK COLOR AND FINISH TBD) HORIZONTAL CONTROL JOINT 13 FOR COURSING DETAIL) PROVIDE CUSTOM SEALANT COLOR TO Cl MATCH VENEER. SEE DETAILS: VENEER ( LIGHT COLOR AND FINISH TBD) BLOCK: 13 FOR COURSING DETAIL) EIFS: L PANEL (WALL) VERTICAL CONTROL JOIN Cl PROVIDE CUSTOM SEALANT COLOR TO :D METAL PANEL (SCREEN) MATCH VENNER. SEE DETAILS: BLOCK: COLOR AND FINISH TBD) EIFS: COLOR AND FINISH TBD) APET CAP )NCRETE PARAPET CAP (COLOR AND FINISH TBD) IBRANE PNM I ELE VATK IEL CANOPY ROOF FASCIA KEY PLAN M UN SHADE ❑ %l- SUN SHADE FULL BUILD ;LASS SHADE O FULL FULL PROJECT BUILD BUILD NORTH AA Banner Health® IANNFO 14FALT14 mmicu cAmpu! b h 30._0" CID No N SANDBLASTED (COLOR A: TBD) C) fuse GROUNDFACE (COLOR A: TBD) F. w `o w E I m c d U N Q Y N N ILL O d U IN 1p co rn 0 00 au m GROUNDFACE (COLOR B: TBD) D SANDBLASTED (COLOR B: TBD) F] GROUNDFACE (COLOR C: TBD) 13 SANDBLASTED (COLOR C: TBD) D GROUNDFACE (COLOR D: TBD) ` \ COURSING ELEVATION CMU BLOCK 11 1/4" = V-D" SANDBLASTED (COLOR E: TBD) F-1 GROUNDFACE (COLOR E: TBD) 0 GROUNDFACE (COLOR F: TBD) SANDBLASTED (COLOR F: TBD) 17 r ;=+ GROUNDFACE (COLOR G: TBD) 1�+ SANDBLASTED (COLOR G: TBD) GROUNDFACE (COLOR H: TBD) l `I 1 HORIZONTAL WORK POINT A I HORIZONTAL WORK POINT A I 30._g„ HORIZONTAL WORK POINT B HORIZONTAL WORK POINT B I 2" 2" 1. 1. 2" 11 11 2" 11 11 2" 11 11 2" 2" VERTICAL WORK POINT B 2" VERTICAL WORK POINT A VERTICAL WORK POINT B 2" 2" 2" 701 2" I a 2" 2" - VERTICAL WORK POINT A COURSING ELEVATION CMU BLOCK 2 (BL2) Banner =1r-D" Healt F■ NAB rk NORTH BANNER HEALTH MEDICAL CAMPUS HARMONY RD. & LADY MOON DR_ FORT COLLIIVS� COLORADO BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CC) 303.499.7795 PHASE 1 — ELEVATIONS SHEET: 13 0 F 1 3 BHA Design I e Drive ed 1603 OakridgDrive Fort Collins, Colorado 80525 SEPTEMBER 20, 2013 voice: 970 223 7577 fax: 970.223 1827 8-100 2689 Go N. C) O T.O. PARAPET _ r591_81, 1 m T.O. ROOF _ 48'-0" - LEVEL 3 _ 32'-0" LEVEL 2_ 15'-4" B.O. CA_NO 14'-0" LEVEL 1_ -0- T.O. PARAPET — 59'-8" T.O. ROOF - 48'-0" LEVEL 3 32'-0" LEVEL 2 z 15'-4" B.O. CANOPY 14'-0" LEVEL 1M Or_0�� R A ro METAL PANEL EIFS, COLOR 2 SUNSHADE FIN — METAL PANEL EIFS, COLOR 1 rEIFS, COLOR 2 ---1z EIFS, COLOR 1 -, _ _ _ _ _ - - - - - — - - - - - - - - METAL PANEL EIFS, COLOR 2 - - MASONRY PARAPET CAP \ CURTAIN WALL \ z—--—-—-—-—-—-—-—-—----—-- MASONRY, TYPE 1 METAL PANEL STONE �MASONRY, TYPE 3A —----------------\- --_—_, STOREFRONTWiNDOW BEYONDMECHANICAL SCREEN :�.