HomeMy WebLinkAboutBUCKING HORSE FILING TWO - Filed DCP-DEV. CONSTRUCTION PERMIT - 2013-04-03City of
F6rt Collins
Engineering
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: l3 -0(e Issuance Date: � y / 3
Project Name: Bucking Horse Filing Two
Project Location: —Northeast of Timberline Road and Nancy Gray Avenue
Permittee: Nick Campana. Secretary, Bellisimo. Inc. 970-229-5900
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project,
Fees: Permit Application Fee $ 400.00
Construction Inspection Fee (paid prior to issuance of this permit)
$ R68.686.00
Total $ $69,086.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 1,448,800.36 Form of security deposited with the City: Bank of Colorado LOC #270007133
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for all
revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
Page 1 of 6
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project (utility
plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study,
drainage report, plat easements and any other official documents), shall be kept on the development
site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant may
apply for an extension by reapplication at least two weeks prior to the expiration date. Such
application shall contain information sufficient to justify the granting of the extension. An
extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained in
the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior to
the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements are
completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
Page 2 of 6
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority ofthe
owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property
to perform work required of the applicant if the applicant were to fail to perform the required work. I also
acknowledge that I have read this permit document with all its requirements and conditions, and I
agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: — Date: 34C611
Approval for issuance:
City Engineer Approva
Page 3 of 6
Date:
(Permit Issuance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Bucking Horse Filing One, Phases (C-1 & C-2)
City Staff Contact Persons:
Development Engineer: Andrew S. Gingerich, P.E.
281 North College Avenue, Fort Collins, CO 80524
970 221-6567
Construction Inspector: Steve Cicione
281 North College Avenue, Fort Collins, CO 80524
970 692-4418
Current Planner: Ted Shephard
281 North College Avenue, Fort Collins, CO 80524
970 416-2283
Water Utilities Engineer:
Erosion Control Inspector:
Roger Buffington
700 Wood Street, Fort Collins, CO 80521
970 221-6854
Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
970 218-2932
Natural Resources: Lindsay Ex
281 North College Avenue, Fort Collins, CO 80524
970 221-6143
Traffic Operations: Joe Olson
626 Linden Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
970 221-6815
Forestry: Tim Buchanan
215 N Mason Street, Fort Collins, CO 80524
970 221-6641
Page 4 of 6
Light and Power:
Developer' Contact Persons:
Owner:
Doug Martine
700 Wood Street, Fort Collins, CO 80521
970 224-6152
Bucking Horse, LLC, Bucking Horse Development,
Inc. and Johnson Farms, LLC
Gino Campana (president)
7307 Streamside Dr. Fort Collins, CO 80525
970.229.5900 (office)
970.223.5740 (cell)
2cgmpana@.bellisiinoinc.com
Applicant: Gino Campana (manager)
Bucking Horse Development, Inc.
7307 Streamside Dr. Fort Collins, CO 80525
970.229.5900 (office)
970.223.5740 (cell)
gcainpana e,bellisimoinc.com
Permitee: Nick Campana, Bellisimo Inc.
7307 Streamside Dr. Fort Collins, CO 80525
970.229.5900 (office)
970.402.0919 (cell)
General Contractor: Gino Campana (manager)
Bellisimo, Inc.
7307 Streamside Dr. Fort Collins, CO 80525
970.229.5900 (office)
970.223.5740 (cell)
gcainpana o,bellisimoinc.com
Contractor: Gerrard Excavating, Inc.
Bill Nichols
27486 County Road 13 Loveland, CO 80534
970.669.1463
bnichollkgerrardinc.com
Page 5 of 6
Project Engineer: Nick Haws
Northern Engineering
200 S. College Ave. Suite 10
970-221-4158
970-690-0927 (cell)
nickgnorthernen ing_ eerieg coin
Architect: Craig Russel
Russel Mills Studios
141 S. College Ave. Suite 104
970-484-8855
970-631-2072
crussel&russehnillsstudio s. co m
Page 6 of 6
Development Construction Permit Meeting
Project: Elizabeth and City Park Corner Redevelopment Date: 10/24/2012
Attendee
Dk -,o nl i h r :i
1
Andrew Gingerich - FCGOV Staff Engineer
970-221-6603
agingerich(n�fcgov.com
2
.
3
4
RA1 V� S 1G �S '
2 59 no
r
5
i �"'
/
n-r..,. FCC
6
��
6g yw l
�CLC�o �c
9
NICK- MAWS
/uw-1rtOR+J CNCtf- ez-,7-�l'
9-70
.
10
I
CC>7�ti Cj �-S,
COO �� %�O,Z Liz
�:-'J_!�/�IYa'-M c:n i=�4 �r/�t .Cd.✓.C/}jT. �G '✓�
11
12
JCSSC C
CPU /�lOSJz-j
0,= ��
�f7e� - ZZ� - GGs�(
v c ,/. Co4�
/
('i►to.S�� ��5a.� �.
13
14
15
16
17