Loading...
HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK ODP - Filed O-ODP/MASTER PLANS - 2013-07-113E CD WILDWOOD SUBDIVISION (3.0 Gross Density, 4.0 Net Density) Q O ULJ J ' LLI N EXISTING SIGNALIZED INTERSECTION ... SHELTER I PRIVATE ,ACCESS DRIVE iJ �s _ Fw saTa eo1116 w • r -SECONDARY I (EXISTING) 0.63 ACRES A. INTEL (EXISTING) 32.0 ACRES - PARCEL BOUNDARY, TYP. TIMBERWOOD DRIVE • • • • • • • • • • • -PROPOSED FULL TURN ' INTERSECTION • FIFTH AMENDMENT TO HARMONY TECHNOLOGY PARK OVERALL DEVELOPMENT PLAN LOCATED IN THE NORTH HALF OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH P.M. CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO EXISTING SIGNALIZED EXISTING SIGNALIZED FUTURE INTERSECTION RIGHT-IN/RIGHT OUT INTERSECTION - RMONY CORRIDOR SETBACK - --- ---" . • • • • • • • • • • • --- ----------------------------------- 80' HARMONY CORRIDOR LANDSCAPE SETBACK );r Q >-0 • • •uj Ow J c~i7 O0 Z� 2W w v F �J 'RIMARY & SECONDARY USES 21.5 ACRES TOTAL 13.93 ACRES PRIMARY 7.57 ACRES SECONDARY (PUBLIC ROAD • ACCESS) r • C• FUTURE TRANSPORTATION PRIMARY USES ACCESS POINT • 54.1 ACRES • • C PRE • • • • • • • • • • • • C'SIOHi DRIVE PRIMARY USES • • • • 42.55 ACRES ' • ,I • A 'FUTURE TRANSPORTATION ' FUTURE ACCESS POINT TRANSPORTATION PROPOSED FULL TURN INTERSECTION ST ALRK. \`�`>;>IB�w�S O N �4j41 Oros$ fifensilyl ',I 'j•Qg.N6t'BtrrlsMy� ' f, I II • • • • • • • • • • • ACCESS POINT ROCK CREEK DRIVE 4 (COLLECTOR STREET) EXISTING TREE, TYPICAL FOSSIL RIDGE HIGH SCHOOL INTERSECTION • HARMONY ROAD (MAJOR ARTERIAL) 80 HARMONY CORRIDOR LANDSCAPE SETBACK PRIMARY & SECONDARY USES NOT A PART 13.39 ACRES TOTAL 4.215 ACRES PRIMARY 9.175 ACRES SECONDARY • • • • • • • • FUTURE TRANSPORTATION • ACCESS POINT PROPOSED TRANSPORTATION ACCESS POINT LU • ZLU gLU • TI BERWOOD DRIVE o K J • at • H j PRIMARY USES .� Cif z 19.7 ACRES • PRIMARY USES Z o 13.9 ACRES O J • 0 • �w LA • • • ' M ' • PRIMARY USES SECONDARY USES 10.4 ACRES TOTAL • 11.7 ACRES • • J ' �II N SECONDARY USES • ' 13.5 ACRES SECONDARY USES 1 • ' 11.2 ACRES • 18 DU/AC 200 Units) NOT A PART ODP BOUND RY L TURAL RESO CES BUFFER 5U FROM CREEK) .9 ACRES P- OPEN SPACE 0.36 AC. O SECONDARY USES 14.15 ACRES 18 DU/AC (+/- 250 Units) I I I I I I � FUTURE FUTURE STREET CONNECTION ILLO BROOK SU ID VISION (Pro Phase 1 PDP 4.9 G Density, 4.2 Net nsity, 5.4 DU/ C) �I DRAINAGE & DETENTION AREA 2.84 ACRES NOT A PART LAND PARCEL USE TABLE PROPOSED USES APPX. ACREAGE PERCENTAGE A Office/Manufacturing (existing) 32.0 ac. 11.7% B Secondary 0.63 oc. 0.2% Child Care Center (existing) C Primary 42.55 oc. 15.5% D n/a 0 ac. 0% E Primary 54.1 ac. 19.8% F Open Space 6.9 ac. 2.5% Harmony Corridor Setback G Secondary 9.175 oc. 3.4% Primary 4.215 ac. 1.5% H Primary 13.9 ac. 5.1% 1 Secondary 11.7 ac. 4.3% J Secondary 13.5 ac. 4.9% K Primary 19.7 ac. 7.2% L Open Space Nat Resource Buffer0.9 ac. 0.3% M Primary 10.4 ac. 3.8% N Secondary 11.2 ac. 4.1 % O Secondary 14.15 oc. 5.2% P Secondary 0.36 oc. 0.1% Q Open Space 4.16 oc. 1.5% R Open Space 2.84 ac. 1.0% S Primary 13.93 oc. 5.1% Secondary 7.57 ac. 2.8% TOTALS (ALL PARCELS) 273.88 AC. 100% Primary 190.795 AC. 65.7% Secondary 68.285 AC. 24.9% NOTES Q 1. PRIMARY, SECONDARY AND ACCESSORY USES SHALL BE AS DEFINED O Q IN THE CITY OF FORT COLLINS LAND USE CODE 0 2. FUTURE DEVELOPMENT WITHIN THIS OVERALL DEVELOPMENT PLAN 0 SHALL BE SUBJECT TO THE UNDERLYING HARMONY CORRIDOR ZONE TZ DISTRICT REQUIREMENTS AND DEVELOPMENT STANDARDS EFFECTIVE AT THE TIME OF FORMAL DEVELOPMENT APPLICATION. Z Q 3. WATER IS PROVIDED BY THE CITY OF FORT COLLINS AND SANITARY r V o[ SEWER IS PROVIDED BY THE SOUTH FORT COLLINS SANITATION Q N DISTRICT. D W �s N LEGEND ODP BOUNDARY I\ ;��+ • • • • PEDESTRIAN / OG BICYCLE CIRCULATION PUBLIC STREET TRANSPORTATION CONNECTION \ l NOT A PART OLO • OVERALL DEVELOPMENT PLAN HARMONY TECHNOLOGY PARK FIFTH AMENDMENT FORT COLLINS, COLORADO BHA DESIGN, INC. • 1603 OAKRIDGE DR. ' - FT. COLLINS, CO $0525 a TEL: (970) 223-7577 S H E E T 1 O F 1 REVISED MAY 9, 2013 (