HomeMy WebLinkAboutMAPLE HILL REPLAT - Filed OA-OTHER AGREEMENTS - 2012-11-29REIMBURSEMENT AGREEMENT
THIS REIMBURSEMENT AGREEMENT ("Agreement") is made and entered into this
j `1 day of )�CvejYl err, 2012, by and between GILLESPIE FARM DEVELOPMENT
COMPANY, a Colorado corporation, (the "Developer"), and the CITY OF FORT COLLINS,
COLORADO, a municipal corporation (the "City").
WHEREAS, Section 3.3.2(F)(2) of the Fort Collins Land Use Code ("Land Use Code")
allows for the reimbursement of certain costs for the construction of public street improvements
which specially benefit other property which is adjacent to such street improvements; and
WHEREAS, the Developer was the original developer of the Maple Hill Subdivision in
the City ("Maple Hill"); and
WHEREAS, the south half of Maple Hill was purchased by a third party (the "Third
Party Purchaser") and the Developer retained ownership of the north half of Maple Hill; and
WHEREAS, the Third Party Purchaser and the Developer, pursuant to the Maple Hill
Development Agreement dated August 19, 2003, and the Maple Hill Amendment Agreement #1
dated July 7, 2006, were obligated to pay for public street improvements to Turnberry Road
adjacent to Maple Hill; and
WHEREAS, the required Turnberry Road improvements are adjacent to and benefit both
the south half and the north half of Maple Hill; and
WHEREAS, the Third Party Purchaser has benefitted from the required Turnberrry Road
improvements, but has failed to pay its one-half share of the cost of the required Turnberry Road
improvements adjacent to the south half of Maple Hill; and
WHEREAS, the Developer has paid to the City the entire fixed cost of the required
Turnberry Road improvements, as hereinafter described in Exhibit `B", in the total amount of
Three Hundred Sixty-seven Thousand Ninety-two Dollars and Seventeen Cents ($367,092.17);
and
WHEREAS, the Developer has made application to the City for reimbursement of the
one-half share of its fixed cost payment for the required Turnberry Road improvements which
specially benefit the property purchased by the Third Party Purchaser; and
WHEREAS, the Developer has provided the City Engineer with the necessary
information, including the legal descriptions of the benefitted property adjacent to the required
Turnberry Road improvements ("Adjacent Property"), the name of the owner of the Adjacent
Property (the `Benefitted Owner") and reimbursement amount owed by the Benefitted Owner,
within the period of time required by the provisions of Section 3.3.2(F)(2) of the Land Use Code.
J&f4rn -fo:
Liley, Rogers & Martell, LLC&r
300 S. Howes Street
Pt., Collins, CO 80521
RECEPTION#: 20120082127, 11/19/2012 at
10:56:01 AM,
1 OF 17, R $91.00 TD Pgs: 0
Scott Doyle, Larimer County, CO
Reimbursable Costs
Maple Hill Obligation
Estimates have been prepared for the Maple Hill Subdivision Turnberry Road obligation and off -
site improvement obligation for the Country Club Estates Subdivision Turnberry frontage
improvements (driveway consolidation improvements). Right-of-way area has been calculated
for the credit due to the developer.
Turnberry Improvements
Based on the Maple Hill development agreement and recent meetings between the developer and
the City, an estimate was prepared for the cost to construct the local street portion of Turnberry
Rd. This estimate includes all necessary removals of existing obstructions, new curb and gutter,
4.5 feet width of concrete sidewalk, corner access ramps, 13 feet width of asphalt roadway
paving, 20% of the engineering costs and parkway landscape & irrigation improvements. It also
included paving of the right turn lane onto County Road 52 and 50% of the cost for paving of the
right turn lane on to Maple Hill Drive. The total estimated cost for the Turnberry improvements
and the right turn lane is $339,701.64
Off -Site Country Club Estates Improvements
An estimate was prepared for the cost to construct the driveway consolidation and frontage
improvements for the Country Club Estates Subdivision on the west side of Turnberry Rd.
Maple Hill shares a 1/3 obligation toward the cost of these improvements as outlined in the
development agreement and shown on the Maple Hill design plans. The total cost of these
improvements is estimated to be $82,171.59. Maple Hill's 1/3 obligation would be S27,390.53.
