HomeMy WebLinkAboutBANNER HEALTH MEDICAL CAMPUS - Filed E-ELEVATION PLAN - 2013-10-07O1A
aD
NO
!V
Q
METAL PANEL —
fMETAL
FENCE AND
T.O. PARAPET
SECURITY GATE -
_I
59,_8"
T.O. ROOF
LEVEL
LEVEL 2
15.4,E -
B.O. CANOP
14'-0"
LEVEL 1 _
D'-0i.
BUILDING MOUNTED
SIGNAGE
AMBULANCE DROP-OFF
CANOPY
T.O. PARAPET
T.O. ROOF - _L-
LEVEL
48'_0"
CAN
SIGN
LEVEL 3
32,_O,r 2
B.O. CANOPY {
14'-0"
LEVEL 1 )
0
ro
- EIFS, COLOR 1
EIFS, COLOR 2
`MASONRY, TYPE 1A METAL PANEL
CURTAIN WALL MASONRY, TYPE 1
STOREFRONT WINDOW
- — - MASONRY PARAPET CAP - — -
MASONRY, TYPE 2A
�7METAL PANEL CANOPY
ME_TAL PANEL MECHANICAL - — - — - —
SCREEN BEYOND (TYP.)
MASONRY PARAPET CAP
-
-- — - —- —— ---
- CURTAIN WALL MASONRY PARAPET CAP
MASONRY, TYPE 1
METAL PANEL
MASONRY, TYPE IA
ROOF TOP MECHANICAL SCREEN MASONRY, TYPE 2
STOREFRONT STOREFRONT WINDOW
- - — - — - - — - — - — - — - — - — - - - - MASONRY, TYPE 2A
CURTAIN WALL
- METAL PANEL
- MASONRY, TYPE IA
- MASONRY, TYPE 1
- STO-Nf
r METAL PANEL
I
BUILDING MOUNTED SIGNAGE
CURTAIN WALL METAL PANEL
MASONRY PARAPET CAP
- — - - CURTAIN WALL STONE —METAL PANEL - — - — - - — — - — - — - — - — - — - — - - — — - — - - -
- ----- --- ------------- --METAL PANELMECHANICAL SCREEN ---—--—-—- - — - - —- -
CURTAIN WALL METAL PANEL CANOPY MASONRY, TYPE 1 METAL PANEL STOREFRONT
-�' �- - -----—-—-—-—- — - — - —- - - MASONRY, TYPE IA --—-—-—-— - - — - —- MASONRY PARAPET CAP
r r
�N
MASONRY, TYPE 1
BUILDING MOUNTED SIGNAGE
CURTAIN WALL
EIFS, COLOR 2
S AREA REPRESENTS THE PORTION OF THE-
ILDING THAT WILL BE BUILT AS A PART OF PHASE 1
:ER TO SHEET 7, 8 & 9 FOR MORE DETAILED PHASE
:NATIONS FOR THIS AREA.
h fall
r3K+X�P"`a: .. µlft"�tp+�� f�l '� UMI/i!38U aftn. ..rys..w:re,n+,mw ee,c na�.iea awy+.�k«rmx .w >
MASONRY, TYPE 1 MASONRY, TYPE 1
MASONRY, TYPE IA METAL PANEL
MASONRY, TYPE lA
EIFS, COLOR 1 MASONRY, TYPE 2
SUNSHADE FIN
MASONRY PARAPET CAP STOREFRONT WINDOW
_— _MECHANICAL
SCREEN
— - — -1- -
FINAL PLAN NOTES
1. THESE ELEVATIONS ARE REPRESENTATIVE OF THE FULL BUILD
FOR THE BANNER HARMONY MEDICAL CENTER TO ESTABLISH
THE ARCHITECTURAL CHARACTER OF THE BUILDING MASSING
AND MATERIALS.
2. REFER TO SHEETS 7 -13 FOR THE PORTION OF THE BUILDING
THAT WILL BE DEVELOPED AS A PART OF PHASE 1.
3. THE CORRESPONDING PHASE 1 ELEVATIONS, WITHIN THE
CONTEXT OF THE FULL BUILD, HAVE BEEN OUTLINED BY DASHED
WHITE LINES ON SHEETS 1 & 2.
4 SIGNAGE IS NOT APPROVED THROUGH THE FINAL
PLAN, ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN
PERMIT FOR APPROVAL
AREA REPRESENTS THE PORTION OF THE_
)ING THAT WILL BE BUILT AS A PART OF PHASE
R TO SHEET 7 FOR MORE DETAILED PHASE 1
ATIONS FOR THIS AREA.