•yfl;• nir COURTYARD ' � C 7 HIS AREA REPRESENTS THE PORTION OF TH BUILDING THAT WILL BE BUILT AS A PART OF PHASE REFER TO SHEET 8 FOR MORE DETAILED PHASE 1 ELEVATIONS FOR THIS AREA SUNSHADES PROJECT 3' FROM FACE OF WALL (TYP.) MASONRY PARAPET CAP --\ — HORIZONTAL SUNSHADE, TYP. AT ALL SOUTH FACING PATIENT ROOMS FRONT WINDOW MASONRY PARAPET CAP STORE METAL PANEL MECHANICAL SCREEN MASONRY, TYPE 1 METAL PANEL MASONRY, TYPE 1A EIFS, COLOR 1 HORIZONTAL SUNSHADE, TYP. AT ALL SOUTH FACING PATIENT ROOMS EIFS, COLOR 1 - - — — HORIZONTAL SUNSHADE — — — — EIFS, COLOR 2 — — — — — — — METAL PANEL — — EIFS, COLOR 2 — CURTAINWALL METAL PANEL STOREFRONT WINDOW 1 ; Ll -ram_ IS AREA REPRESENTS THE PORTION OF THE_ ILDING THAT WILL BE BUILT AS A PART OF PHASE =ER TO SHEET 9 FOR MORE DETAILED PHASE 1 NATIONS FOR THIS AREA. i-- MASONRY PARAPET CAP FINAL PLAN NOTES 1. THESE ELEVATIONS ARE REPRESENTATIVE OF THE FULL BUILD FOR THE BANNER HARMONY MEDICAL CENTER TO ESTABLISH THE ARCHITECTURAL CHARACTER OF THE BUILDING MASSING AND MATERIALS. 2. REFER TO SHEETS 7 -13 FOR THE PORTION OF THE BUILDING THAT WILL BE DEVELOPED AS A PART OF PHASE 1. 3. THE CORRESPONDING PHASE 1 ELEVATIONS, WITHIN THE CONTEXT OF THE FULL BUILD, HAVE BEEN OUTLINED BY DASHED WHITE LINES ON SHEETS 1 & 2. 4. SIGNAGE IS NOT APPROVED THROUGH THE FINAL PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN PERMIT FOR APPROVAL — EIFS, COLOR 1 — EIFS, COLOR 2 — CURTAIN WALL MASONRY, TYPE 1 HORIZONTAL SUNSHADE MASONRY, TYPE 1A m — DIAGNOSTICS AND TREATMENT WALL SITS APPROXIMATELY 8D' BEYOND THE FACE OF THE CENTRAL UTILITY PLAN. SEE NORTH ELEVATION FOR OFFSET — STOREFRONT WINDOW — EIFS, COLOR 1 MASONRY, TYPE 1A �— MASONRY, TYPE 2A -- MASONRY PARAPET CAP 4 Banner Health" PENAL PLAN BANNER HEALTH MEDICAL CAMPUS HARMONY RD_ & LADY MOON DR_ FORT COLLI NS., COLORADO BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 FULL BUILD - ELEVATIONS BHA Design Incorporated SHEET: 2 O F 13 1 1603 Oakridge Dnve Fort Collins, Colorado 80525 SEPTEMBER 20 2013 voice: 970223.7577 0 t fax: 970.223.1827 g -100 2699 C> C) 1 m T.O. ROOF__ LEVEL i"'i_ LEVEL 1 Dr_D, T.O. ROOF 28'-D" EIFS, COLOR 1 STOREFRONT WINDOW WITH HORIZONTAL SUNSHADE EIFS, COLOR 2 —� MASONRY, TYPE 1 HORIZONTAL SUNSHADE MASONRY, TYPE 1A METAL PANEL CURTAIN WALL MASONRY PARAPET CAP �— MASONRY, TYPE 1 MASONRY, TYPE lA METAL PANEL MECHANICAL SCREEN — EIFS, COLOR 1 MASONRY PARAPET CAP MASONRY, TYPE 1 MASONRY, TYPE 1A CURTAIN WALL --� LEVEL 2 LEVEL 1 t., A E1 N 0 IT m ro 0 ao N s ao