HomeMy WebLinkAboutHARMONY TECHNOLOGY PARK ODP FOURTH AMENDMENT - Filed O-ODP/MASTER PLANS - 2012-01-27 (2)�0
FOURTHAMENDMENTTO HARMONYTECHNOLOGYPARK
OVERALL DEVELOPMENT PLAN
LOCATED IN THE NORTH HALF OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6th P.M.
CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
EXISTING SIGNALIZED
INTERSECTION EXISTING SIGNALIZED EXISTING
INTERSECTION SIGNALIZED
' INTERSECTION
- - -- m = -- - HARMONY CORRIDOR SETBACK
z 4/lll 6.9 ACRES
�_ n!!ti !!!llrlllff>tl uunuul!!!
!l ■lu■ll■uWulaaa��� ir!!/lllJtllrllrr !lulu■!!!/rllllul/l■
USES
SECOIVIj4�t �
n - --G
PIRESTON
CENTER
:
t
INTEL
(EXISTING)
32.0 ACRES
-t 1nn�rcw�
DMVE
(Exts)
WILDWOOD
SUBDIVISION
(3.0 Gross Density,
4.0 Net Density)
PRIVATE ACCESS
PARCEL BOUNDARY (TYP.)
TIMBERWOOD DRIVE
EXISTING FULL TURN l
INTERSECTION 7
------ ----------------------------- ----- -----------------------------
80' HARMONY CORRIDOR
LANDSCAPE SETBACK
S
Z
Y PRIMARY &
a SECONDARY USES
0 21.5 ACRES TOTAL
a = 15.93 ACRES PRIMARY
1- 5.57 ACRES SECONDARY
0.35 FAR
w ♦ ♦ ♦ (+/- 328,000 S.F. GFA)
Ow
Z°
= w X wW\
J /LU
~
Wo X �Of
~U X �U)
Zof
X 00
Ow
♦ O
♦ ♦ ♦ }0
�w
aw
J
4
(PUBLIC ROAD
ACCESS) - -
FUTURE
TRANSPORTATION
PRIMARY USES ACCESS POINT
54.1 ACRES
0.35 FAR
(+/- 825,000 S.F. GFA)
C
♦ ♦ ♦ ♦ ♦♦ ♦
PRIMARY USES ♦ ♦ ♦ ♦ pR�c�s�0/V DRIVE
40.55 ACRES
0.35 FAR
607,000 S.F. GFA)
SECONDARY
USES
(NON-
RESIDENTIAL 1
USES) ♦ 7
2.0 ACRES
0.35 FAR + FUTURE ,
+/- 30,500 S.F. TRANSPORTATION FUTURE
GFA) ACCESS POINT TRANSPORTATION
♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ACCESS POINT
EX
�llurlllllllrr!!rrlllrrlll■■lrlrlrrllllrllrlarilrilrlrrllrillrrlllllllllrllrill!rlrrlrill!rlrillrilllllrrlllllllllrllrlrrlrrlllllll J
EXISTING
SIGNALIZED INTERSECTION ROCK CREEK DRIVE
G
PRIMARY & SECONDARY USES
13.39 ACRES TOTAL
4.215 ACRES PRIMARY
9.175 ACRES SECONDARY
FUTURE
RIGHT-IN/RIGHT OUT
INTERSECTION
HARMONY ROAD
MAJOR ARTERIAL
NOT A PART
OF THIS ODP
80' HARMONY CORRIDOR
LANDSCAPE SETBACK
FUTURE
ACCESS PONTz
1
w
J-1
TIMBERWOOD DRIVE 1
50
+ H
Wp
=)0
aw
PRIMARY USES
Zo
13.9 ACRES
5+
L
LA
♦ ♦
SECONDARY USES
11.7 ACRES
♦
. ♦+♦ M
J+-#-
SECONDARY USES
13.5 ACRES,
♦♦♦♦
HARVEST PARK (COLLECTOR STREET) -
SUBDIVISION
(4.41 Gross Density
5.08 NotDensity)-
FOSSIL RIDGE HIGH SCHOOL -
LAND USE TABLE:
(UNCHANGED FROM HARMONY TECHNOLOGY PARK THIRD AMENDMENT) (-CHANGED PER HARMONY TECHNOLOGY PARK FOURTH AMENDMENT) (UNCHANGED FROM HARMONY TECHNOLOGY PARK THIRD AMENDMENT) NOTES:
APPROXIMATE APPROXIMATE
APPROXIMATE
FM
K +
PRIMARY USES
19.7 ACRES
♦
M
PRIMARY USES
10.4 ACRES
♦ ♦ ♦ ♦ ♦
N
SECONDARY USES
11.2 ACRES
18 DU/AC
(+/- 200 Units)
NOT A PART
OF THIS ODP
ODP BOUNDARY (TYP.)