METAL PANEL CANOPY FOR STAFF
ENTRANCE AND BIKE PARKING
METAL PANEL ROOF TOP MECHANICAL SCREEN
SUNSHADE, TYPICAL AT ALL MASONRY PARAPET CAP
WEST FACING PATIENT ROOMS
Banner Health'
FINAL PLAN
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD. & LADY MOON DR_
FORT COLLINS, COLORADO
BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795
FULL BUILD - ELEVATIONS BHA Design Incorporated
SHE ET: 1 O_ F 13 � Fort Ours, a Drive
Fort Collins, Colorado 80525
SEPTEMBER 20, 2013 voice. 970.223.7577 182 77
1827
g-100 2 37
R:
z
Eq
N
O
m
014
CD
'11111011 T.O. ROOF SCREEN
N v 146 - 7 1/2" (D&T)
01
01
r
1
PARAPET (D&T 3)
133' - 8"
FLOOR "
115' - 4
FLOOR 1 (4910.251)
100' -0
� EAST ELEVATION - SOUTH D&T
10 OF 13 1/8" = 1'-0"
T.O. ROOF SCREEN
� 146' 71/2" (D&T)
PARAPET D&T 3
133' 8" - -- -�
FLOOR 2
�115' - 4"
�FLOOR 1 (4910.25')
100' -01,
EAST ELEVATION - NORTH D&T
10 OF 13 1/8" = V-0"
EAST ELEVATION - BED TOWER
10 OF 13 1/8" = V-0"
PARAPET ( BED TOWER
3)
133' - 0"
FLOOR 2�
115' - 4"
LOW CANOPY ROOF
112' - 0"
FLOOR 1(4910.25'
100' - 0"
EXTERIOR ELEVATIONS - MATERIAL LEGEND
ST ) STONE VENEER (COLOR AND FINISH TBD)
CMU BLOCK VENEER (DARK COLOR AND FINISH TBD)
BLlI (SEE SHEET 12 FOR COURSING DETAIL)
BL2) CMU BLOCK VENEER (LIGHT COLOR AND FINISH TBD)
(SEE SHEET 12 FOR COURSING DETAIL)
SF1) SPLIT FACE VENEER ( DARK COLOR AND FINISH TBD )
(SEE SHEET 13 FOR COURSING DETAIL)
SPLIT FACE VENEER ( LIGHT COLOR AND FINISH TBD )
SF2 (SEE SHEET 13 FOR COURSING DETAIL)
MPlI ZINC METAL PANEL (WALL)
MP2) PREFINISHED METAL PANEL (SCREEN)
EIFS-1 EIFS (LIGHT COLOR AND FINISH TBD)
EIFS-� EIFS (DARK COLOR AND FINISH TBD)
MC) METAL PARAPET CAP
PC I PRECAST CONCRETE PARAPET CAP (COLOR AND FINISH TBD)
RM 1 ROOF MEMBRANE
SS ,I METAL PANEL CANOPY ROOF FASCIA
SSI) VERTICAL SUN SHADE
SS2) HORIZONTAL SUN SHADE
SS3) VERTICAL GLASS SHADE
(GV ) VISION GLAZING
GS) SPANDREL GLAZING
HORIZONTAL CONTROL JOINT
PROVIDE CUSTOM SEALANT COLOR TO
GI MATCH VENEER. SEE DETAILS:
BLOCK:
EIFS:
VERTICAL CONTROL JOINT
C1 PROVIDE CUSTOM SEALANT COLOR TO
MATCH VENNER. SEE DETAILS:
BLOCK:
EIFS:
nwc
VLEVATON
K" RAN
2
FULL
BUILD
rf��eE i
O
1
3
F-1
FULL
BUILD
FULL
PROJECT
BUILD
NORTH
E
VAGE IS NOT APPROVED THROUGH THE FINAL
N. ALL SIGNAGE WLL RECEIVE A SEPARATE
J PERMIT FOR APPROVAL
Banner Health®
F■ NAM, � P N
BANNER
HEALTH
MEDICAL
CAMPUS
HARMONY Rom. $ LADY MOON DR.
