HomeMy WebLinkAboutHOUSKA AUTOMOTIVE AUTOPARTS WAREHOUSE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2012-05-16City of
Fort Collins
-,...■./� Engineerin`q ,
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: ( Z- O 5 Issuance Date: �51 Lv it 12
Project Name: Houska Automotive Autoparts Warehouse
Project Location: 951 Riverside Ave
Permittee: Dennis Houska, Houska Automotive 970-482-0156
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($400.00) $ 400.00
Construction Inspection Fee $ 1,547.00
Street Cut Fee (to be paid separately) $
Total amount due $ 1,947.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 29,025.50
Form of security deposited with the City: G�.QX' Dyl- iXG�i�
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: N/
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the `as -constructed' plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
2
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: No public infrastructure work can start (including but not limited to the
water main, water and sewer services public sidewalk street cuts) until a preconstruction
meeting is held and discussion and acknowledgement of the street cut impacts and patch limits
are agreed upon.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: T—,t Date: ji /7/1
Approval for issuance:
City Engineer Approv 4tu-IJ
U
Page 3 of 5
5�[r%lZ
(Permit Issuance Date)
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Houska Automotive Autoparts Warehouse
Project A.K.A.:
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Langenberger
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6573
Construction Inspector: Steve Cicione
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6605
Cell (970) 692-4418
Current Planner: Peter Barnes
281 N. College Avenue, Fort Collins, Co 80524
(970) 416-2355
Water Utilities Engineer/ Wastewater Engineer:
Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970) 221-6854
Erosion Control Inspector: Jesse Schlam
700 Wood Street, Fort Collins, Co 80521
(970) 224-6700
Natural Resources: Lindsay Ex
281 N. College Avenue, Fort Collins, Co 80524
(970) 224-6143
Traffic Operations: Joe Olson
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970) 221-6815
Forestry: Tim Buchanan
215 N. Mason St., Fort Collins, Co 80524
(970) 221-6361
Page 4 of 5
Light and Power: Doug Martine
700 Wood Street, Fort Collins, Co 80521
(970) 221-6700
Developer's Contact Persons:
Project Manager: Paul Leeper, Heath Construction
141 Racquette Drive, Fort Collins, CO 80522
970-221-4195
Cell (970) 566-2281
Fax (970) 221-4258
paulleepergheathconstruction. com
Developer/ Owner: Dennis Houska, Houska D & N Family LLC
899 Riverside Ave, Fort Collins, Co 80522
970-482-0156
dennisghouskaautomotive.com
Project Engineer: Patricia Kroetch, North Star Design, Inc.
700 Automation Drive, Unit 1, Windsor, CO 80550
970-686-6939
Cell (970) 481-9873
tricagnorthstardesign inc. com
Architect/Planner: Alan Hauser, AIA, LEED AP, Hauser Architects, PC
3780 E. 150' Street, Loveland, Co 80538
970-669-8220
alghouserarchitects c.com
General Contractor: Paul Leeper, Heath Construction
141 Racquette Drive, Fort Collins, CO 80522
970-221-4195
Cell (970) 566-2281
Fax (970) 221-4258
paulleeper(&heathconstruction com
Grading Contractor/
Utility Contractor: Vince Kasperbauer, Dunrite Excavation
21506 WCR 1, Berthoud, CO 80513
970-532-4982
Fax (970) 532-0573
dunritex msn.com
Page 5 of 5
Concrete Contractor
Flat Work: Dave Marrou, Marrou Concrete, Inc.
625 Sherry Drive, Fort Collins, CO 80524
970-472-5100
Fax (970) 472-5200
davidmgmarrouconcrete com
Concrete Contractor
Structures: John Merriam, Merriam Concrete, Inc.
6933 Milner Mountain Ranch Rd, Fort Collins, CO 80522
970-226-5752
Fax (970) 226-6956
merriamjd@gmail.com
Paving Contractor: Tom McLaughlin, Don Kelm Construction, Inc.
