Loading...
HomeMy WebLinkAboutK D PARK 132 WILLOX LANE - Filed CS-COMMENT SHEETS - 2012-03-19PROJECT COMMENT SREET f� �. Fort Collin's Current Planning DATE: July 13, 2006 RECEIVED A11.1 TO: Technical Services PROJECT PLANNER: �el t #19-06 132 W. Willox Lane PDP — Type I Please return all comments to the project planner no later than the staff review meeting: August 2, 2006 Note %flease identify your redlines for future reference ❑ 0 Problems Problems or Concerns (see below, attached, or DMS) -5, 6 61 Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS —Plat —Site — Drainage Report Other. —utility —Redline Utility _Landscape City of Fort Collins [2/2/07] The Willox Lane improvements shown on the Utility Plans are considered an interim condition since no off -site design was prepared with this project. Under this agreement with the City, the developer shall prepare and submit a detailed construction and design cost estimate for the curb and gutter & one lane of pavement along the entire frontage of Willox Lane. The City will review the estimate and the final agreed upon amount will be included in the development agreement for this project. This amount will need to be paid to the City prior to any building permit issuance. The sidewalk improvements will be considered ultimate improvements and City Street Oversizing will reimburse the developer for any portion of the sidewalk that is greater than 4.5 feet in width. See red -line comments on sheet 6 for additional clarification. Number: 70 Created: 2/2/2007 [2/2/07] Please add a NO PARKING signage detail to sheet 8 of the Utility Plans. Number: 71 Created: 2/2/2007 [2/2/07] If all of these comments are adequately addressed, you may submit a mylar print of the plans with the red -lines for final review and approval. Please call me at 416-2292 if you have any questions. Page 2 FINAL PLAN COMMENT SHEET Cite of part Collins Currelit planning DATE: January 17, 2007 TO: Engineering Pavement PROJECT PLANNER: Ted Shepard #19-06A 132 W. WILLOX LANE PDP — FINAL PLANS Please return all comments to the project planner no later than the staff review meeting: February 14, 2007 Note --Please identify your redlines for future reference No Problems ❑ Problems or Concerns (see below, attached, or DMS) .... 6 f Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Utility _Site _Drainage Report _Other. _Redline Utility _Landscape 6a Citv of Fort Collins REVISION Citvof Fort Collins COMMENT SHEET 0000� Current Planning DATE: September 20, 2006 TO: Technical Services PROJECT PLANNER: Steve Olt 0 (Steve Olt taking over project in Ted Shepard's absence) # 19-06 132 W. WILLOX LANE PDP — TYPE I SECOND ROUND OF REVIEW Please return all comments to the project planner no later than the staff review meeting: _Plat Utility October 4, 2006 Dote - No Problems ❑ Problems or Co lour redlines ms (see below, attached, or DMS) HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Site _Drainage Report _Other _Redline Utility _Landscape City of Fort Collins U Ceastpoint _( J i September 20, 2006 Mr, Ted Shepard City of Fort Collins Planning Department 28.1 N. College Ave. Fort Collins, CO Re: 132 W. Wiilox Lane PDP Dear Mr. Shepard, A.Desigri Collaborative Following are our responses and clarifications to the comments of Staff Project Review of August 21, 2006. ' Since our last submittal I have had the opportunity to meet with the new property owner, and discuss a more detailed program for the building and the site design. With this information and in response to some of the staff.comments there have been some changes to the site design. The building will be used for the production and warehouse of small engine parts and supplies, and office -space for employees. There is no commercial sales, or over -the counter sales from this facility. All parts and products will be received and shipped from this location. We have located an over -head door on the North West corner of the building for receiving materials and parts.. A second overhead door is located on the South end of the building for shipping. The main entry of the building is io:;aWd at the SouI West corner, facing W'I-'lox L.anc A second employee entry is located on the West side of the building: The parking area has been reduced to accommodate the estimated number of employees. Following.are responses to specific continents provided in the Staff Report: Engineering A plat will `be prepared, showing the new easements, and dedicated right of way, and included in the Final .Plan Review. Natural Resources There are no existing trees cn-site. No mitigation required, A trash enclosure has been shown on the North West corner of the building. Y'FA phu1:e (9701224.4034 IIan (970) 498.0843 The drive way is'24'-0" wide and double as a Fire Lane, and will comply wifh.,all c- naac eastpoint@frii.com requirements. co::esporcience 141 S. College Avenue Suite 103 Fort Collins, CO 80524 At this time, it is not anticipated there will be any Hazardous Maierials on site. We will verify this, and provide necessary documents as required with�the Final Development Plan. Zoning Two accessible parking spaces have been provided, and sized to be van accessible, and signed as such. A bike rack will be located near the main entry; see Site Plan If you have any additional questions,,please feel free to contact me. Sincerely, Donald rookshire F r 6 DATE: October 4, 2006 TO: Engineering Pavement PROJECT PLANNER: Anne Aspen # 24-04 Willow Street Lofts PDP — Type II SECOND ROUND OF REVIEW This project was originally submitted 7/4/2004. Revisions submitted here will resume the review of the same project. Please continue to enter