FORT COLLI NS, COLORAIDC7
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795
PHASE 1 - ELEVATIONS
BHA Design Incorporated
SHEET: 10 0 F 13 1603 Oakridge Drive
Fort Collins, Colorado 80525
SEPTEMBER 20 2013 voice: 970.2
� fax 970223,182 77
.1827
9-100 2689
pp XH G. XG XF XD XC XB
N
SEE MECHANICAL IOWERS, CUNCEALEU BY MASUN NY AND Mt IAL L.UNI"tALtU BY MASUNKY AND Mt IAL PANEL
----
PANEL SCREEN WALLS -- - - SCREEN WALLS
CUP EAST ELEVATION
11 OF 13 1/8" =1'-0"
TOWERS, CONCEALED BEHIND METAL PANEL
SCREEN WALL
l CUP WEST ELEVATION
11 OF 13 1/8" = V-0"
R
CUP SOUTH ELEVATION
11 OF 13 1/8" =1'-0"
z
q
i
sm
XF XG G. XH
T.O. ROOF SCREEN
(CLINIC && C
123' -10"
EXTERIOR ELEVATIONS - MATERIAL LEGEND
ST STONE VENEER (COLOR AND FINISH TBD)
CMU BLOCK VENEER (DARK COLOR AND FINISH TBD)
BW (SEE SHEET 8 FOR COURSING DETAIL)
BL2 j CMU BLOCK VENEER (LIGHT COLOR AND FINISH TBD)
(SEE SHEET 8 FOR COURSING DETAIL)
SF1 i SPLIT FACE VENEER ( DARK COLOR AND FINISH TBD )
(SEE SHEET 9 FOR COURSING DETAIL)
SPLIT FACE VENEER ( LIGHT COLOR AND FINISH TBD )
SF2 ) (SEE SHEET 9 FOR COURSING DETAIL)
(FLR 1 LOW) n IMPl)
116' - 8" 7
( M P2)
EIFS-1
EIFS-�
MC)
OOR 1(4910.2
100' - 0"
ZINC METAL PANEL (WALL)
PREFINISHED METAL PANEL (SCREEN)
EIFS (LIGHT COLOR AND FINISH TBD)
EIFS (DARK COLOR AND FINISH TBD)
METAL PARAPET CAP
(, PC ) PRECAST CONCRETE PARAPET CAP (COLOR AND FINISH TBD)
(RM)
ROOF MEMBRANE
SS)
METAL PANEL CANOPY ROOF FASCIA
SSl)
VERTICAL SUN SHADE
SS2 1
HORIZONTAL SUN SHADE
SS3)
VERTICAL GLASS SHADE
GV)
GLAZING - VISION
GS 1
GLAZING - SPANDREL
HORIZONTAL CONTROL JOINT
PROVIDE CUSTOM SEALANT COLOR TO
CJ MATCH VENEER. SEE DETAILS:
BLOCK:
EIFS:
VERTICAL CONTROL JOINT
CI PROVIDE CUSTOM SEALANT COLOR TO
MATCH VENNER. SEE DETAILS:
BLOCK:
El FS:
PRAWt
ELEVATON
KEY PLAN
u
FILL
BUILD
2
PM4EE t
O
1
3
�
FULL
BUILD
FULL
BUILD
T
PROJECT
NORTH
T.O. ROOF SCREEN
(CLINIC & CUP
T.O. ROOF SCREEN
(CLINIC & CUP)
I"
Banner Health'
F■ NAL PLAN
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD. & LADY MOON DR.
FORT COLLINS., COLORADO
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795
PHASE 1 - ELEVATIONS
SHEET: 11 OF 13
SEPTEMBER 20, 2013
BHA Design Incorporated
' 1603 Oakridge Dnve
Fort Collins, Colorado 80525
voice: 970 223.7577
fox 970.223.1827
8-100 2689
s
4
i3l j
Wvk
BL-1
mpi
mpi
BL-2
ez-*
VATIONS - MATERIAL LEGEND
EER (COLOR AND FINISH TBD) (GV) VISION GLAZING
< VENEER (DARK COLOR AND FINISH TBD) (GS SPANDREL GLAZING
12 FOR COURSING DETAIL)
< VENEER (LIGHT COLOR AND FINISH TBD)
12 FOR COURSING DETAIL)
VENEER ( DARK COLOR AND FINISH TBD) HORIZONTAL CONTROL JOINT
13 FOR COURSING DETAIL) PROVIDE CUSTOM SEALANT COLOR TO
Cl MATCH VENEER. SEE DETAILS:
VENEER ( LIGHT COLOR AND FINISH TBD) BLOCK:
13 FOR COURSING DETAIL) EIFS:
L PANEL (WALL) VERTICAL CONTROL JOIN
Cl PROVIDE CUSTOM SEALANT COLOR TO
:D METAL PANEL (SCREEN) MATCH VENNER. SEE DETAILS:
BLOCK:
COLOR AND FINISH TBD) EIFS:
COLOR AND FINISH TBD)
APET CAP
)NCRETE PARAPET CAP (COLOR AND FINISH TBD)
IBRANE
PNM I
ELE
VATK
IEL CANOPY ROOF FASCIA KEY PLAN M
UN SHADE ❑
%l- SUN SHADE FULL
BUILD
;LASS SHADE
O
FULL FULL PROJECT
BUILD BUILD NORTH
AA
Banner Health®
IANNFO 14FALT14 mmicu cAmpu!
b h
30._0"
CID
No
N
SANDBLASTED (COLOR A: TBD)
C)
fuse
GROUNDFACE (COLOR A: TBD)
F.
w
`o
w
E
I
m
c
d
U
N
Q
Y
N
N
ILL
O
d
U
IN
1p
co
rn
0
00
au
m
GROUNDFACE (COLOR B: TBD) D
SANDBLASTED (COLOR B: TBD) F]
GROUNDFACE (COLOR C: TBD) 13
SANDBLASTED (COLOR C: TBD) D
GROUNDFACE (COLOR D: TBD) ` \
COURSING ELEVATION CMU BLOCK 11
1/4" = V-D"
SANDBLASTED (COLOR E: TBD) F-1
GROUNDFACE (COLOR E: TBD) 0
GROUNDFACE (COLOR F: TBD)
SANDBLASTED (COLOR F: TBD) 17
r ;=+
GROUNDFACE (COLOR G: TBD)
1�+
SANDBLASTED (COLOR G: TBD)
GROUNDFACE (COLOR H: TBD)
l `I
1
HORIZONTAL WORK POINT A
I
HORIZONTAL WORK POINT A
I
30._g„
HORIZONTAL WORK POINT B
HORIZONTAL WORK POINT B
I
2"
2"
1.