Right -of -Way Credit
Since Turnberry Road was realigned to the east, Maple Hill was required to dedicate additional
right-of-way for Turnberry Road above and beyond its half section standard requirement. A
credit is due to the developer for this additional right-of-way dedication. Using CAD drawings
from the Maple Hill Plat, the area of right-of-way was calculated to be 67718.33 SF. This is the
area along the entire Turnbenry frontage including the area of the right trim lane on to County Rd
52. The area of the right turn lane on to Maple Hill Drive is 3519.17 SF. The City proposes that
the developer be credited for 50% of right-of-way for this turn lane or 1759.58 SF. Combining
the two areas the total area to be credited is 69,477.91 SF. Based on evaluations of the property
and recent appraisals, the City proposes that the property be valued at $2.00/SF for a total credit
due of $138,955.82
Design -En ineerinQ Credit
The design for the east side of Turnberry Road along the Maple Hill frontage was completed by
TST in the approved Maple Hill Development Plans. A letter from TST was provided to the City
stating that the cost for this design work totaled $35,750. Based on the Street Oversizing
programs project split policy of 60/40 (60% of design costs to the City, 40% to the Developer),
the Developer is due a credit of $21,450, or 60% of the actual design cost incurred.
Maple Hill Nei Obligation
Turnberry Improvements -f $339.701.64
Right Turn Lane
Off -Site Improvements $27.390.53
S367,092.17
Less Right -of -Way Credit $138.95J.82
Less Engineering (60/40) S21,450.00
TOTAL NET OBLIGATION $206,686 35
CITY OF FORT COLLINS
Proiect:
Maple Hill Turnberry Obligation Estimate
Construction Coats
Subtotal Roadway Construction Costs
Subtotal Misc. Costs & Quantities:
Construction Project Contingency 0.15
r
S
g
263,066.92
26 676.40
43.296.50
2011 Estimated Project Cast
$
331,939.82
CITY OF FORT COLLINS
Manlp Hill Trirnhnrnt rlhli-4i.,.. 1: 4:....a
ITEM
NUMBER
DESCRIPTION
QUANTITY
UNIT
En inners
I Estimate
Engineers
Estimate
Unit Price
ITOTAL
Removals and Earthwork Quentltles
201-01
201-01
202-02
202-03
202-04
202-06
07
202.08
202-13
202-14
307-01
Clear & Grub 1.49ac
Removal of Pie RCP PVC CMP
Removal of Curb b Gutter (Turnberry at Coun Club NE CoL
Removal of Sidewalk _
Removal of Asphalt Pavement 4"-8") at Intersections
Removal of Abandoned Concrete Irrigation Structure
Removal of Abandoned irti anon Vent Pie
Removal of Abandoned Irri alion Valve
Removal of Tree 36" ma !e
Removal of Tree 24" Cottonwood
FlyAsh Sub rade Stabilization
RecondiGon Under Sidewalk
6700
51
200
270
192.E
1
1
1
1
1
4 391
8483
SY
LF
LF
SF
SY
EA
FA
EA
EA
EA
SY
SF
0.25
$ 14.64
$ 4.55
$ 1.33
$ 2.68
390.00
$ 100.00
$ 250.00
$ 1 675.D0
S 746.64
S 910.00
S 359.10
$ 516.17
390.00
$ 100.00
S 250.00
$1,500.00
$1 500.00
21 428.08306-01
10 688.58Concrete
W4M
- d As halt Pavi QuOtitles' 10 Inches bass + 6'Inches SG + 2 Inches 8304-01
A re ateBaseCourse - Class 5 or6 -10"De th_(CiP
2 440
TON1
720.00403-02
Hot Mix As halt Gradin SG 5" De th 100 PG64-22
1 036
TON
.2
160.00
403-01
Hot Bituminous Pavement - Grading S 2" Depth) PG 64-2-§1
415
TON
$ 70.00
$ 29 050.00
609-01
Vertical Curb 8 Gutter 30'
2,497
1 LF
$ 9.90
$ 24 720.30
608.01
Concrete Sidewalk fi"
8 483
SF
$ 2.60
$ 22 055.60
608-03
Concrete Access Ram 8" w/ Truncated Domes
520
SF
$ 8.10
S 4,212.00
Landsca a Quantities
2810.04
2810
2810.03
2810.01
Sod
Amended T Soil 2 inches de
Deciduous Street Trees
Irrigation futilizing E)dsfing Maple Hill irr. Tap)
22,763
842
59
22,753
SF
CY
EA
SF
0.40
$ 7.00
S 250.00
S 0.85
$ 9 101.20
S 5 101.20
S 14 750.00
$ 19 340.05
Subtotal
Mlsc Coats
8. QuanUtles ttN40b 11 20!4'for one atde of roadwa
Totes Project Misc. Cost
Total Project Cost Per Lineal Foot
Maple Hill Frontage0.
