Loading...
HomeMy WebLinkAboutRCD PLAZA SOUTH REPLAT LOTS 2-5 - Filed DA-DEVELOPMENT AGREEMENT - 2011-12-29DEVELOPMENT AGREEMENT THIS AGREEMENT, made and entered into this 15— day of &4a-3, A.D. 190, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as "the City," and RCD PLAZA ASSO- CIATES, Partnership, hereinafter referred to as "the Developer," WITNESSETH: WHEREAS, the Developer is the owner of certain property situate in the County of Larimer, State of Colorado, and legally described as follows, to -wit: R.C.D. P.U.D., Phase II, being a replat of Lots 2, 39 4 and part of Lot 5 and Colboard Drive of the RCD Plaza South Subdivision, located in the northeast 1/4 of Section 35, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. WHEREAS, the Developer desires to develop said property and has submitted to the City a subdivision plat and/or a site plan, a copy of which is on file in the Office of the City Engineer and made a part hereof by reference; and WHEREAS, the Developer has further submitted to the City a utility plan for said lands, a copy of which is on file in the office of the City Engineer and made a part hereof by reference; and WHEREAS, the parties hereto have agreed that the development of said lands will require increased municipal services from the City in order to serve such area and will further require the installation of certain improvements primarily of benefit to the lands to be developed and not to the City of Fort Collins as a whole; and WHEREAS, the City has approved the subdivision plat and/or site plan submitted by the Developer subject to certain requirements and conditions which involve the installation of and construction of utilities and other municipal improvements in connection with said lands. NOW, THEREFORE, in consideration of the premises and the terms and conditions acknowledged by the parties hereto, it is agreed as follows: I. General Conditions. A. All water lines, sanitary sewer collection lines, storm sewer lines and facilities, streets, curbs, gutters, side- walks, and bikepaths shall be installed as shown on the approved utility plans and in full compliance with the Council approved standard specifications of the City on file in the Office of the City Engineer at the time of approval of the utility plans relating to the specific utility, subject to any time limitations as provided by Ordinance. B. No building permit for the construction of any structure within the development shall be issued by the City until the water lines, fire hydrants, sanitary sewer and streets (with at least the base course completed) serving such struc- ture have been completed and accepted by the City. No build- ing permits shall be issued for any structure located in excess of six hundred sixty feet (660') from a single point of access. -2- C. Any water lines, sanitary sewer lines, storm drainage lines, and/or streets described on Exhibit "A", attached hereto, shall be installed within the time and/or sequence required on Exhibit "A". If the City Engineer determines that any water lines, sanitary sewer lines, storm sewer facilities and/or streets shown on the utility plans are required to provide service or access to other areas of the City, those utilities shall be installed within the time determined by the City Engineer as referred to under "Special Conditions" in this document. D. Except as otherwise herein specifically agreed, the Developer agrees to install and pay for all water, sanitary sewer and storm sewer facilities and appurtenances, and all streets, curbing, gutter, sidewalks, bikeways and other municipal facilities necessary to serve the lands within the develop- ment. E. Street improvements (except curbing, gutter and walks) shall not be installed until all utility lines to be placed therein have been completely installed, including all indivi- dual lot service lines leading in and from the main to the property line. F. The installation of all utilities shown on the utility draw- ings shall be inspected by the Engineering Division of the City and shall be subject to such department's approval. -3- The Developer agrees to correct any deficiencies in such installations in order to meet the requirements of the plans and/or specifications applicable to such installation. In case of conflict, the utility drawings shall supercede the standard specifications. G. All storm sewer facilities shall be so designed and con- structed as to protect the downstream properties and to adequately serve the property to be developed (and other lands as may be required, if any). The developer hereby agrees to indemnify and hold the City harmless from any and all claims that might arise, directly or indirectly, as a result of the discharge of storm drainage or seepage waters from the devel- opment in a manner or quantity