1.
2"
11
11
2"
11
11
2"
11
11
2"
2"
VERTICAL WORK POINT B
2"
VERTICAL WORK POINT A
VERTICAL WORK POINT B
2"
2"
2"
701
2"
I
a
2"
2"
- VERTICAL WORK POINT A
COURSING ELEVATION CMU BLOCK 2 (BL2) Banner =1r-D" Healt
F■ NAB
rk
NORTH
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD. & LADY MOON DR_
FORT COLLIIVS� COLORADO
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CC) 303.499.7795
PHASE 1 — ELEVATIONS
SHEET: 13 0 F 1 3 BHA Design I e Drive ed
1603 OakridgDrive
Fort Collins, Colorado 80525
SEPTEMBER 20, 2013 voice: 970 223 7577
fax: 970.223 1827
8-100 2689
Go
N.
C)
O T.O. PARAPET _
r591_81,
1
m T.O. ROOF _
48'-0" -
LEVEL 3 _
32'-0"
LEVEL 2_
15'-4"
B.O. CA_NO
14'-0"
LEVEL 1_
-0-
T.O. PARAPET
—
59'-8"
T.O. ROOF
-
48'-0"
LEVEL 3
32'-0"
LEVEL 2 z
15'-4"
B.O. CANOPY
14'-0"
LEVEL 1M
Or_0��
R
A
ro
METAL PANEL
EIFS, COLOR 2
SUNSHADE FIN
— METAL PANEL
EIFS, COLOR 1
rEIFS, COLOR 2
---1z
EIFS, COLOR 1 -,
_ _ _ _ _
- - - - - — - - - - - - - - METAL PANEL EIFS, COLOR 2 - -
MASONRY PARAPET CAP \
CURTAIN WALL \
z—--—-—-—-—-—-—-—-—----—--
MASONRY, TYPE 1 METAL PANEL
STONE
�MASONRY, TYPE 3A —----------------\- --_—_,
STOREFRONTWiNDOW BEYONDMECHANICAL
SCREEN
:�.•yfl;• nir
COURTYARD '
� C
7 HIS AREA REPRESENTS THE PORTION OF TH
BUILDING THAT WILL BE BUILT AS A PART OF PHASE
REFER TO SHEET 8 FOR MORE DETAILED PHASE 1
ELEVATIONS FOR THIS AREA
SUNSHADES PROJECT 3'
FROM FACE OF WALL (TYP.)
MASONRY PARAPET CAP --\
— HORIZONTAL SUNSHADE, TYP. AT
ALL SOUTH FACING PATIENT ROOMS
FRONT WINDOW
MASONRY PARAPET CAP STORE
METAL PANEL MECHANICAL SCREEN
MASONRY, TYPE 1 METAL PANEL
MASONRY, TYPE 1A EIFS, COLOR 1 HORIZONTAL SUNSHADE, TYP. AT
ALL SOUTH FACING PATIENT ROOMS EIFS, COLOR 1 -
- — — HORIZONTAL SUNSHADE — — — — EIFS, COLOR 2 — — — — — — —
METAL PANEL — — EIFS, COLOR 2 —
CURTAINWALL METAL PANEL STOREFRONT WINDOW
1 ;
Ll
-ram_
IS AREA REPRESENTS THE PORTION OF THE_
ILDING THAT WILL BE BUILT AS A PART OF PHASE
=ER TO SHEET 9 FOR MORE DETAILED PHASE 1
NATIONS FOR THIS AREA.
i-- MASONRY PARAPET CAP
FINAL PLAN NOTES
1. THESE ELEVATIONS ARE REPRESENTATIVE OF THE FULL BUILD
FOR THE BANNER HARMONY MEDICAL CENTER TO ESTABLISH
THE ARCHITECTURAL CHARACTER OF THE BUILDING MASSING
AND MATERIALS.
2. REFER TO SHEETS 7 -13 FOR THE PORTION OF THE BUILDING
THAT WILL BE DEVELOPED AS A PART OF PHASE 1.
3. THE CORRESPONDING PHASE 1 ELEVATIONS, WITHIN THE
CONTEXT OF THE FULL BUILD, HAVE BEEN OUTLINED BY DASHED
WHITE LINES ON SHEETS 1 & 2.
