Loading...
HomeMy WebLinkAboutONE BOARDWALK PLACE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2013-02-19Planning, Development & Transportation C't_fir( F O� Engineering Department 281 North College Avenue F6rt Collins PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax DEVELOPMENT CONSTRUCTION PERMIT 13-02 Issuance Date: 2Cr � Permit Number: Project Name: Project Location: Permittee: itA" for names and phone numbers of all City and developer contacts: See attached Exhibit project. contact persons $ 400.00 aid at the time of application) �Xn. Fees: Permit Application Fee (p ermit $ _—Construction Inspection Fee (paid prior to issuance of this p Total $ Development Bond or other approved security: deposited with the City to guarantee thecompletion for the development Public Amount of issecurity roved plans improvements to be constructed as shown on the approved $ 28 752.50 Form of security deposited with the City: check PERFORMANCE REQUIREMENTS OF THIS PERMIT: orate into all design fall materials testing by an Engineer. The Permittee 1. The Pennittee shall be responsible to require of their Project Engineer to inc; . ions to drawings and specifications the certification roval for all revisions shall have an Engineer prepare revised design drawings and secure CEngineer ity app resent, as required the Utility Plans and related documents. nt thatlttee e improvementhave snare constructed in conformance by the City in the Development Agreement, e shall e approved Utility plans and the standards and specifications prior to theeCity's acceptanceeof the with the pP Plan prepared by an Engine p provide "as -constructed p p P the cted ublic improvements. (All references aboveColoradoer)ms "Project Engineer an constru P "Engineer" shall mean a Professional Engineer license in 2. All co ntractors who perform work on this project must be bonded and licensed in conformance with City requirements. Development Construction Permit, Page 2/5 3. Construction time restrictions: n/a 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration in accordance with Section 2.6.3(K) of the Land Use Code: a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. Development Construction Permit, Page 3/5 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: n/a Permittee's acknowledgment signature: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: Date: 2 13Zl� Approval for issuance: City Engineer Approval* Date: �� 3�� (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: One Boardwalk Place City Staff Contact Persons: Development Engineer: Marc Virata 281 North College Avenue, Fort Collins, CO 80524 970 221-6567 Construction Inspector: Wayne Lenard 281 North College Avenue, Fort Collins, CO 80524 970 222-6824 Current Planner: Ted Shepard 281 North College Avenue, Fort Collins, CO 80524 970 221-6343 Water Utilities Engineer: Erosion Control Inspector: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 970 221-6854 Jesse Schlam 700 Wood Street, Fort Collins, CO 80521 970 218-2932 Natural Resources: Lindsay Ex 281 North College Avenue, Fort Collins, CO 80524 970 221-6143 Traffic Operations: Ward Stanford 626 Linden Street, Fort Collins, CO 80524 970 221-6820 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Forestry: Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 970 221-6641 Light and Power: Developer' Contact Persons: Permittee/General Contractor: Owner/Developer: Architect/Planner: Project Engineer: Grading/UtilityContracto r: Development Construction Permit, Page 5/5 Doug Martine 700 Wood Street, Fort Collins, CO 80521 970 224-6152 Lee Merritt Dohn Construction, Inc. 2642 Midpoint Drive Fort Collins, CO 80525 970 490-1855 (office) 970 567-1191 (cell) 970 490-6093 (fax) Imerritt@dohnconstruction.com Rod Arndt . One Boardwalk, LLC 405 Mason Court, Suite 111 Fort Collins, CO 80524 rod. amdt@ldconsulting.com Ian Shuff Aller-Lingle-Massey 712 Whalers Way, Suite B-100 Fort Collins, CO 80525 970 223-1820 ishuff@aller-lingle-massey.com Patricia Kroetch North Star Design, Inc. 700 Automation Drive, Unit I Windsor, Colorado 80550 970 686-6939 tricia@northstardesigninc.com Steve Martin Martin & Sons Excavating 18868 Weld County Rd. 3 Berthoud, CO 80513 970 635-0404 (office) steve@martinandsonsco.com D�n�m firm (�D�o(�vG�viI O (D CD =i N_ .(D. N C1 N p� W 0) 7 co ? m - �- 0 7 7 s� (n Nm <�o vm a� cn n �,.`,� o mo m �o=,�,,v '1-D m 0 3 a5 ��, m ccl) o m DDTm< mrOm �. to a) CLchi 73 ' m M0D3 cn .+ 0)m�oav � ' m m C) Nan. M 3CL "aWz r vhmm C0 � r �O y aCCD � 9 :° m mD < o n ( 3 z �3 'N cn m 2 zv D 4 m v c m Nr nm m D mp r r c m n Ocn Z G) Z 'I z� cpcnrrrfor �������rrr ��C)C)rr D=1 N ==xx=== z0 X Z9 G)0 =� pG-iD � 0o ro :G v m Cho r Z z m ""' zm m v O i�o rnwww000 00 m DA �-r CN0z m -on a�vz ----� 0 C v��cnc ;I rfl cA -ic m17 --�71 WDmz v DTI '- .. rfl rfl rfl Hi rfl rfl r9 rfl o in ra ba ros (n -I O O Eft rfl rfl N Cl) - O c n 0 0 0 0 0 V c n 00 U> rfl rfi rfl rfi «i 0 0 0 0 0 0 -< z - -1 C - i m , _ O 0 0 0 0 0 0 0 OoOOOOo OOOOOOOinOin 0 o 0 0 0 O O o O o o000 0o mric C "" o 0 0 0 0 0 0 m m -1 ? Cl) D � z. fil N W A ��b9 � m rn rfl rfl rfl rfl rfl rA 0000000 O N O O H9 rfl fA O(n00000-11(n01 rfl ffl rA rfl rfi 000000 r� o o o c o o o o c o 0 o c o in c o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 o m o 0 0 0 0 0 0 T -C�m m m<� v .9 �oz CA rfl rfl rA v1• rfi rfl to rfl rfl ILA)r s W W Co -I O V -I rfl rfi ea c0c0c0ow000 n O Ors rfl ea rfl wwwwoo o-1oI69 oaoo-in 11r � 0000000 o0C)o0000o000 r ocn000 0 m� CO o n m n CD ` z r G N v '' " ' Oo0000 r» rs '69 69 rfl � o o ocncnO o0CD mC) ea rfl rfl rfl � rfl 000000 w ? of 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O C- m 0 p c Z m Z v n 0 N -I m cn D-I m cn x m