r WALK-IN DOOR TRASH ENCLOSURE ACCESS, METAL DOOR i— EIFS, COLOR 1 MASONRY, TYPE 1 i SUNSHADE — STOREFRONT WINDOW EIFS, COLOR 2 — I♦� � al , y , METAL PANEL MECHANICAL SCREEN BIKE PARKING UNDER METAL \ PANEL OVERHANG METAL PANEL CURTAIN WALL HORIZONTAL SUNSHADE, TYP EIFS, COLOR 1 \ EIFS, COLOR 2 \ MASONRY, TYPE 1A STOREFRONT WINDOW MASONRY PARAPET CAP MASONRY, TYPE 1 MASONRY, TYPE i MASONRY, TYPE lA MASONRY, TYPE 1A EIFS, COLOR 1 EIFS, COLOR 2 ■ MECHANICAL SCREEN MASONRY PARAPET CAP � MASONRY, TYPE 1 jIMASONRY, TYPE IA CURTAIN WALL FINAL PLAN NOTES STOREFRONT WINDOW SUNSHADE, TYP. 1. THESE ELEVATIONS ARE REPRESENTATIVE OF THE FULL BUILD OUT OF THE BANNER HARMONY MEDICAL CENTER TO ESTABLISH THE CHARACTER OF THE MASSING AND MATERIALS. 2. REFER TO SHEETS 7 -13 FOR THE PORTION OF THE BUILDING THAT WILL BE DEVELOPED AS A PART OF PHASE 1. 3. THE CORRESPONDING PHASE 1 ELEVATIONS, WITHIN THE CONTEXT OF THE FULL BUILD, HAVE BEEN OUTLINED BY DASHED WHITE LINES ON SHEETS 1 & 2. 4. SIGNAGE IS NOT APPROVED THROUGH THE FINAL PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN PERMIT FOR APPROVAL MECHANICAL SCREEN SUNSHADE, TYP. STOREFRONT WINDOW MASONRY, TYPE 1 MASONRY, TYPE 1A MASONRY PARAPET CAP TRASH ENCLOSURE WALK-IN DOOR MASONRY PARAPET CAP MASONRY, TYPE 1 MASONRY, TYPE 1A Banner Health° F ■ NAL P EMMA N BANNER HEALTH MEDICAL CAMPUS HARMONY RD_ & LADY MOON DR_ FORT COLLINS., COLORADO BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 B(DULDER, CC) 303.499.7795 FULL BUILD - ELEVATIONS BHA Design Incorporated SHEET: 3 O F 'I 3 Fort Olins, Colorado Drive � Fort Collins, Colorado 80525 SEPTEMBER 20, 2013 voice 970.223.7577 0 fax: 970 223 1827 B-100 2689 O% OD NO N O O m ri IN T. O. PARAPET 16'-0" LEVEL 2 10'-0" LEVEL 1 p,-0,- T. O. PARAPET 16'-0" LEVEL 2 - 10'-0" LEVEL 1 0'-0.. ...--..--.-----_ _-- uwr^unv nAn♦nVrnAft OPEN STAIR PARKING GARAGE - LEVEL 1 1" = 40'0 MASONRY PARAPET CAP 25 SURFACE SPACES OPEN STAIR b o, ai a t 135 SPACES ° ? CANOPY �? ABOVE my, I ENTRANCE �Iilll I I it U� ORTH OPEN STAIR G rF PARKING GARAGE - LEVEL 2 1" = 40r-0" MASONRY PARAPET CAP b IIIII I�, 0 cq 135 SPACES G' CI J I I I I I I I K,_ « b ' 11 I I I I I ti� STAIR METAL PANEL MASONRY PARAPET CAP I � MASONRY, TYRE 2 - -`-- - -- - METAL PANEL PRECAST CONCRETE, COLOR TO MATCH EIFS PLAN OR " FINAL PLAN NOTES BANNER HEALTH MEDICAL CAMPUS 1. THESE ELEVATIONS ARE REPRESENTATIVE OF THE FULL BUILD OUT OF THE BANNER HARMONY MEDICAL CENTER TO ESTABLISH THE CHARACTER OF THE MASSING AND MATERIALS. 