NATURAL RESOURCES
BUFFER
(50' FROM CREEK)
L 0.9 ACRES
0*44
P -
OPEN SPACE
0.36 AC.
M
0
SECONDAF�*
USES
14.15 ACRES
18 DU/AC
(+/- 250 Units)
DRAINAGE &-
DETENTION
AREA
2.84 ACRES
FUTURE STREET
x
WILLOW BROOK CONNECTION
SUBDIVISION 1l
(Proposed Phase I PDP
4.9 Gross Density,
4.2 Net Density,
5.4 DU/AC)
PARCEL
PROPOSED USES
ACREAGE
PERCENTAGE
PARCEL
PROPOSED USES
ACREAGE
PERCENTAGE
PARCEL
PROPOSED USES
ACREAGE
PERCENTAGE
1. PRIMARY, SECONDARY AND ACCESSORY USES SHALL BE AS DEFINED IN THE CITY OF
A
Office/Manufacturing (existing)
32.0 ac.
11.7%
G`
Secondary
9.175 ac.
3.4%
N
Secondary
11.2 ac.
4.1 %
FORT COLLINS LAND USE CODE.
B
Secondary
0.63 ac.
0.2%
Primary
4.215 ac.
1.5%
O
Secondary
14.15 ac.
5.2%
2. FUTURE DEVELOPMENT WITHIN THIS OVERALL DEVELOPMENT PLAN SHALL BE SUBJECT
Child Care Center (existing)
H
Primary
13.9 ac.
5.1 %
P
Secondary
0.36 ac.
0.1 %
TO THE UNDERLYING HARMONY CORRIDOR ZONE DISTRICT REQUIREMENTS AND
DEVELOPMENT STANDARDS EFFECTIVE AT THE TIME OF FORMAL DEVELOPMENT
Primary
40.55 ac.
14.8%
I'
Secondary
11.7 ac.
4.3%
Q
Open Space
4.16 ac.
1.5%
APPLICATION.
D
Secondary (Non-residential)
2.0 ac.
0.7%
J
Secondary
13.5 ac.
4.9%
R
Open Space Natural Resource Buffer 2.84 ac.
1.0%
3. WATER IS PROVIDED BY THE CITY OF FORT COLLINS AND SANITARY SEWER IS PROVIDED
E
P'
°
BY THE SOUTH FORT COLLINS SANITATION DISTRICT.
nmary 54.1 ac. 19.8 /° K' Pnmary 19.7 ac. 7.2% S Primary 15.93 ac. 5.8%
F Open Space 6.9 ac. 2.5% L Open Space Natural Resource Buffer 0.9 ac. 0.3% Secondary 5.57 ac. 2.1%
Harmony Corridor Setback M. Primary 10.4 ac. 3.8%
SUB -TOTALS (PARCELS M-S) 54 21 ac 19 8%
SUB -TOTALS (PARCELS A-F)
136.18 ac.
49.7%
Primary
126.65 ac.
46.2%
i Secondary
2.63 ac.
1.0%
SUB -TOTALS (PARCELS G-M)
Primary
Secondary
83.49 ac.
48.215 ac.
34.375 ac.
30.5%
17.6%
12.6%
Primary
ac.
.8%
M I N E R f} /►� `C N O M EN T
Secondary
35.
1.28 28 ac.
11.4%
TOTALS (ALL PARCELS)
273.88 ac.
100%
MA it 00 (e 9
Primary
190.795 ac.
69.7%
Secondary
68.285 ac.
24.9%
JANU/r A-Y I It a
LEGEND:
NOT A PART
OF THIS ODP
NOT A PART
OF THIS ODP
X
X
■■/rrlrrlr rrlrlrrrlr ODPBOUNDARY
♦ ♦ ♦ ♦ PEDESTRIAN / BICYCLE CIRCULATION
PUBLIC STREET
TRANSPORTATION CONNECTION
NORTH
200 0 200 400 60OFeet
( IN FEET) 84 -M
1 inch = 200 ft.
rZo
w Z O - '
D� O w¢ w O
U Z m' w' V
g 0, Z o o
2
Q OZ Z Vlf'-
N Z O w w Z z
J
� g '0 ,0) o
aZo
m
0
J N
W=
F N
all
>
��
V)
0:z
m
}
Wo
?o
a
K M
dh
w
0z
w
a
a
Y �
F-
}z W
W C
OJ 0 �
ZW O
J
vQ W
W i
>- W
OO
2 L J
LwM
U
Sheet
Of 1 Sheets