S 206,250.00
$ 5 15
25500. LF
Ma le HIII Misc. Coat 061 anon 20Yo
Totaf -Construction Cost
Contingency (15%)
Grand Total
$ < 331,939.82
CITY OF FORT COLLINS
Project:
Maple Hill- Country Club Frontage Obligation Estimate
Construction Costs
Subtotal Roadway Construction Costs
Subtotal Misc. Costs & Quantities:
Construction Project Contingency 0.15
Pr ectTotal plusContingency
5
10,718.0
_2010 Estimated Project Cost
Estimate
Date: P
CITY OF FORT COLLINS
Maple Hill-Country Club Frontaqe Obliqation
ITEM
E ng ir2mors
En (nears
NUMBER
DESCRIPTION
QUANTITY
UNIT
Estimato
Estimate
Unit Price
TOTAL
Removals and Earthwork Quantities
202
Saw Cut Asphalt Full Depth
2612
LF
$ 1.75
$ 4,571.00
202-04
Rotomill Asphalt Pavement 4"-8" Full Depth)
3773
SY
4.11
$ 15 507.03
203-01
Excavate & Compact Subgrade New Driveway Connections
278
SY
$ 3.75
$ 1,042.50
203-06
Topsoil Grading 6" Depth) Between PVT Drive & Sidewalk
400
Cy
$ 5.28
$ 2,112.00
Concrete and As halt Paving`Quantities
304-01
A-qqre ate Base Course - Class 5 or 6 - 6" Depth - CIP
150
TON
$ 13.00
$ 1,950.00
412
Concrete Pavement 8 inch(Driveway & A rons
178
SY
$ 26.00
$ 4,628.00
403-03
Asphalt Patching - Gradin_S (6" Deplh) - (PG 64-28)
24
TON
$ 98.00
$ 2,303.00
a uantl►es
Sod
20,416
SF
$ 0.40
$ 8.166.40
Ornamental Trees
20
EA
$ 225.00
$ 4,500.00
r
Irzi ation(utilizing Country Club Irr. Tap)
20,416
SF
$ 0.85
$ 17,353.60
Subtotal
S- 64133.63
Misc. Costs
&Quantities
MOB
1
LS
$ 3,106.68
$ 3,106.68
Admin & Inspection
1
LS
$ 1,242.67
$ 1,242.67
Erosion Control
1
LS
$ 621.34
$ 621.34
Survey
1
LS
$ 4,349.35
$ 4,349.35
Subtotal
$ 9,320.03
Total ConstructionCost
71,453.56
Contingency (15%)
E 10, 18.03
Grand Total
$ 82,171.59
CITY OF FORT COLLINS
Project:
Maple Hill Rt Turn Lane Obligation Estimate
Construction Costa
Subtotal Roadway Construction Costs
Subtotal Misc. Costs & Quantities:
Construction Project Contingency 0.15
Project Total plus Contingency
S
C$
13,498.82
2,024.82
2010 Estimated Project Cost
$
15,523.64
50% Obligation
$
7761.92J
CITY OF FORT COLLINS
Mantle Hill Rt Turn Lane Obligation Estimate
ITEM
Engineers
Engineers
NUMBER
DESCRIPTION
QUANTITY
UNIT
Estimate
Estimate _
Unit Price
TOTAL
Removals and Earthwork uantities
201-01
Clear & Grub 1.49ac
194
SY
0.25
$ 48.50
307-01
1 Fly Ash Subgrade Stabilization
194
SY
$ 4.88
$ 946.72
Concrete and Asphalt Pavl ` Quantities 10 inches base+ 6 Inches 80 + 2 inches S
304-01
Aggregate Base Course - Class 5 or 6 - 10" DePlh - (C�_
217
TON
$ 13.00
*� 2,823.60
403-02
Nat Mix Asphalt(Grading SG 5" De th 100 PG64-22
110
TON
S 60.00
$ 6,600.00
_
_
403-01
Not Bituminous Pavement - Grading S 2" -Depth - PG 64-28
44
TON
$ 70.00
$ 3,080.00
Total ConstnTotion,Cost
$ 13,498.82
Contingency (M)
$ 2,024.82
Grand Total
$ 16,623.64
50% Reduction
$ 7,761.82
NOW, THEREFORE, it is hereby agreed, upon the exchange of mutual consideration, the
adequacy and receipt of which is hereby acknowledged by the parties hereto, as follows:
1. The required Turnberry Road improvements for which the Developer has paid to
the City the entire fixed cost are being installed by the City.
