HomeMy WebLinkAboutRIVERSIDE PARK 126 HEMLOCK STREET - Filed CS-COMMENT SHEETS - 2012-01-31DATE AUGUST 6, 1983 'wDEPARTMEN*t Ev-vqm-�;y\
ITEM: #62-83
COMMENTS
SIMPSON PUD
I
CITY OF FORT COLLINS P.O. BOX 580, FORT COLLINS, COLORADO 80522 303j 484 4220
DEVELOPMENT CENTER
EXT. 655
August 19, 1983
Mr. Dennis Jacobs
THE NEENAN COMPANY
2290 East Prospect Road
Fort Collins, Colorado 80524
Re: Simpson PUD (#62-83)
Dear Dennis:
Staff has reviewed the preliminary/final application for Simpson PUD and
has the following comments to make:
1. Fire hydrants within 500 feet of the site need to be shown on the
site plan.
2. The fire access around the rear of both buildings must be maintained
and kept clear of debris at all times.
3. Existing and proposed utility services must be shown.
4. A minimum of 200 feet from centerline to centerline offset is
required between the curbcut of Colorado Import Motors and the
eastern -most curbcut on the site. A variance to this requirement
should be requested, through Bonnie Tripoli, Development Coordinator.
Written documentation of the specific request, as well as rationale
for granting the request should be directed to Bonnie.
5. A minimum of 20 feet of setback between the flowline and first
parking stall or driveway is required. Shifting the proposed build-
ing back to the north would allow for the additional setback needed
along Hemlock. The aisle width for single -loaded parking spaces
can be a minimum of 20 feet.
6. Security lighting needs to be addressed.
7. The landscaping provided is shown to be 50/0. The City' s Administra-
tive Guidlelines for landscaping of commercial/industrial projects
recommend between 12-17% of the site be landscaped.
8. What will the area between the two buildings be used for? Will
there be any landscaping treatment within this area?
Dennis Jacobs
From: Sherry Albertson -ark
Au9list 19, 1983
i Page Two
M
9. A fence along the eastern propertyline between Colorado Imports
has been indicated on all past plans for the Simpson Service Co.
Will the fence be provided?
10. Credit has been taken on both use charts for "energy conservation".
If credit is to be given, detailed information regarding the pro-
posed conservation measures must be provided.
Five copies of the revised site plan addressing the above comments must be
submitted to this office by Tuesday, September 6, 1983. By Monday, September
19, 1983, a colored site plan and 81" x 11" reductions must be submitted.
If you have any questions or comments, please do not hesitate to contact
me.
Sincerely,
Sherry Al rtson-Clark
Senior Ci Planner
SAC:ro
cc: Bonnie Tripoli, Development Coordinator