6550 South County Road 5, Fort Collins, CO 80528
970-226-4111
Fax (970) 226-4115
tomm llongspeak.net
Landscape Contractor: Nick Nero, Nero Landscaping Services
P.O. Box 272377, Fort Collins, CO 80527
970-691-6376
Fax (970) 229-5923
nerolandscgpe@,nu52networks.net
Page 6 of 5
HOUSKA ALMOMOTIVE
AUTO PARTS WAREHOUSE
T HAUSER
10,000 BF
-AWm 0,,CC6LAV16 00LOAAM BOOM
A R C H I T E C T S
MMPLAN
37W EO 15M Stmt, SO, MI - L,d, CoBaM
��
970.669 VM
N
=
O
y�
f. W
0 0 0 0 0 0 0
o00000o00
0 0 0 0 0 0 0 D O D
0
O 0 0 0 0
o
N
W
DIL
E09 GS 69 Hf/90f
00606MO6o6
n �nONt7Nth
6464Q%6F*6464
i+j0000000
to
fA fist
t4406s
_Z
q�
Q
is
2
a
W W
a
a
LU
LL m
0000000
n l� 1f> O C6 Lq m
0000040000
inn M
O
0000OO
Lq 0 0 0 7 't
p
�0
{C41
OOmmOm
to f/9 fA fA 64 6s
00C Ob 1p
fA d9 ffl d^9����E9�
00
«► is to is to to
Q
W�
O
J
V
2
IL
N
W
m
F
O
p W
ar
Z
J
3
H
0000888
o 0 0 0 0 0 0 0 0 0
O
Cl 0 8 0 0 0 O
LL
W
UJI V
O O O O
o000000
fA fH fA !A 49 tf9 fA
O O O n q N O O
OOONfh�tn (O
omDOVMGons
fH O N N N N N
O O O O O O
Ono
oOc�N000
fH N N FA N9 to
Z
W
H9 to t9 to 49 69 N9
f/9 ffi
W
�2�-
Lu
Q
w
V ym
' W
p
o000000
o 0 o o
0 0000000
0 0 0o Ln n O O N o 0
0O00
`� o n o 0 0 0
a
a
4' W
NU)
W �(i
t;8
pn po po
�OLppOOROODOO
fA lA�anj. r
OL6 C) V tM Cn 8O5
tA64� NfV 64
NlppnppM00ODc
�tA f,H 199N04 O969�
W
tTY
O O
O d
fA u9 49 tr►
ti9 V9 tr► to fA
LL
Z
c
W
W L
p
J
Z
WLU
2
o�
C mZ
p WW
o000000
�ch�co�
00�00o
m
O
W pH
Q W
F
W
$
F a3
i
... a
N I
J
W
J
3
L. W
LL W>->-Q0Q Q0Q Q0Q
JJUU
LLLLU. Q0 Q0 Q0 QU QU QU QU
JJJ
CLL. LL. LL. LL LL
i H IJJ(nfn
m
O
zQ
IIlIJJ
W W W
W W W W W W W
W p
a Z
NO
Z m
U
m
IOi
Z
W
J
a 0
W
o
3
:3'
LU F
U)
►N- �
a
2 `m
a �_n 3
J o c
., o_
LLU
R
Q
0>
m
? c O in mm mH c
Ca ; n a
ZZ
Q3ooa
m0 a 0 �„ `v�U d
(D
v
24
M W
J
m O i 7 T 0 to
O' Q 3 f`CO _ N .r
7 O C .0
W O
yl
OLL
V H>
WNa
€ w U U N C C L «
o d m- c m
,.�_ d U N 2 L N a O y m c E o6 U y Z N
m m e c> m.r >£B °1 2 p
W
cc
c.
VI vl:El7F2T-,F2j
m &I NJ nJ;tj nj Al1.1 nj PI
$ ;;1 i4l R3 ;g "MS AlnP3
n
-I ej 41 v