City of Fort Collins COMMENT SHEET
Current Planning
DATE: August 2�2006 TO: Engineering
PROJECT PLANNER: Shelby Sommer
# 18-06 606 S. Howes Boarding House PDP - TYPE I
SECOND ROUND OF REVIEW
Please return all comments to the project planner no later than the staff
review meeting:
September 6, 2006
Note --Please identify vour redlines for future reference
❑ No Problems
,Problems or Concerns (see below, attached, or DMS)
<,- - cej l- 'e s . � I - M o/- c0,,Y„ .. �-s
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
City of Fort Collins
AM%
STAFF PROJECT REVIEW
City of Fort Collins
ANDREW LUTTROPP
1719 NORWOOD LN
FORT COLLINS, CO 80525
Date: 09/08/2006
Staff has reviewed your submittal for 606 S HOWES STREET BOARDING HOUSE -
PDP, # 18-06 - TYPE I, and we offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 26 Created: 8/29/2006
[8/29/06] The owner's certification blocks do not need to be signed or notarized at
this stage. If the project is approved at the public hearing, and after your plans are
finalized with no outstanding issues, I will ask you to submit final mylars for the City
to record. These signatures are required at the final mylar stage only.
Number: 27 Created: 8/29/2006
[8/29/06] The title on the right hand side of sheet one is missing a 'T' on the word
"street."
Topic: Public Hearing
Number: 28 Created: 8/29/2006
[8/29/06] This project is ready for a Type I (Administrative) Public Hearing. I have
scheduled the hearing for 5:30 pm on Tuesday, September 26 with the
Administrative Hearing Officer. The hearing will be held in Conference Room A of
the City building at 281 N. College.
A minimum of two weeks notice is required for all affected property owners (APOs).
I will put together a letter and map to send to the mailing list that you provided with
your application, with a brief project summary and invitation to attend the public
hearing. I will also prepare a staff report recommending approval of this project, with
a thorough evaluation of this project according to the Land Use Code. You should
be prepared to give a brief project summary and add any additional information you
think would be relevant. If anyone from the public attends the hearing, time will be
allotted for questions or comments.
After the hearing, the Administrative Hearing Officer will issue a written decision
within 10 working days. Any member of the public may appeal the decision within
14 days of the decision. After the appeal period passes, you may submit your final
plans (if there are any outstanding comments to be corrected) or mylars for
recording. The $1000 Final Plan Transportation Development Review Fee will be
due at the time the final plans are submitted.
Page 1
Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 29 Created: 9/7/2006
[9/7/06] No issues
Department: Engineering Issue Contact: Randy Maizland
Topic: General
Number: 23 Created: 8/23/2006
[8/23/06] Change "Assigned" to "Dedicated by separate document" for the utility
easement.
Number: 24 Created: 8/23/2006
[8/23/06] The easement dedication must have an attorney certification.
Number: 25 Created: 8/23/2006
[8/23/06] A $1000 fee will be due at time of final compliance for Transportation
Development Review fees, and $16 will be due for filing fees for the easement by
separate document.
Topic: Street Oversizing
Number: 17 Created: 8/1 /2006
[8/25/06]
[8/1/06] Street Oversizing Comments (Contact Tim Tuttle):
1. SOS fee due will be $1700.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely,
% 1�,
ShelbySomr%er
Associate City Planner
Page 2
Project Comments Sheet
Selected Departments
Department: Engineering
Date: August 24, 2006
Project:
606 S HOWES STREET BOARDING HOUSE - PDP, # 18-06 - TYPE I
All comments must be received by Shelby Sommer in Current Planning, no later
than the staff review meeting:
September 06, 2006
Note - Please identify your redlines for future reference
Issue Contact: Dan DeLaughter
Topic: Street Oversizing
Number: 23 Created: 8/23/2006
[8/23/06] Change "Assigned" to "Dedicated by separate document" for the utility easement.
Number: 24 Created: 8/23/2006
[8/23/06] The easement dedication must have an attorney certification.
Number: 25 Created: 8/23/2006
[8/23/06] A $1000 fee will be due at time of final compliance for Transportation
Development Review fees, and $16 will be due for filing fees for the easement by separate
document.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat X Site Drainage Report Other
Utility Redline Utility _' Landscape
Page 1
�6,i STAFF PROJECT REVIEW
City of Fort Collins
ANDREW LUTTROPP Date: 08/03/2006
1719 NORWOOD LN
FORT COLLINS, CO 80525
Staff has reviewed your submittal for 606 S HOWES STREET BOARDING HOUSE -
PDP, # 18-06 - TYPE I, and we offer the following comments:
ISSUES:
Department: Advance Planning
Topic: Site Plan
Number: 14
[7/25/06] No comments.
