HomeMy WebLinkAboutWOODWARD TECHNOLOGY CENTER - Filed DCP-DEV. CONSTRUCTION PERMIT - 2013-08-29City of
Fort Collins
`�_,�/ ngi ring
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: �Issuance Date: 3
Project Name: Woodward Technology Center — Overlot Grading
Project Location: SW corner of Lemay Avenue and Lincoln Avenue'
Permittee: Sal Moya Mortenson Construction
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Construction Inspection Fee
(No public infrastructure associated with this DCP) $ 0.00
Total amount due $ 0.00
Development Bond or other approved security:
Erosion Control Security. Amount of security deposited with the City to guarantee the
proper installation and maintenance of the erosion control measures shown on the
approved Grading and Erosion Control Plans which is a part of the Final Development
Plan Documents.
$ 156,750.00
Form of security deposited with the City: 3?nca; 0" 0z-3 a 1 `r i
Landscape Security. Amount of security deposited with the City to cover the costs of the
improvements and plantings as shown on the Tree Mitigation Plan which is a part of the
Final Development Plan Documents.
$ 92,800.00
Form of security deposited with the City: age L1,0, 7-1 S1 �z
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
Page 1 of 5
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the
terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in
Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions:_N/.
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(grading plans, site plan, landscape plan, development agreement, soils report, drainage report,
plat easements and any other official documents), shall be kept on the development site available
for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Page 2 of 5
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority
of the owners of the property (including all owners having legal or equitable interest in the real
property, as defined in Section 1-2 of the City Code; and including common areas legally connected
to or associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I
hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to
enter upon such property to perform work required of the applicant if the applicant were to fail to
perform the required work. I also acknowledge that I have read this permit document with all its
requirements and conditions, and I agree to all of the terms and conditions so stated in this
permit.
Applicant/Project Manager's Signatu rr--.- Date:
Approval for issuance:
City Engineer A prov � Date:
611 3
4—�F(Permit Issuance Date)
Page 3 of 5
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Woodward Technology Center — Overlot Grading
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Langenberger
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6573
Construction Inspector: Tracy Dyer
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6605
Cell (970) 222-0855
Current Planner: Jason Holland
281 N. College Avenue, Fort Collins, Co 80524
(970) 224-6126
Water Utilities Engineer/
Wastewater Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970) 221-6854
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, Co 80521
(970) 224-6700
Natural Resources: Lindsay Ex
281 N. College Avenue, Fort Collins, Co 80524
(970)224-6143
Traffic Operations: Joe Olson
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6815
Forestry: Tim Buchanan
215 N. Mason St., Fort Collins, Co 80524
(970) 221-6361
Page 4 of 5
Light and Power: Doug Martine
700 Wood Street, Fort Collins, Co 80521
(970) 221-6700
Developer's Contact Persons:
Project Manager/Developer:
Sal Moya, Mortenson Construction
1621 Eighteenth Street, suite 400
Denver, CO 80202
720-920-4370
Cell (303) 421-0502
sal.moya@morten.son.com
Project Engineer: Bob Ameriall, Interwest Consulting Group
1218 W. Ash, Suite C
Windsor, CO 80550
970-674-3300
balmirall @ interwest¢rp.com
Architect/Planner: Angie Milewski, BHA Design
1603 Oakridge Drive
Fort Collins, CO 80525
970-223-7577
amilewski@bhadesign.com
General Contractor: Sal Moya, Mortenson Construction
1621 Eighteenth Street, suite 400
Denver, CO 80202
720-920-4370
Cell (303) 421-0502
sal.moya@mortenson.com
Page 5 of 5