HomeMy WebLinkAboutBUCKING HORSE FILING ONE PHASE A-1 A-2 A-3 AND B - Filed DCP-DEV. CONSTRUCTION PERMIT - 2013-03-15City of
ort Collins
Engineering
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 1 Z - 2- Issuance Date: I q/ 1 Z
Project Name: Bucking Horse Filing One Phases (A-1 A 2 A 3 and B)_
Project Location: Northeast of Timberline Road and Nancy Gray Avenue
Permittee: Nick Campana, Secretary, Bellisimo, Inc, 970 229 5900
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee $ 400.00
Construction Inspection Fee (paid prior to issuance of this permit)
Phase A-1 $ S2,242.89
Phase A-2 $ S2,96771
Phase A-3 $ S9 327 72
Phase B $ 86 739 30
Total $ $21,677.62
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
Phase A-1: $ 56,168.11
Form of security deposited with the City: LOC #2700007109
Phase A-2: $ 70,140.23
Form of security deposited with the City: LOC #2700007110
Phase A-3: $ 252,435.53
Form of security deposited with the City: LOC#2700007112
Phase B: $ 121,883.15
Form of security deposited with the City: LOC#270000701 I I
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
Page 1 of 6
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Page 2 of 6
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature: Date: // __///0L
Approval for issuance:
City Engineer Approv Date:i'� we -
(Permit Issuance Date)
Page 3 of 6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Bucking Horse Filing One, Phases (A-1, A-2, A-3, and B)
City Staff Contact Persons:
Development Engineer: Andrew S. Gingerich, P.E.
281 North College Avenue, Fort Collins, CO 80524
970 221-6567
Construction Inspector: Steve Cicione
281 North College Avenue, Fort Collins, CO 80524
970 692-4418
Current Planner: Ted Shephard
281 North College Avenue, Fort Collins, CO 80524
970 416-2283
Water Utilities Engineer:
Erosion Control Inspector:
Roger Buffington
700 Wood Street, Fort Collins, CO 80521
970 221-6854
Jesse Schlam
700 Wood Street, Fort Collins, CO 80521
970 218-2932
Natural Resources: Lindsay Ex
281 North College Avenue, Fort Collins, CO 80524
970 221-6143
Traffic Operations: Joe Olson
626 Linden Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
970 221-6815
Forestry: Tim Buchanan
215 N Mason Street, Fort Collins, CO 80524
970 221-6641
Page 4 of 6
Light and Power: Doug Martine
700 Wood Street, Fort Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Owner: Bucking Horse, LLC and Jessup Farm, LLC
Gino Campana (president)
7307 Streamside Dr. Fort Collins, CO 80525
970.229.5900 (office)
970.223.5740 (cell)
kcampanaa,bellisimoinc com
Applicant: Gino Campana (manager)
Bucking Horse Development, Inc.
7307 Streamside Dr. Fort Collins, CO 80525
970.229.5900 (office)
970.223.5740 (cell)
%campana(a�bellisimoinc com
Permitee: Nick Campana, Bellisimo Inc.
7307 Streamside Dr. Fort Collins, CO 80525
970.229.5900 (office)
970.402.0919 (cell)
General Contractor: Gino Campana (manager)
Bellisimo, Inc.
7307 Streamside Dr. Fort Collins, CO 80525
970.229.5900 (office)
970.223.5740 (cell)
t;campana ahellisimoinc com
Contractor: Gerrard Excavating, Inc.
Bill Nichols
27486 County Road 13 Loveland, CO 80534
970.669.1463
bnichollkgerrardinc.com
Page 5 of 6
Project Engineer: Nick Haws
Northern Engineering
200 S. College Ave. Suite 10
970-221-4158
970-690-0927 (cell)
nickknorthernengineerin com
Architect: Craig Russel
Russel Mills Studios
141 S. College Ave. Suite 104
970-484-8855
970-631-2072
crussel russelmillsstudios com
Page 6 of 6
° B(tKING HORSE - FILING
OVERALL
PHASING PLAN
rti D/`I .•
Z
- O jnj
O
'I =
■� I NORTHERN
ENGINEERING =
N N A.mmmmT OOOOOpoo0000o 000000a o'00000 oon0000
.o0
m m oo:❑❑n000 000.❑o
m m m m
N
v
o
MNN--
m
m ��
NOd.9'a^
Nd Q❑
Na>'..Ns'C
N
LLLDd 'LLMC
0na0�.m0:a.�- a'. �M�a�� VmNf:G...
d aN
L� �>
r47Us
aN-
}
a
3
~ 33~~ 33�LLLLLL~
o���LL3
�n3LL�;3LLLLo
ma
�2 �2 M2 �2.22'2 [22.' M�2
a amma'a'a^'mma❑m�a�aaa
r N N N
n LLr
,aa063m
L LL�LL�aaaaaaa�aaM�vaaaaa
a a a a
"- _
H
_�❑zzps
~ �, LL:LL d ,LL ❑ O �:D O.D L OJ J D H F 7 �N O L.
d < < L
C'�
NNNNN NTTTViN
(O N R IV N- m m.
m Of 01. O O.N D:D .a
9 9 q
'
�.M n:.QMNmN�NN:�NN.MOUI
V 7
d
v �
u
d O
d w rn
CIL
rn
� v
m c `
i
� E
J E
E
� d N
Or �
a c E
o U)
O U
c 0 n o 0
d N d
O
2
C .
a E ffi y r
E m i -0" 3 ac c c- nw� a. d d,o E A
d jq ❑UCmL�va C °ce '
aF- .-a E�ow Z.��.cZccZO�j mcU rno co_a g C
p am ovw� �oii`n �gcn�c J.ii cJQ Q uj
d €o c o>0- Eam-233d�0i `v `wU2aco ws € y a h
ai°v aLL_•-U�O �.�inn`�inud3IU�u�xacaC.c 'E
_z a NmodaIL(nin : E
a = do c a
m egg eeeeeeeeeee eeeeeeeee..eeeeeae A e e e
O ' Q O M N OO O O O O.O O OO OO O O.O O O OO O.O O.O 0 0 O p O.
� M N
N