2. The name of the Benefitted Owner and the legal descriptions of the Adjacent
Property are set forth on Exhibit "A" attached hereto and incorporated herein by this reference.
3. The City Engineer compiled documentation to establish the description of the
required Turnberry Road improvements and the total cost obligation therefor and such
description and costs are set forth on Exhibit `B" attached hereto and incorporated herein by the
description and reference ("Reimbursable Costs").
4. The share of the Reimbursable Costs attributable to the Adjacent Property is equal
to one-half of the Developer's fixed -cost payment to the City in the amount of One Hundred
Eighty-three Thousand Five Hundred Forty-six Dollars and Nine Cents ($183,546.09)
("Reimbursement Amount"); such amount is subject to the reimbursement provisions of Section
3.3.2(F)(2) of the Land Use Code.
5. Prior to the issuance of any building permit within the Adjacent Property or
within any replat of any portion of the Adjacent Property, the City shall, in good faith and at the
City's cost, attempt to collect the Reimbursement Amount, plus an adjustment for inflation, from
the date of the City's approval of the Reimbursable Costs to the date of collection (i.e. October 2,
2012), based on the construction cost index for Denver, Colorado, as published monthly by
"Engineering News Record," from the Benefitted Owner for reimbursement to the Developer.
6. The amount assessed and collected by the City under the provisions of this
Agreement, less a service charge of three percent (3%) to cover the City's administrative costs,
shall be paid to the Developer within thirty (30) days after collection. The City shall be
responsible for maintaining a record of the amounts collected and paid to the Developer.
7. The term of this Agreement shall not extend beyond a period of ten (10) years
from the acceptance by the City of the street improvements, unless an extension of the term is
approved by the City Council.
8. The services of the City in attempting to effect the reimbursement of costs
described herein are offered solely as an accommodation to the Developer. Accordingly, the
City shall not be liable for its failure to collect the monies specified herein and shall have no
obligation to commerce litigation for the purpose of attempting to make such collection. In the
event that the City's attempt to collect such charge and/or the City's withholding of building
permits results in the filing of any claims against the City and/or the commencement of litigation
against the City, the Developer agrees to pay all costs and fees incurred by the City in defense of
the same, including, but without limitation, attorney's fees; provided, however, that upon notice
from the Developer that it is waiving any right to the monies the City was attempting to collect
which resulted in the litigation, the City shall use its best efforts to settle or seek dismissal of
such action. The Developer further agrees to indemnify and hold harmless the City from any
damages or awards arising from or relation to any such claim or civil action.
9. This Agreement shall not be assigned by the Developer to any other party unless
written notice of such assignment is first given to the City. Such notice shall be deemed
delivered if given personally to the City Clerk, or if mailed to the City, to the following address:
City of Fort Collins, c/o City Clerk, P.O. Box 580, Fort Collins CO 80522.
10. The provisions of this Agreement and the promises and covenants contained
herein shall constitute a covenant running with the Adjacent Property and with any replat of any
portion thereof and shall be binding upon the Benefitted Owner and all future owners of the
Adjacent Property, including, but not limited to its assigns and successors in interest. Either
party shall be entitled to record this Agreement with the Clerk and Recorder of Larimer County,
Colorado, so as to provide notice of the terms hereof to the Benefitted Owner and future owners
of the Adjacent Property.
CITY: CITY OF FORT COLLINS, COLORADO,
a municipal corporation
By: ..,
Darin Atteberry City M , age
ATTEST: «� 't } '•. <,
4
!! N
Wanda Nelson, City Clerkt�••!!„!!.•! `
APPRO'V D AS TO FORM:
Paul Eckman, Deputy City Attorney
DEVELOPER:
GILLESPIE FARM DEVELOPMENT
COMPANY, a Colorado corporation
r"
Printed Name: ,�hrc.:�`� «,,,•�,
Title: t s a±•`'
STATE OF COLORADO )
ss.
COUNTY OF LARIMER )
The foregoing instrument was acknowledged before me this day of �¢
2012, by H .S'.hAk -jV., i�bkffAf' as t 1 w �� �. _ of
Gillespie Farm Development Company, a Colorado corporation.