comments into DMS under this number. Contact Anne Aspen with any questions. Please return all comments to the project planner no later than the staff review meeting: October 18, 2006 Note -Please identify your redlines for future reference No Problems ❑ Problems or Concerns (see below, attached, or DMS) Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins r 010 Project Comments She(06w awk et City of Fort Collins Selected Departments ______ Department: Engineering Date: October 6, 2006 Proiect: 132 W. WILLOX LN PDP - TYPE I All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: October 04, 2006 Note - Please identify your redlines for future reference Issue Contact: Marc Virata Topic: General Number: 53 Created: 10/4/2006 [10/4/06] Please ensure with the final plan that proposed street patching information is shown. Number: 54 Created: 10/4/2006 (10/4/06] Please consider using a faded type of lineweight for the existing utilities as it's difficult to interpret what utilities are new instead of existing. Issue Contact: Dan DeLaughter Topic: General Number: 20 Created: 7/31 /2006 [10/3/06] [mpv] The response letter indicated that a plat would be prepared and submitted with the Final Plan review for these dedications. As all plats require a type I or type 11 hearing, it would be more efficient for all parties if the project and associated plat go to hearing together. Alternatively, if the easements and right-of-way are dedicated by separate document, no hearing is required for these. Transportation Development Review Fees are aplicable in either scenario. (7/31/061 1 have not received any easement or ROW dedication documents. Number: 21 Created: 7/31/2006 [10/3/06] [mpv] The offsite design requirement has been waived per an email sent to the consulting engineer. [7/31/061 The offsite design requirement has not been waived and nothing has been shown yet. We will nof�ol jet fro mg to hearing, but be advised that prior to final Si ' ature Date HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Utility Redline Utility —T Landscape Other Page 1 r approval, we will need to see preliminary design of centerline and flowline profiles, with existing and proposed grade and groundlines. The requirement is 1000' to the west and out to the College/Willox intersection to the east. Number: 24 Created: 7/31 /2006 '[10/4/06] [mpv] In following up on this item, it appears the main concern is just ensuring that Positive drainage is ensured on the north side of Willox out to the curb and gutter section. I don't believe the plans show enough grading information to demonstrate this, but it can be deferred until final plan review. [7/31/06] Pavement may need to be improved on the south edge of the site in order for Willox Ln to drain properly. I will follow up with Rick Richter on this issue. Number: 25 Created: 7/31 /2006 [10/4/06] [mpv] Carried over for reference pertaining to the DA. [7/31/06] Our development agreement will specify, and it should be noted on the utility plans, that no parking will be allowed on the street at such time as Willox Ct. is made into a parallel circulation route connecting out to College Ave. per the access control plan. This is standard, since parking is not allowed on a major collector. If you would like to maintain on - street parking in the long-term, additional ROW should be dedicated to reach the minor collector standard. Page 2 FINAL PLAN COMMENT SHEET Citvof port Collins �.�tl!'l•C't2� I'l�x�a�ai���; DATE: January 17, 2007 TO: Technical Services PROJECT PLANNER: Ted Shepard #19-06A 132 W. WILLOX LANE PDP — FINAL PLANS Please return all comments to the project planner no later than the staff review meeting: February 14, 2007 Note - Please identify your redlines for future reference No Problems ❑ Problems or Concerns (see below, attached, or DMS) 1'c�rti N-/A / V'�_/C(.- Name (please CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape ham City of Fort Collins k Project Comments Sheet Selected Departments g Date: February 2, 2007 Project: 132 W. WILLOX LN PDP - TYPE I All comments must be received by Ted Shepard in Current Planning, no later than the staff review meeting: February 14, 2007 Note - Please identify your redlines for future reference Issue Contact: Randy Maizland Topic: Engineering Number: 63 Created: 2/2/2007 [2/2/07] Easement and ROW dedication legal descriptions look good. Please revise the documents per the attached red -lines and submit original signed deeds of dedication with attorney certifications. All review fees and County recording fees must be paid prior to utlity plan approval. See red -lines for clarification.,460 — PkArT'A('c � L �yL _ Lt(GAL 7D TL"ODI, OP,9 �P TY Number: 64 - — N �� m � a s�P zM�a6"- yy�� ,a ss Created: 2/2/2007 [2/2/07] Refer to the Sit Plan - Please show and label all NO PARKING signage to be installed by the developer on Willox Court. Number: 65 Created: 2/2/2007 [2/2/07] Please add secondary benchmark info to the cover sheet. City B.M. No. 40-97 Number: 66 Created: 2/2/2007 [2/2/07] In addition to Owner/Applicant, please include all consultant information on the cover sheet (i.e. Geotechnical Engineer with reference to soils report, architect etc... ). Number: 67 Created: 2/2/2007 [2/2/07] Please label sheets 3 and 4 FOR REFENCE ONLY in the lower right hand corner of the sheet. No City signature blocks required on these sheets. Number: 68 Created: 2/2/2007 [2/2/07] Please show and label the NO PARKING signs required for Willox Court on the Utility Plan sheet 5. Number: Created: 2/2/2007 d� O Date CHECK HE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape ' Page 1 0 EQF_4A-TT_0A,JS