Issue Contact: Timothy Wilder
Created: 7/25/2006
Department: Current Planning Issue Contact: Shelby Sommer
Topic: General
Number: 1 Created: 7/12/2006
[7/12/06] Beth Sowder (Neighborhood Services): This property has received noise
violations resulting in Public Nuisance violations. The change to a boarding house
would not change the status of this property with regards to the Public Nuisance
Ordinance. We would like to see voluntary plans to resolve noise issues. I have
talked with Neighborhood Services and asked them to stop by the subject
property during their awareness efforts. I have also provided the tenants a
copy of the flyer that Neighborhood services publishes.
Number: 15 Created: 7/28/2006
[7/28/06] Bonnie Ham (Post Office): Developer must provide adequate mailboxes
on the front of the house. There are adequate mailboxes attached to the front of
the house
Number: 18 Created: 8/2/2006
[8/2/06] Rick Lee (Building Inspection): Please find attached the various
requirements for boarding house conversions. I will be obtaining building permits
to comply with boarding house conversion requirements as they relate to the
structure.
Number: 20 Created: 8/3/2006
[8/3/06] Please add a signature block for the parking lot owners (or representative
for all owners) in addition to the owner's signature block for 606 S. Howes. This
signature block has been added to the plans and has been signed.
Topic: Landscaping
Number: 12 Created: 7/25/2006
[7/25/06] The landscaping on the site plan does not appear to match the
landscaping shown in the photographs. Please show existing landscaping in more
Page l
detail (especially around the parking area and front yard) so that we can determine if
additional landscaping will be required. A more Accurate depiction of the
Landscape has been added to the site plan and should satisfy the landscape
requirements.
Topic: Site Plan
Number: 13 Created: 7/25/2006
[7/25/06] Closets and utility rooms should not be included as part of the total
habitable floor space. Please revise this calculation on the cover page. Total
square foot calculation have been amended to eliminate dis-allowed
squarefootage.
Department: Engineering Issue Contact: Dan DeLaughter
Topic: General
Number: 7 Created: 7/18/2006
[7/18/06] Parking stalls should be dimensioned. The majority of spaces shown in
your lot are 8' wide and not very long. Up to 40% of your spaces may be compact
(8' by 15'), but the rest must be to standard (9' by 19'). Amended site plan shows
parking space dimensions the comply with this requirement.
Number: 8 Created: 7/18/2006
[7/18/06] The 8' utility easement must be dedicated by separate document, and a
TDRF application must be filled out with appropriate fees paid to engineering.
Please contact me at 221-6605 for questions regarding this easement dedication.
This easement must be behind the back of alley ROW. It cannot include alley area.
Easement has been added to site plan and application and fees have been
paid.
Number: 9 Created: 7/18/2006
[7/18/06] Add dimension arrows and labels for easements, ROW, and sidewalks as
indicated on redlines. Added to site plan.
Number: 16 Created: 7/31 /2006
[7/31/06] It does not appear that alley improvements will be required with this
project. Please confirm with Rick Richter. No alley improvements are required.
Topic: Street Oversizing
Number: 17 Created: 8/1/2006
[8/1/06] Street Oversizing Comments (Contact Tim Tuttle):
1. SOS fee due will be $1700. Fee will be paid.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric Utility
Number: 2 Created: 7/13/2006
[7/13/06] If developer requires any changes to the electric system (including meter
location and/or electric capacity), please coordinate with Light & Power Engineering
Page 2
221-6700. No changes are anticipated but if changes are required I will
coordinate.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 4 Created: 7/14/2006
[7/14/06] No issues. Due to the exist site conditions and shared use of the existing
trash enclosure staff feels that it would not be reasonably feasible for this project to
meet the requirements of section 3.4.5 of the Land Use Code. Thank you
Department: Transportation Planning Issue Contact: Kurt Ravenschlag
Topic: General
Number: 19 Created: 8/2/2006
[8/2/06] No Comment
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic: Water/WW
Number: 3 Created: 7/13/2006
[7/13/06] No comments.
Department: Zoning Issue Contact: Gary Lopez
Topic: Zoning
Number: 5 Created: 7/14/2006
[7/14/06] Landscape plan and photos don't seem to provide info. as to landscaping
in the front yard. Are there parkway trees and/or trees in the front yard? There
should be. Please indicate or add such trees. Trees have been indicated on site
plan.
Number: 6 Created: 7/14/2006
[7/14/06] The parking lot doesn't indicate if it is improved. Is it hard surfaced?
Another question is whether the parking (where parking is assigned from another
property) also needs landscaping improvement? Parking lot is improved with
pavement drainage and curb and gutter this has been indicated on site plan.
Parking lot landscaping has also been indicated on site plan.
I have attached a revision routing sheet which indicates how many of each revised
item to resubmit for review. City staff will take two weeks to review the revisions
after they are submitted, and you will be invited back to another Wednesday morning
staff review meeting.
In addition to this comment letter, there are redlined plans from Engineering and
Planning that correspond with the comments. Please be sure to return all of the
redlined plans when you re -submit.
Page 3
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
Sincerely,
Shelby Sommer
Associate City Planner