Witness my hand and official seal
My commission expires: j t• q' X b U
Notary Public
w.�.
Maple Hill
South of Maple Hill Drive
Information Current as of 9/19/12
Exhibit "A"
To Reimbursement Agreement
Benefitted Owner and Description of Adjacent Property
Benefitted Owner:
Horsetooth Development, LLC,
a Colorado limited liability company
Adiacent Property:
Maple Hill Subdivision, Fort Collins, Colorado
Block
lot
Parcel Number
Property Address
18
1
88322-27-001
2302 Marshfield Lane
18
2
88322-27-002
2308 Marshfield Lane
18
3
88322-27-003
2314 Marshfield Lane
18
4
88322-27-004
2320 Marshfield Lane
18
5
88322-27-005
2326 Marshfield Lane
18
6
88322-27-006
2332 Marshfield Lane
18
7
88322-27-007
2402 Marshfield Lane
18
8
88322-27-008
2408 Marshfield Lane
18
9
88322-27-009
2414 Marshfield Lane
18
10
88322-27-010
2420 Marshfield Lane
18
11
88322-27-011
2426 Marshfield Lane
18
12
88322-27-012
2427 Forecastle Drive
18
13
88322-27-013
2421 Forecastle Drive
18
14
88322-27-014
2415 Forecastle Drive
18
15
88322-27-015
2409 Forecastle Drive
18
16
88322-27-016
2403 Forecastle Drive
18
17
88322-27-017
2333 Forecastle Drive
18
18
88322-27-018
2327 Forecastle Drive
18
19
88322-27-019
2321 Forecastle Drive
Page 1 of 5
18
20
88322-27-020
2315 Forecastle Drive
18
21
88322-27-021
2309 Forecastle Drive
18
22
88322-27-022
2303 Forecastle Drive
19
1
88322-28-001
2302 Forecastle Drive
19
2
88322-28-002
2308 Forecastle Drive
19
3
88322-28-003
2314 Forecastle Drive
19
4
88322-28-004
2320 Forecastle Drive
19
5
88322-28-005
2326 Forecastle Drive
19
6
88322-28-006
2332 Forecastle Drive
19
7
88322-28-007
2402 Forecastle Drive
19
8
88322-28-008
2408 Forecastle Drive
19
9
88322-28-009
2414 Forecastle Drive
19
10
88322-28-010
2420 Forecastle Drive
19
11
88322-28-011
2426 Forecastle Drive
19
23
88322-28-023
Summerpark Lane
19
24
88322-28-024
2326 Summerpark Lane
20
1
88322-29-001
2414 Bar Harbor Drive
20
2
88322-29-002
2420 Bar Harbor Drive
20
3
88322-29-003
2426 Bar Harbor Drive
20
22
88322-29-022
2557 Maple Hill Drive
20
23
88322-29-023
2415 Thoreau Drive
20
24
88322-29-024
2409 Thoreau Drive
20
25
88322-29-025
2403 Thoreau Drive
20
26
88322-29-026
2339 Thoreau Drive
20
27
88322-29-027
2333 Thoreau Drive
20
28
88322-29-028
2327 Thoreau Drive
20
29
88322-29-029
2321 Thoreau Drive
20
30
88322-29-030
2315 Thoreau Drive
20
31
88322-29-031
2309 Thoreau Drive
20
32
88322-29-032
2303 Thoreau Drive
20
33
88322-29-033
2263 Thoreau Drive
20
34
88322-29-034
2257 Thoreau Drive
Page 2 of 5
20
35
88322-29-035
2251 Thoreau Drive
20
36
88322-29-036
2245 Thoreau Drive
21
1
88322-30-001
2202 Thoreau Drive
21
2
88322-30-002
2208 Thoreau Drive
21
3
88322-30-003
2238 Thoreau Drive
21
4
88322-30-004
2244 Thoreau Drive
21
5
88322-30-005
2250 Thoreau Drive
21
6
88322-30-006
2256 Thoreau Drive
21
7
88322-30-007
2262 Thoreau Drive
21
8
88322-30-008
2302 Thoreau Drive
21
9
88322-30-009
2308 Thoreau Drive
21
10
88322-30-010
2314 Thoreau Drive
21
11
88322-30-011