2. REFER TO SHEETS 7 -13 FOR THE PORTION OF THE BUILDING THAT WILL BE DEVELOPED AS A PART OF PHASE 1. 3. THE CORRESPONDING PHASE 1 ELEVATIONS, WITHIN THE CONTEXT OF THE FULL BUILD, HAVE BEEN OUTLINED BY DASHED WHITE LINES ON SHEETS 1 & 2. 4 SIGNAGE IS NOT APPROVED THROUGH THE FINAL PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN PERMIT FOR APPROVAL Banner HeC11th' 'R, F ■ NAL HARMONY RD - & LADY MOON DR - FORT COLLINS, COLORADO BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 FULL BUILD - ELEVATIONS BHA Design Incorporated SHEET: 4 OF 13 401603 Oakridge Drive F80525SEPTEMBER 20, 2013 v.icis 970.2237577 fax 970.223 1827 B-100 2689 I C) 40 'ram 1 fit fin I III P. LO 0 IT 03 0 N 0 0 m 1 Banner Health® F■ NAmm BANNER HEALTH MEDICAL CAMPUS HARMONY RD. & LADY MOON DR. FORT COLLINS, COLORA�O BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 FULL BUILD - SHADOW ANALYSIS BHA Design Incorporated SHEET: 5 Ill 13 1603 Oakridge Dnv Fort Collins, Colorado 80525 SEPTEMBER 20 2013 fame 77 � fax. 97022323 182827 9 -100 2689 I, h 0 N R m 0 m t' N 0 m I I r� II Ell I i I I II I I I I I I 1 I 1 1 1 1 1 I 1 II If Banner Health® F ■ ■N■ A � BANNER HEALTH MEDICAL CAMPUS HARMONY RD_ & LADY MOON DR. FORT COLLINS, COLOR -ADO BOULDER ASSC+CIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CC) 303.499.7795 FULL BUILD - SHADOW ANALYSIS BHA Design Incorporated SHEET: 6 O F 13 Fort16 ollim, Co Drive Fort Collins, Colorado 80525 SEPTEMBER 20, 2013 iaX. 970.223 2�" B-100 2689 SIGNAGE, BY ON co *40 O C) Vale' li co F. d 0 EI m c U N Q V N LE 0 g ri 2 1 NORTH ELEVATION - EAST END 7 OF 13 1/8" = 1'-0" A A.2 B II I Pclr.l �- ) I� ]BIL- 11 � I MPl� l yam_ F-1 SF 1 _ ST Y _ ST --EI FS-2 WEST ELEVATION - NORTH END 7 OF 13 1/8" = V-0" GS !J I' I I Gis (GV) II IGVI ST ELECTRICAL FOR POWER D) (E O O CG5 I I I 11101111111 Z7 Z6 Z5 Z4 Z3 Z2 Z1 � NORTH ELEVATION - WEST END 7 OF 13 1/8" = 1'-0" PARAPET (ENTRY) 128' - 0" T.O. ROOF SCREEN (CLINIC) 123' - 6" PARAPET(FLOOR 1)_,ll 117' - 8" MPl FLOOR 1 (4910.25') n 100' -- 0" 1 PHASE 1 ELEVATON KEY PLAN 1 FULL 2 BUILD 3 PRIM I I 0 SF-2 ~ FULL FULL PROJECT BUILD BUILD NORTH T.O. ROOF SCREEN D&T 146' - 7 1/2" PARAPET (TOWER.. 