4. SIGNAGE IS NOT APPROVED THROUGH THE FINAL
PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN
PERMIT FOR APPROVAL
— EIFS, COLOR 1
— EIFS, COLOR 2
— CURTAIN WALL
MASONRY, TYPE 1
HORIZONTAL
SUNSHADE
MASONRY, TYPE 1A
m
— DIAGNOSTICS AND TREATMENT WALL SITS
APPROXIMATELY 8D' BEYOND THE FACE OF THE
CENTRAL UTILITY PLAN. SEE NORTH ELEVATION FOR
OFFSET
— STOREFRONT WINDOW
— EIFS, COLOR 1
MASONRY, TYPE 1A
�— MASONRY, TYPE 2A
-- MASONRY PARAPET CAP
4
Banner Health"
PENAL PLAN
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD_ & LADY MOON DR_
FORT COLLI NS., COLORADO
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795
FULL BUILD - ELEVATIONS BHA Design Incorporated
SHEET: 2 O F 13 1 1603 Oakridge Dnve
Fort Collins, Colorado 80525
SEPTEMBER 20 2013 voice: 970223.7577
0 t fax: 970.223.1827
g -100 2699
C>
C)
1
m
T.O. ROOF__
LEVEL
i"'i_
LEVEL 1
Dr_D,
T.O. ROOF
28'-D"
EIFS, COLOR 1
STOREFRONT WINDOW
WITH HORIZONTAL
SUNSHADE
EIFS, COLOR 2 —�
MASONRY, TYPE 1 HORIZONTAL SUNSHADE
MASONRY, TYPE 1A METAL PANEL
CURTAIN WALL MASONRY PARAPET CAP
�— MASONRY, TYPE 1
MASONRY, TYPE lA
METAL PANEL MECHANICAL SCREEN —
EIFS, COLOR 1
MASONRY PARAPET CAP
MASONRY, TYPE 1
MASONRY, TYPE 1A
CURTAIN WALL --�
LEVEL 2
LEVEL 1
t.,
A
E1
N
0
IT
m
ro
0
ao
N
s
ao
r
WALK-IN DOOR
TRASH ENCLOSURE ACCESS,
METAL DOOR
i— EIFS, COLOR 1
MASONRY, TYPE 1
i SUNSHADE
— STOREFRONT WINDOW
EIFS, COLOR 2 —
I♦� � al ,
y ,
METAL PANEL MECHANICAL SCREEN
BIKE PARKING UNDER METAL \
PANEL OVERHANG
METAL PANEL
CURTAIN WALL
HORIZONTAL
SUNSHADE, TYP
EIFS, COLOR 1 \
EIFS, COLOR 2 \
MASONRY,
TYPE 1A
STOREFRONT
WINDOW
MASONRY PARAPET CAP
MASONRY, TYPE 1 MASONRY, TYPE i
MASONRY, TYPE lA MASONRY, TYPE 1A
EIFS, COLOR 1
EIFS, COLOR 2 ■
MECHANICAL SCREEN
MASONRY PARAPET CAP
� MASONRY, TYPE 1
jIMASONRY, TYPE IA
CURTAIN WALL
FINAL PLAN NOTES
STOREFRONT WINDOW
SUNSHADE, TYP.
1. THESE ELEVATIONS ARE REPRESENTATIVE OF THE FULL BUILD
OUT OF THE BANNER HARMONY MEDICAL CENTER TO
ESTABLISH THE CHARACTER OF THE MASSING AND MATERIALS.
2. REFER TO SHEETS 7 -13 FOR THE PORTION OF THE BUILDING
THAT WILL BE DEVELOPED AS A PART OF PHASE 1.
3. THE CORRESPONDING PHASE 1 ELEVATIONS, WITHIN THE
CONTEXT OF THE FULL BUILD, HAVE BEEN OUTLINED BY DASHED
WHITE LINES ON SHEETS 1 & 2.
4. SIGNAGE IS NOT APPROVED THROUGH THE FINAL
PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE SIGN
PERMIT FOR APPROVAL
MECHANICAL SCREEN
SUNSHADE, TYP.
STOREFRONT WINDOW
MASONRY, TYPE 1
MASONRY, TYPE 1A
MASONRY PARAPET CAP
TRASH ENCLOSURE
WALK-IN DOOR
MASONRY PARAPET CAP
MASONRY, TYPE 1
MASONRY, TYPE 1A
Banner Health°
F ■ NAL
P EMMA N
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD_ & LADY MOON DR_
FORT COLLINS., COLORADO
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 B(DULDER, CC) 303.499.7795
FULL BUILD - ELEVATIONS
BHA Design Incorporated
SHEET: 3 O F 'I 3 Fort Olins, Colorado
Drive
� Fort Collins, Colorado 80525
SEPTEMBER 20, 2013 voice 970.223.7577
0 fax: 970 223 1827
B-100 2689
O%
OD
NO
N
O
O
m
ri
IN
T. O. PARAPET
16'-0"
LEVEL 2
10'-0"
LEVEL 1
p,-0,-
T. O. PARAPET
16'-0"
LEVEL 2 -
10'-0"
LEVEL 1
0'-0..
