HomeMy WebLinkAboutENGINES AND ENERGY CONVERSION LAB EXPANSION 450 NORTH COLLEGE AVENUE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2012-12-14City of
F6rt Collins
Engineeri g
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: Issuance Date: 1211312012
Project Name: Engines and Energy Conversion Lab Expansion
Project Location: 430 N CollegeAve_
Permittee: Bob Meserve, The Neenan Company, 303 710-1809
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($400.00 paid 11/07/12) $ paid
Construction Inspection Fee $ 2,542.60
Street Cut Fee (if applicable to be paid separately) $ N/A
Total amount due $ 2,542.60
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 38 278.6
Form of security deposited with the City: Check #45126
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
Page 1 of 5
3. Construction time restrictions: N/A
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the `as -constructed' plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
Page 2 of 5
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature:&%��iyL/
�Y
Approval for issuance:
City Engineer Appr v Date:
(Permit Issuance Date)
Page 3 of 5
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Engines and Energy Conversion Lab Expansion
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Tyler Siegmund
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6501
Construction Inspector: Steve Cicione
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6605
Cell (970) 692-4418
Current Planner: Ted Shepard
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6343
Water Utilities Engineer/ Wastewater Engineer:
Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970) 221-6854
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, Co 80521
(970) 224-6700
Natural Resources: Lindsay Ex
281 N. College Avenue, Fort Collins, Co 80524
(970) 224-6143
Traffic Operations: Joe Olson
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6815
Forestry: Tim Buchanan
215 N. Mason St., Fort Collins, Co 80524
(970) 221-6361
Page 4 of 5
Light and Power: Doug Martine
700 Wood Street, Fort Collins, Co 80521
(970) 221-6700
Developer's Contact Persons:
Project Manager:
Developer:
Project Engineer:
Architect/Planner:
General Contractor:
Jeff Jensen
Jensen Consulting
37154 Dickerson Way, Windsor, CO 80550
970-674-3025
Cell (970) 227-0622
j eff@j ensenconsulting. info
Nancy Hurt, CEO
Colorado State University Research Foundation
601 S Howes St, Room 410, Fort Collins, CO 80521
970-472-0491
Cell (970) 482-2916
Fax (970) 484-0354
Nancy.hurtgcolostate edu
Nick Haws
Northern Engineering Services, Inc
200 S College Ave, Suite 10, Fort Collins, CO 80524
970-221-4158 x5414
Cell (970) 690-0927
Fax (970) 221-4159
nick@northernengineering.com
H. Robert Hosanna
The Neenan Company
2607 Midpoint Dr, Fort Collins, CO 80525
303-710-1807
Fax (970) 493-5869
Bob.hosanna@neenan.com
Bob Meserve
The Neenan Company
2607 Midpoint Dr, Fort Collins, CO 80525
Cell (303) 710-1809
Fax (970) 493-5869
Bob.meserve@neenan.com
Page 5 of 5