2) n 143' - 8" V PARAPET (D&T 2) n 134' -- 8" 1 PARAPET(ENTRY) n 128''-0" 7 FLOOR 22 115' - 4" Is LOW CANOPY ROOF n 112' - On I FLOOR 1 (4910.25') n 100' - 0" 1 wT.O. ROOF SCREEN ell ST PARAPET (D&T 2 134' - 8" PARAPET (ENTRY) FLOOR4 115' - " PARAPET (LOW CANOPY ROOF 113' - 6" FLOOR 1 (4910.25') IS looton 0" NOTE' SIGNAGE IS NOT APPROVED THROUGH THE FINAL PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN PERMIT FOR APPROVAL Banner Health® F■ NAB P N BANNER HEALTH MEDICAL CAMPUS HARMONY RD _ & LADY MOON DR. FORT COLLIIVS� COL(=>RAE:)O BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 PHASE 1 - ELEVATIONS BHA Design Incorporated SHEET: 7 O F 13 � Fort Olin,, Colorado 80525 SEPTEMBER 20 2013 voice 77 fax: 97022323 1827 82 B-100 2689 QD to N C) Q r". I m A WEST ELEVATION - CLINIC 8 OF 13 1/8" = 1'-0" MP1- SOUTH ELEVATION - CLINIC & LOBBY 8 OF 13 1/8" =1'-0" T.O. ROOF SCREEN (CLINIC) 123r_6" 11PARAPET(FLOOR 1) 7r-8" FLOOR 1 (4910.25')_ 100' - 0" � EAST ELEVATION -CLINIC 8 OF 13 1/8" =1'-0" =f ST - T.O. ROOF SCREEN (BED TOWER 1) 146' - 1 1/2" T.O. ROOF SCREEN (BED TOWER 2) 139' - 9 1/2" PARAPET (ENTRY) 128' - 0" T.O. ROOF SCREEN (CLINIC 123' - 6" PARAPET (FLR 1 LOWW) 116' - 8" FLOOR 1 (4910.25' 100' - 0" Z7 1.5 m EXTERIOR ELEVATIONS - MATERIAL LEGEND ST I STONE VENEER (COLOR AND FINISH TBD) CMU BLOCK VENEER (DARK COLOR AND FINISH TBD) BLI) (SEE SHEET 12 FOR COURSING DETAIL) BL2 � CMU BLOCK VENEER (LIGHT COLOR AND FINISH TBD) (SEE SHEET 12 FOR COURSING DETAIL) i SF1 ! SPLIT FACE VENEER ( DARK COLOR AND FINISH TBD ) _ (SEE SHEET 13 FOR COURSING DETAIL) SF2) SPLIT FACE VENEER ( LIGHT COLOR AND FINISH TBD ) (SEE SHEET 13 FOR COURSING DETAIL) MF'I ZINC METAL PANEL (WALL) MP21 PREFINISHED METAL PANEL (SCREEN) EIFS-� EIFS (LIGHT COLOR AND FINISH TBD) EIFS-� EIFS (DARK COLOR AND FINISH TBD) MC) METAL PARAPET CAP PC I PRECAST CONCRETE PARAPET CAP (COLOR AND FINISH TBD) RM) ROOF MEMBRANE SS I METAL PANEL CANOPY ROOF FASCIA SS1 ! VERTICAL SUN SHADE SS2 I HORIZONTAL SUN SHADE SS3) VERTICAL GLASS SHADE NOTE: SIGNAGE IS NOT APPROVED THROUGH THE FINAL PLAN ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN PERMIT FOR APPROVAL PARAPET (ENTRYYY) 128' - 0" T.O. ROOF SCREEN (CLINIC) 123' - 6" PARAPET(FLOOR 1) 117' - 8" PARAPET (LOW CANOPY ROOFF� 113' - 6" FLOOR 114910.25�_ 100' - 0" GV VISION GLAZING GS SPANDREL GLAZING HORIZONTAL CONTROL JOINT PROVIDE CUSTOM SEALANT COLOR TO CJ MATCH VENEER. SEE DETAILS: BLOCK: EIFS: VERTICAL CONTROL JOINT C PROVIDE CUSTOM SEALANT COLOR TO MATCH VENNER. SEE DETAILS: BLOCK: EIFS: PHASE 7 ELEVATON KEY PLMI I Banner Health® N O R T H T PROJECT NORTH F ■ NAIL. P L.AN BANNER HEALTH MEDICAL CAMPUS HARMONY RD. & LADY MOON DR - FORT COLLINS, COLORADO BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499-7795 