November 22, 2011
See redline comments on the plans.
This project is subject to the existing development agreement in place on the property.
Work within the row permit and street cut permit will be needed prior to the start of
work, including all associated fees.
As noted within the general notes the project is required to replace or restore in kind any
damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project at the Developer's expense prior to the acceptance of completed improvements
and/or prior to the issuance of the first Certificate of Occupancy. The limits of the repairs
will be identified in the field by the City Engineering Inspector prior to and over the
course of the project and will not be shown on the plans.
A pedestrian connection from the existing ramp at the NE corner of the building (that ties
to the pedestrian spine) to the sidewalk along Custer Drive needs to be made with this
proj ect.
Cover Sheet — the name on the cover sheet and following pages needs to be listed as the
legal name is. The site, landscape, and elevations are not a part of the utility plans so
these should not be included in the index for the utility plans. They will not be filed
together.
Demolition plan — Also need to show the curb on Custer Drive that will be removed and
the associated street patch. Please add the street cut note to this sheet.
Utility Plan — Need to show and label the street patch and curb replacement on Custer
Drive. You have the patch within the parking lot referencing the street cut note — this
note really doesn't apply to the parking lot as the Engineering Inspector will not inspect
the patching in the parking lot. They will inspect the utility installations, but the parking
lot patch is not subject to the patching standards.
The following details are needed:
701 for the vertical curb that will be replaced on Custer in association with the sidewalk
chase construction.
1601 This identifies the sidewalk thickness.
1602 This identifies the sidewalk parameters.
City of
Fit Collins
December 01, 2011
Cody Snowdon
Northern Engineering
200 S. College Ave. Suite 10
Fort Collins, CO 80524
RE: The Shops at Rigden Farm, Lot 7, MA110062, Round Number 1
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fogov.com/deve/opmentreview
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter. For access of the redline edited plans please contact Project Planner, Noah Beals, at
970-416-2313 or nbeals@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Steve Olt, 970-221-6341, solt@fcgov.com
Topic: Building Elevations
Comment Number: 3
Comment Originated: 11/30/2011
11/30/2011: Section 3.5.3(D)(6)((b) of the Land Use Code sets forth the requirement that the
building have a recognizable "top" consisting of: 1) cornice treatments, other than just colored
"stripes" or "bands", with integrally textured materials such as stone or other masonry or
differently colored materials; 2) sloping roof with overhangs and brackets; 3) stepped
parapets. The lower, 20' high porrtion of the building does not appear to satisfy this
requirement. The proposed prefinished steel coping (golden buff in color) would be
considered a colored "stripe" or "band". The building does appear to satisfy Section 3.5.3(D)
(6)(a) with regards to a recognizable "base" treatment.
RESPONSE: the building exterior Elevations (and 3D views) on sheets Al and A2, have been revised to
indicate a "top" or cornice of 16" high metal panel system integrated with and complementary to the metal
parapet cap and in keeping with the overall design of this building, at the 20 feet high portion of the
building.
Topic: General
Comment Number: 1 Comment Originated: 11/29/2011
11/29/2011: The building must be set back from Custer Drive no more than 15' from the
common right-of-way & property line. Currently it is shown to be 16.27' from the property line.
This requirement is set forth in Section 3.5.3(B)(2)(b) of the Land Use Code.
RESPONSE: The building has been shifted towards Custer to maintain the 15' minimum setback
requirement.
Comment Number: 4 Comment Originated: 11/30/2011
11/30/2011: One handicapped parking space should be added to the parking area just west of
the building, near the front entries.
RESPONSE: A handicap stall has been added to the west side of the building.
Department: Current Planning
Contact: Steve Olt, 970-221-6341, solt@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 11/30/2011
11/30/2011: To ensure compliance with Section 3.2.1(D)(1)(c) "full tree stocking" of the Land
Use Code, please add an additional Red Jewel Crabapple tree along the easterly portion of
the south elevation of the building. The two Crabapple trees can be spaced so as not to block
the storefront windows on the southwesterly portion of the building.
RESPONSE: The additional Red Jewel has been added to the Landscape Plan.
Comment Number: 7 Comment Originated: 11/30/2011
11/30/2011: A deciduous shade or ornamental tree should be added to the island northwest of
the building where the bike racks are located.
RESPONSE: A Red Crab Apple has been added to the parking island on the Landscape Plan.
Topic: Site Plan
Comment Number: 2 Comment Originated: 11/30/2011
11/30/2011: On the Site Plan, please identify the paving materials to be used between the
sidewalk and store fronts along the west side of the building.
RESPONSE: The paving material is concrete, both on the sidewalk and the plaza area. The score
jointing has been revised.
Comment Number: 5
Comment Originated: 11/30/2011
11/30/2011: The existing off -site sidewalk stubbed out at the northeast corner of this pad site
must be continued south and tie into the proposed sidewalk along the north side of this
building. This would provide a continuous pedestrian connection internally between the
shopping center and the public sidewalk along Custer Drive.
RESPONSE: The off -site connection has been added to the plans.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/22/2011
11/22/2011: See redline comments on the plans.
RESPONSE: See redlines for responses.