different from that which was historically discharged. H. The Developer shall pay storm drainage basin fees in accor- dance with Chapter 93 of the City Code. Storm drainage improvements eligible for credit or City repayment under provisions of Chapter 93 are described together with the estimated cost of the improvements on the attached Exhibit "B", which improvements shall include right of way, design and construction costs. The basin fee payable by the Developer shall be reduced by the estimated cost of said eligible improvements. Upon completion of such eligible improvements, the amount of such reduction shall be adjusted to reflect the actual cost. If the cost of the eligible improvements con- -4- structed by the Developer and described in the above mentioned exhibit exceeds the amount of the storm drainage fees payable for the development, the City shall reimburse the excess cost out of the Storm Drainage fund upon completion of the improve- ments and approval of the construction by the City. I. The Developer shall provide the City Engineer with certified Record Utility Drawing Transparencies on Black Image Diazo Reverse Mylars upon completion of any phase of the construc- tion. 2. Special Conditions. A. Storm drainage lines and appurtenances must be completed by the Developer and accepted by the City prior to the issuance of a Certificate of Occupancy. 3. Miscellaneous. A. The Developer agrees to provide and install, at his expense, adequate barricades, warning signs and similar safety devices at all construction sites within the public right-of-way and/or other areas as deemed necessary by the City Engi- neer in accordance with the City's "Work Area Traffic Control Handbook" and shall not remove said safety devices until the construction has been approved by the director. B. The Developer shall, at all times, keep the public right-of- way free from accumulation of waste material or rubbish caused by his operation, shall remove such rubbish no less than weekly and, at the completion of the work, shall remove all such waste materials, rubbish, tools, construction equipment, -5- machinery, and surplus materials from the public right-of-way. He further agrees to maintain the finished street surfaces free from dirt caused by his operation. Any excessive ac- cumulation of dirt and/or construction materials shall be considered sufficient cause for the City to withhold building permits and/or certificates of occupancy until corrected to the satisfaction of the City Engineer. If the Developer fails to adequately clean such streets within two (2) days after receipt of written notice, the City may have the streets cleaned at his expense and he shall be responsible for prompt payment of all such costs. C. The Developer hereby insures that his subcontractors shall cooperate with the, City's construction inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the inspector's opinion, is hazardous to the public health and welfare. D. When the inspector determines that erosion (either by wind or water) is likely to be a problem, the surface area of erodable earth material exposed at any one time shall not exceed 200,000 square feet for earthworks operations. Temporary or permanent erosion control shall be incorporated into the subdivision at the earliest practicable time. By way of explanation and without limitation, said control may consist of seeding of approved grasses, temporary dikes, gabions, and/or other devices. am APPRAVED E. The Developer shall, pursuant to the terms of this agreement, complete all improvements and perform all other obligations required herein, as such improvements or obligations may be shown on the original plat, or on any replat subsequently filed by the Developer, and the City may withhold such buil- ding permits and certificates of occupancy as it deems neces- sary to ensure performance hereof. F. This Agreement shall be binding upon the parties hereto, their successors, grantees, heirs, personal representatives, and assigns and shall be deemed to run with the real property above described. G. Nothing herein contained shall be construed as a waiver of any requirements of the City Code, and the Developer agrees to comply with all requirements of the same. THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation B �IVI 1 y anager JAMES R. MEITL DEPUTY CITY MANAGER R.C.D. PLAZA ASSOCIATES, Partnership �i2L�l/�vZx� By: Garth W. Rogers, neral Partner -7- CM EXHIBIT "A" R.C.D. P.U.D., Phase II 1. Schedule of water lines to be installed out of sequence. Not Applicable. 2. Schedule of sanitary sewer lines to be installed out of sequence. Not Applicable. 3. Schedule of street improvements to be installed out of sequence. Not Applicable. 4. Storm drainage improvements to be installed out of sequence. See Paragraph 2(A), page 5