PHASE 1 - ELEVATIONS BHA Desig n Incorporated _ SHEET: 8 O F 13 40- 1603 Oakridge Drive SEPTEMBER 20, 2013 Fort C970.223.7 77 80525 voice 970.223.7577 fox 970.223.1827 9 -100 2689 Q CD F. C N to co 0 m cn N 0 i m J )1J.2 WEST ELEVATION 9 OF 13 1/8" = V-0" BLA K.5 ) 4 I 1 SOUTH ELEVATION - WEST BED TOWER 9 OF 13 1/8" = V-0" � SOUTH ELEVATION - EAST BED TOWER 9 OF 13 1/8" =1'-0" T.O. ROOF SCREEN O (Z 5 (BED TOWER 1) 146 -1 1/2 — — - PARAPET (TOWER 1) 144' - 8" 'ARAPET ( BED TOWER 3 133' 0" FLOOR 2 n 115' -- 4" 1 —FLOOR 1 (4910.25 100' - 0" T.O. ROOF SCREEN (BED TOWER 2) 139' - 9 1/2" PARAPET (BED TOWER 2) -- 134, - on FLOOROR 115' - 4" LOW CANOPY ROOF 112' - 0" FLOOR 1 (4910.25S ) 100' - 0" EXTERIOR ELEVATIONS - MATERIAL LEGEND ST) STONE VENEER (COLOR AND FINISH TBD) CMU BLOCK VENEER (DARK COLOR AND FINISH TBD) BLI) (SEE SHEET 8 FOR COURSING DETAIL) BL2) CMU BLOCK VENEER (LIGHT COLOR AND FINISH TBD) (SEE SHEET 8 FOR COURSING DETAIL) SF1) SPLIT FACE VENEER ( DARK COLOR AND FINISH TBD ) (SEE SHEET 9 FOR COURSING DETAIL) Sf2) SPLIT FACE VENEER ( LIGHT COLOR AND FINISH TBD ) (SEE SHEET 9 FOR COURSING DETAIL) MPl) ZINC METAL PANEL (WALL) MP2) PREFINISHED METAL PANEL (SCREEN) EIFS-1 EIFS (LIGHT COLOR AND FINISH TBD) EIFS-2 EIFS (DARK COLOR AND FINISH TBD) f MC) METAL PARAPET CAP PC) PRECAST CONCRETE PARAPET CAP (COLOR AND FINISH TBD) RM) ROOF MEMBRANE SSMETAL PANEL CANOPY ROOF FASCIA SSl) VERTICAL SUN SHADE SS2 1 HORIZONTAL SUN SHADE SS3) VERTICAL GLASS SHADE GV) GLAZING - VISION GS) GLAZING - SPANDREL T.O. ROOF SCREEN (BED TOWER 1) 146' - 1 1/2" HORIZONTAL CONTROL JOINT PROVIDE CUSTOM SEALANT COLOR TO T.O. ROOF SCREEN Cl MATCH VENEER. SEE DETAILS: BLOCK: (BED TOWER 2) EIFS: 139' - 9 1/2" VERTICAL CONTROL JOINT RAPET ( BED TOWER CJ PROVIDE CUSTOM SEALANT COLOR TO 3) MATCH VENNER. SEE DETAILS: BLOCK: 133 EIFS: FLOOR 2 115' - 4" FLOOR_ 1(4910.25) 100, - 0" PHAN 1 ELEVATON KEY PLAN FULL BUILD KNEE 1 41�= FF--1 2 3 FULL BUILD FULL BUILD C T PROJECT NORTH NOTE: SIGNAGE IS NOT APPROVED THROUGH THE FINAL PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN PERMIT FOR APPROVAL Banner Heal 'R, F ■ NAL P L.A N BANNER HEALTH MEDICAL CAMPUS HARMONY RD. & LADY MOON DR. FORT COLLI NSA COLORADO BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795 PHASE 1 - ELEVATIONS BHA Design Incorporated SHEET: 9 O F 13 0 1603 Oakridge Drive SEPTEMBER 20, 2013 Fort Collins, Colorado 80525 voice: 970.223.7577 fax 970.223 1827 9-100 2689