2320 Thoreau Drive
21
12
88322-30-012
2326 Thoreau Drive
21
13
88322-30-013
2332 Thoreau Drive
21
14
88322-30-014
2338 Thoreau Drive
21
15
88322-30-015
2402 Thoreau Drive
21
16
88322-30-016
2408 Thoreau Drive
21
17
88322-30-017
2414 Thoreau Drive
21
18
88322-30-018
2420 Thoreau Drive
21
19
88322-30-019
2426 Thoreau Drive
23
5
88322-32-005
2244 Marshfield Lane
26
9
88322-35-009
2263 Bar Harbor Drive
26
10
88322-35-010
2257 Bar Harbor Drive
26
11
88322-35-011
2251 Bar Harbor Drive
26
12
88322-35-012
2245 Bar Harbor Drive
26
13
88322-35-013
Bar Harbor Drive
26
14
88322-35-014
2233 Bar Harbor Drive
26
15
88322-35-015
2227 Bar Harbor Drive
26
16
88322-35-016
2221 Bar Harbor Drive
27
1
88322-36-001
2220 Bar Harbor Drive
2
2
88322-36-002
2226 Bar Harbor Drive
Page 3 of 5
27
3
88322-36-003
2232 Bar Harbor Drive
27
4
88322-36-004
2238 Bar Harbor Drive
27
5
88322-36-005
2244 Bar Harbor Drive
27
6
j 88322-36-006
2250 Bar Harbor Drive
27
7
88322-36-007
2256 Bar Harbor Drive
27
8
88322-36-008
2262 Bar Harbor Drive
27
9
88322-36-009
2263 Milton Lane
27
10
88322-36-010
2257 Milton Lane
27
11
88322-36-011
2251 Milton Lane
27
12
88322-36-012
2245 Milton Lane
27
13
88322-36-013
Milton Lane
27
14
88322-36-014
2233 Milton Lane
27
15
88322-36-01S
2227 Milton Lane
27
16
88322-36-016
2221 Milton Lane
30
1
88322-39-001
2403 Sunbury Lane
30
2
88322-39-002
2409 Sunbury Lane
30
3
88322-39-003
2415 Sunbury Lane
30
4
88322-39-004
2421 Sunbury Lane
30
5
88322-39-005
2427 Sunbury Lane
30
6
88322-39-006
2433 Sunbury Lane
30
7
88322-39-007
2439 Sunbury Lane
30
8
88322-39-008
2445 Sunbury Lane
30
9
88322-39-009
2451 Sunbury Lane
31
1
88322-40-001
2503 Sunbury Lane
31
2
88322-40-002
2509 Sunbury Lane
31
3
88322-40-003
2515 Sunbury Lane
31
4
88322-40-004
2521 Sunbury Lane
31
5
88322-40-005
2527 Sunbury Lane
31
6
88322-40-006
2533 Sunbury Lane
31
7
88322-40-007
2539 Sunbury Lane
31
8
88322-40-008
2545 Sunbury Lane
31 1
9
88322-40-009
2551 Sunbury Lane
Page 4 of 5
Maple Hill Subdivision, First Replat, Fort Collins, Colorado
Block
Lot
Parcel Number
Property Address
1
1
88322-43-001
2303 Marshfield Lane
1
2
88322-43-002
2309 Marshfield Lane
1
3
88322-43-003
2315 Marshfield Lane
1
4
88322-43-004
2321 Marshfield Lane
1
5
88322-43-005
2327 Marshfield Lane
1
6
88322-43-006
2333 Marshfield Lane
1
7
88322-43-007
2403 Marshfield Lane
1
8
88322-43-008
2409 Marshfield Lane
1
9
88322-43-009
2415 Marshfield Lane
1
10
88322-43-010
2421 Marshfield Lane
1
11
88322-43-011
2427 Marshfield Lane
2
9
88322-44-009
2251 Marshfield Lane
2
10
88322-44-010
2257 Marshfield Lane
2
11
88322-44-011
2263 Marshfield Lane
2
12
88322-44-012
2269 Marshfield Lane
3
2
88322-45-002
2239 Country Club Road
3
3
88322-45-003
2245 Country Club Road
3
4
88322-45-004
2251 Country Club Road
3
5
88322-45-005
2303 Country Club Road
3
6
88322-45-006
2309 Country Club Road
3
7
88322-45-007
2315 Country Club Road
3
8
88322-45-008
2321 Country Club Road
3
9
88322-45-009
2327 Country Club Road
Page 5 of 5