Loading...
HomeMy WebLinkAboutSTUART HILL PUD - Filed CS-COMMENT SHEETS - 2012-01-04TO: Doug Martine, Light and Power Department FROM: Bill,Linfield Engineering Services RE: Subdivision Utility Plans DATE: 3 " � 1•�.p � . Submitted for your review and comment are utility plans for Please respond at your earliest convenience. ��- .�o 9 L �- - E. C v-r r a v� \' i s c 0.` Sfir1 ,! -5 -i✓ i S 3-- i'?- go �j �s' Syo wA! DATE: DEPARTMENT w�+, Ld. 0 c ■r CD ■a co item PO.D. Comments Exiltinbpproved Utility Plans will have to be revised to reflect changes. DATE: U1416z DEPARTMIF-W.,T 0 a 0 co Item Comments c �NGpDS — �l/Sua/ /H3�✓c�c24� DATE! �14 /6z--OEPARTMFT Item �Ca -�3 .d'�u/,t�f �iz2C ? U. D . Comments CD c011 AF 02- FA 0 A-1 EA-)(Z,AJF-f-'-Q- cf) ZT-Oa(YN bkAiAjA6e F4CJL%-rl9S 70 At>�L 11"PEcAviva-S 44-EA E E A. a %1W CITY OF FORT COLLINS P.O. BOX 580, FORT COLLINS, COLORADO 80522 PH (303) 484-4220 PLANNING DIVISION EXT.655 June 22, 1982 Mr. Mike Schmidt Engineering Professionals 2020 Airway Avenue Fort Collins, CO 80524 Dear Mike: Staff has reviewed the applications for final replatting of the Stuart Hill PUD Subdivision and would offer the following comments: 1. The plat should include a statement of land ownership and notary. 2. The approval block of the "Director of Engineering Services" should be "City Engineer." 3. What is the east -west running line in the middle of the plat? 4. The right-of-way of Stuart Street should be more clearly delineated. 5. The dimension of the east property line of Tract A should be dimensioned. 6. The easement for Tract A should read, "Utility, public access, and drainage easement." 7. The applicants should provide a letter from an engineer indicating adequacy of existing storm drainage facilities to handle additional impervious area. 8. Existing approved utility plans will have to be revised to reflect proposed changes. I would suggest we meet as soon as possible to discuss the above comments. The revisions to the plats should be submitted as soon as possible (five copies of each). Also, on Monday, July 19, 1982, 8-1/2"xll" reductions and colored renderings of the plats should be delivered to this office. If you should have any questions, please feel free to call. Sincerely yours, Joe Frank Senior Planner JF/fsr cc: Mauri Rupel, Development Engineer Ken Waido, Chief Planner Dave Younger, Sutter Architects