Comment Number: 2 Comment Originated: 11/22/2011
11/22/2011: This project is subject to the existing development agreement in place on the
property.
RESPONSE: Acknowledged.
Comment Number: 3
Comment Originated: 11/22/2011
11/22/2011: Work within the row permit and street cut permit will be needed prior to the start of
work, including all associated fees.
RESPONSE: Acknowledged.
Comment Number: 4
Comment Originated: 11/22/2011
11/22/2011: As noted within the general notes the project is required to replace or restore in
kind any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project at the Developer's expense prior to the acceptance of completed improvements and/or
prior to the issuance of the first Certificate of Occupancy. The limits of the repairs will be
identified in the field by the City Engineering Inspector prior to and over the course of the
project and will not be shown on the plans.
RESPONSE: Acknowledged.
Department: Engineering Development Review
Contact: Sheri Langenberger, 970-221-6573,
Topic: General
Comment Number: 5
slangenberger@fcgov.com
Comment Originated: 11/22/2011
1112212011: Cover Sheet - the name on the cover sheet and following pages needs to be
listed as the legal name is. The site, landscape, and elevations are not a part of the utility
plans so these should not be included in the index for the utility plans. They will not be filed
together.
RESPONSE: The name has been revised to "Rigden Farm, 8t" Filing, The Shops at Rigden Farm,
Lot 7." The site, landscape and elevations have been removed from the Utility Plans.
Comment Number: 6 Comment Originated: 11/22/2011
11/22/2011: Demolition plan - Also need to show the curb on Custer Drive that will be removed
and the associated street patch. Please add the street cut note to this sheet.
RESPONSE: Demolition of curb, gutter and asphalt has been added to Custer Drive at the location
of the sidewalk culvert.
Comment Number: 7
Comment Originated: 11/22/2011
11/22/2011: Utility Plan - Need to show and label the street patch and curb replacement on
Custer Drive. You have the patch within the parking lot referencing the street cut note - this note
really doesn't apply to the parking lot as the Engineering Inspector will not inspect the patching
in the parking lot. They will inspect the utility installations, but the parking lot patch is not
subject to the patching standards.
RESPONSE: A street patch has been added to Custer Drive and the standard street patch note has
been referenced. The approximate limits of the street patch within the parking lot are still shown,
but the reference to the standard street patch not was removed.
Comment Number: 8
Comment Originated: 11/22/2011
11/22/2011: The following details are needed:
701 for the vertical curb that will be replaced on Custer in association with the sidewalk chase
construction.
1601 This identifies the sidewalk thickness.
1602 This identifies the sidewalk parameters.
RESPONSE: These details have been added.
Comment Number: 9
Comment Originated: 11/23/2011
11/22/2011: A pedestrian connection from the existing ramp at the NE corner of the building
(that ties to the pedestrian spine) to the sidewalk along Custer Drive needs to be made with this
project.
RESPONSE: A sidewalk connection from the NE corner of the property to Custer Drive has been
added to the plans.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/22/2011
11/22/2011: Please coordinate power requirements, transformer placement, and electric
development charges with Light & Power Engineering (221-6700).
RESPONSE: the layout has been coordinated with Doug Martine. The project will coordinate with
City of FC Light & Power Engineering and its requirements.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/01/2011
12/01/2011: No comments except add a sentence in the drainage letter that a $1,500 erosion
escrow is required at time of building permit.
RESPONSE: A sentence regarding the erosion escrow has been added to the conformance letter.
Department: Technical Services
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 11/23/2011
11/23/2011: We would prefer that the Utility Plans be separate from the Site, Landscape, &
Elevation Plans. They will be filed separately.
RESPONSE: The site, landscape and elevations have been removed from the Utility Plans.
Department: Water -Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcqov.com
Topic: Construction Drawings
Comment Number: 2
11/29/2011: See redlined plans for other comments.
RESPONSE: See redlines for my responses.
Topic: Easements
Comment Originated: 11/29/2011
Comment Number: 1 Comment Originated: 11/29/2011
11/29/2011: Provide easement up to and including the curb stop (Minimum width -10 feet).
RESPONSE: A 10' Easement has been added to the plans. An easement exhibit and description
has been included with this submittal.
Topic: Landscape Plans
Comment Number: 3 Comment Originated: 11/29/2011
11/29/2011: Adjust shrubs on east side of building to provide 4 feet of separation from the
sewer service.
RESPONSE: The shrubs in this area have been exchanged for ornamental grasses.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 11/17/2011
Mechanical/Utility equipment (meters and electrical panels) shall be painted to match the
building surface it is attached to.
RESPONSE: a note has been added, to East Building Elevation - drawing 2 on sheet Al.
Topic: Site Plan
Comment Number: 1 Comment Originated: 11/17/2011
11/17/2011: The handicap parking spaces were located on the north side of the pad site
because the anticipation was the main entrances for the building were also to be located on that
side. However the development plan indicates the main entrances to be on the west side of
the building. Therefore at least one handicap space should be placed in the parking space
that abut the west side of the building, this would include a handicap ramp also on that side.
RESPONSE: A handicap stall has been added to the west side of the building.