...--..--.-----_ _-- uwr^unv nAn♦nVrnAft
OPEN STAIR
PARKING GARAGE - LEVEL 1
1" = 40'0
MASONRY PARAPET CAP
25 SURFACE SPACES
OPEN STAIR
b
o,
ai
a
t
135 SPACES
°
?
CANOPY
�?
ABOVE
my,
I
ENTRANCE
�Iilll I I it
U�
ORTH
OPEN STAIR
G rF
PARKING GARAGE - LEVEL 2
1" = 40r-0"
MASONRY PARAPET CAP
b
IIIII I�,
0
cq
135 SPACES G'
CI
J I I I I I I I K,_
«
b '
11 I I I I I ti�
STAIR
METAL PANEL
MASONRY PARAPET CAP
I � MASONRY, TYRE 2 - -`-- - -- -
METAL PANEL
PRECAST CONCRETE, COLOR TO MATCH EIFS
PLAN
OR " FINAL PLAN NOTES BANNER HEALTH MEDICAL CAMPUS
1. THESE ELEVATIONS ARE REPRESENTATIVE OF THE FULL BUILD
OUT OF THE BANNER HARMONY MEDICAL CENTER TO
ESTABLISH THE CHARACTER OF THE MASSING AND MATERIALS.
2. REFER TO SHEETS 7 -13 FOR THE PORTION OF THE BUILDING
THAT WILL BE DEVELOPED AS A PART OF PHASE 1.
3. THE CORRESPONDING PHASE 1 ELEVATIONS, WITHIN THE
CONTEXT OF THE FULL BUILD, HAVE BEEN OUTLINED BY DASHED
WHITE LINES ON SHEETS 1 & 2.
4 SIGNAGE IS NOT APPROVED THROUGH THE FINAL PLAN. ALL SIGNAGE
WILL RECEIVE A SEPARATE SIGN PERMIT FOR APPROVAL
Banner HeC11th' 'R,
F ■ NAL
HARMONY RD - & LADY MOON DR -
FORT COLLINS, COLORADO
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795
FULL BUILD - ELEVATIONS
BHA Design Incorporated
SHEET: 4 OF 13 401603 Oakridge Drive
F80525SEPTEMBER 20, 2013 v.icis 970.2237577
fax 970.223 1827
B-100 2689
I
C)
40
'ram
1
fit fin I III
P.
LO
0
IT
03
0
N
0
0
m
1
Banner Health®
F■ NAmm
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD. & LADY MOON DR.
FORT COLLINS, COLORA�O
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795
FULL BUILD - SHADOW ANALYSIS
BHA Design Incorporated
SHEET: 5 Ill 13 1603 Oakridge Dnv
Fort Collins, Colorado 80525
SEPTEMBER 20 2013 fame 77
� fax. 97022323 182827
9 -100 2689
I, h
0
N
R
m
0
m
t'
N
0
m
I
I
r� II
Ell
I
i
I
I
II
I
I
I
I
I
I
1
I
1
1
1
1
1
I
1
II
If
Banner Health®
F ■ ■N■ A �
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD_ & LADY MOON DR.
FORT COLLINS, COLOR -ADO
BOULDER ASSC+CIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CC) 303.499.7795
FULL BUILD - SHADOW ANALYSIS BHA Design Incorporated
SHEET: 6 O F 13 Fort16 ollim, Co Drive
Fort Collins, Colorado 80525
SEPTEMBER 20, 2013 iaX. 970.223 2�"
B-100 2689
SIGNAGE, BY
ON
co
*40
O
C)
Vale'
li
co
F.
d
0
EI
m
c
U
N
Q
V
N
LE
0
g
ri
2
1 NORTH ELEVATION - EAST END
7 OF 13 1/8" = 1'-0"
A A.2 B
II I
Pclr.l
�-
)
I�
]BIL- 11 � I
MPl� l
yam_
F-1 SF 1 _ ST
Y _ ST
--EI FS-2
WEST ELEVATION - NORTH END
7 OF 13 1/8" = V-0"
GS
!J I'
I I
Gis (GV)
II
IGVI
ST
ELECTRICAL FOR
POWER
D) (E
O O CG5
I I I
11101111111
Z7 Z6 Z5 Z4 Z3 Z2 Z1
� NORTH ELEVATION - WEST END
7 OF 13 1/8" = 1'-0"
PARAPET (ENTRY)
128' - 0"
T.O. ROOF SCREEN
(CLINIC)
123' - 6"
PARAPET(FLOOR 1)_,ll
117' - 8"
MPl
FLOOR 1 (4910.25') n
100' -- 0" 1
PHASE 1
ELEVATON
KEY PLAN
1
FULL
2 BUILD
3 PRIM I
I
0
SF-2 ~
FULL
FULL
PROJECT
BUILD
BUILD
NORTH
T.O. ROOF SCREEN
D&T
146' - 7 1/2"
PARAPET (TOWER.. 2) n
143' - 8" V
PARAPET (D&T 2) n
134' -- 8" 1
PARAPET(ENTRY) n
128''-0" 7
FLOOR 22
115' - 4" Is
LOW CANOPY ROOF n
112' - On I
FLOOR 1 (4910.25') n
100' - 0" 1
wT.O. ROOF SCREEN
ell
ST
PARAPET (D&T 2
134' - 8"
PARAPET (ENTRY)
FLOOR4
115' - "
PARAPET (LOW
CANOPY ROOF
113' - 6"
FLOOR 1 (4910.25') IS
looton
0"
NOTE'
SIGNAGE IS NOT APPROVED THROUGH THE FINAL
PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE
SIGN PERMIT FOR APPROVAL
Banner Health®
F■ NAB P N
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD _ & LADY MOON DR.
FORT COLLIIVS� COL(=>RAE:)O
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795
PHASE 1 - ELEVATIONS
BHA Design Incorporated
SHEET: 7 O F 13 � Fort Olin,, Colorado 80525
SEPTEMBER 20 2013 voice 77
fax: 97022323 1827
82
B-100 2689
QD
to
N
C)
Q
r".
I
m
A
WEST ELEVATION - CLINIC
8 OF 13 1/8" = 1'-0"
MP1-
SOUTH ELEVATION - CLINIC & LOBBY
8 OF 13 1/8" =1'-0"
T.O. ROOF SCREEN
(CLINIC)
123r_6"
11PARAPET(FLOOR 1)
7r-8"
FLOOR 1 (4910.25')_
100' - 0"
� EAST ELEVATION -CLINIC
8 OF 13 1/8" =1'-0"
=f ST
-
T.O. ROOF SCREEN
(BED TOWER 1)
146' - 1 1/2"
T.O. ROOF SCREEN
(BED TOWER 2)
139' - 9 1/2"
PARAPET (ENTRY)
128' - 0"
T.O. ROOF SCREEN
(CLINIC
123' - 6"
PARAPET (FLR 1 LOWW)
116' - 8"
FLOOR 1 (4910.25'
100' - 0"
Z7 1.5
m
EXTERIOR ELEVATIONS - MATERIAL LEGEND
ST I STONE VENEER (COLOR AND FINISH TBD)
CMU BLOCK VENEER (DARK COLOR AND FINISH TBD)
BLI) (SEE SHEET 12 FOR COURSING DETAIL)
BL2 � CMU BLOCK VENEER (LIGHT COLOR AND FINISH TBD)
(SEE SHEET 12 FOR COURSING DETAIL)
i SF1 ! SPLIT FACE VENEER ( DARK COLOR AND FINISH TBD )
_ (SEE SHEET 13 FOR COURSING DETAIL)
SF2) SPLIT FACE VENEER ( LIGHT COLOR AND FINISH TBD )
(SEE SHEET 13 FOR COURSING DETAIL)
MF'I ZINC METAL PANEL (WALL)
MP21 PREFINISHED METAL PANEL (SCREEN)
EIFS-� EIFS (LIGHT COLOR AND FINISH TBD)
EIFS-� EIFS (DARK COLOR AND FINISH TBD)
MC) METAL PARAPET CAP
PC I PRECAST CONCRETE PARAPET CAP (COLOR AND FINISH TBD)
RM) ROOF MEMBRANE
SS I METAL PANEL CANOPY ROOF FASCIA
SS1 ! VERTICAL SUN SHADE
SS2 I HORIZONTAL SUN SHADE
SS3) VERTICAL GLASS SHADE
NOTE:
SIGNAGE IS NOT APPROVED THROUGH THE FINAL
PLAN ALL SIGNAGE WILL RECEIVE A SEPARATE
SIGN PERMIT FOR APPROVAL
PARAPET (ENTRYYY)
128' - 0"
T.O. ROOF SCREEN
(CLINIC)
123' - 6"
PARAPET(FLOOR 1)
117' - 8"
PARAPET (LOW
CANOPY ROOFF�
113' - 6"
FLOOR 114910.25�_
100' - 0"
GV VISION GLAZING
GS SPANDREL GLAZING
HORIZONTAL CONTROL JOINT
PROVIDE CUSTOM SEALANT COLOR TO
CJ MATCH VENEER. SEE DETAILS:
BLOCK:
EIFS:
VERTICAL CONTROL JOINT
C PROVIDE CUSTOM SEALANT COLOR TO
MATCH VENNER. SEE DETAILS:
BLOCK:
EIFS:
PHASE 7
ELEVATON
KEY PLMI
I
Banner Health® N O R T H
T
PROJECT
NORTH
F ■ NAIL. P L.AN
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD. & LADY MOON DR -
FORT COLLINS, COLORADO
BOULDER ASSOCIATES ARCHITECTS 1 426 PEARL ST., SUITE 300 BOULDER, CO 303.499-7795
PHASE 1 - ELEVATIONS
BHA Desig n Incorporated
_ SHEET: 8 O F 13 40- 1603 Oakridge Drive
SEPTEMBER 20, 2013 Fort C970.223.7 77 80525
voice 970.223.7577
fox 970.223.1827
9 -100 2689
Q
CD
F.
C
N
to
co
0
m
cn
N
0
i
m
J )1J.2
WEST ELEVATION
9 OF 13 1/8" = V-0"
BLA
K.5
)
4 I
1 SOUTH ELEVATION - WEST BED TOWER
9 OF 13 1/8" = V-0"
� SOUTH ELEVATION - EAST BED TOWER
9 OF 13 1/8" =1'-0"
T.O. ROOF SCREEN
O (Z 5 (BED TOWER 1)
146 -1 1/2
— — - PARAPET (TOWER 1)
144' - 8"
'ARAPET ( BED TOWER
3
133' 0"
FLOOR 2 n
115' -- 4" 1
—FLOOR 1 (4910.25
100' - 0"
T.O. ROOF SCREEN
(BED TOWER 2)
139' - 9 1/2"
PARAPET (BED TOWER
2)
-- 134, - on
FLOOROR
115' - 4"
LOW CANOPY ROOF
112' - 0"
FLOOR 1 (4910.25S )
100' - 0"
EXTERIOR ELEVATIONS - MATERIAL LEGEND
ST) STONE VENEER (COLOR AND FINISH TBD)
CMU BLOCK VENEER (DARK COLOR AND FINISH TBD)
BLI) (SEE SHEET 8 FOR COURSING DETAIL)
BL2) CMU BLOCK VENEER (LIGHT COLOR AND FINISH TBD)
(SEE SHEET 8 FOR COURSING DETAIL)
SF1) SPLIT FACE VENEER ( DARK COLOR AND FINISH TBD )
(SEE SHEET 9 FOR COURSING DETAIL)
Sf2) SPLIT FACE VENEER ( LIGHT COLOR AND FINISH TBD )
(SEE SHEET 9 FOR COURSING DETAIL)
MPl) ZINC METAL PANEL (WALL)
MP2) PREFINISHED METAL PANEL (SCREEN)
EIFS-1 EIFS (LIGHT COLOR AND FINISH TBD)
EIFS-2 EIFS (DARK COLOR AND FINISH TBD)
f MC) METAL PARAPET CAP
PC) PRECAST CONCRETE PARAPET CAP (COLOR AND FINISH TBD)
RM) ROOF MEMBRANE
SSMETAL PANEL CANOPY ROOF FASCIA
SSl) VERTICAL SUN SHADE
SS2 1 HORIZONTAL SUN SHADE
SS3) VERTICAL GLASS SHADE
GV) GLAZING - VISION
GS) GLAZING - SPANDREL
T.O. ROOF SCREEN
(BED TOWER 1)
146' - 1 1/2"
HORIZONTAL CONTROL JOINT
PROVIDE CUSTOM SEALANT COLOR TO
T.O. ROOF SCREEN
Cl MATCH VENEER. SEE DETAILS:
BLOCK:
(BED TOWER 2)
EIFS:
139' - 9 1/2"
VERTICAL CONTROL JOINT
RAPET ( BED TOWER
CJ PROVIDE CUSTOM SEALANT COLOR TO
3)
MATCH VENNER. SEE DETAILS:
BLOCK:
133
EIFS:
FLOOR 2
115' - 4"
FLOOR_ 1(4910.25)
100, - 0"
PHAN 1
ELEVATON
KEY PLAN
FULL
BUILD
KNEE 1
41�=
FF--1
2 3
FULL
BUILD
FULL
BUILD
C
T
PROJECT
NORTH
NOTE:
SIGNAGE IS NOT APPROVED THROUGH THE FINAL
PLAN. ALL SIGNAGE WILL RECEIVE A SEPARATE
SIGN PERMIT FOR APPROVAL
Banner Heal 'R,
F ■ NAL
P L.A N
BANNER HEALTH MEDICAL CAMPUS
HARMONY RD. & LADY MOON DR.
FORT COLLI NSA COLORADO
BOULDER ASSOCIATES ARCHITECTS 1426 PEARL ST., SUITE 300 BOULDER, CO 303.499.7795
PHASE 1 - ELEVATIONS
BHA Design Incorporated
SHEET: 9 O F 13 0 1603 Oakridge Drive
SEPTEMBER 20, 2013
Fort Collins, Colorado 80525
voice: 970.223.7577
fax 970.223 1827
9-100 2689