REVISION
City of Fort Collins COMMENT SHEET
Current Planning
DATE: April 3, 2006 TO: Engineering
PROJECT PLANNER: Cameron Gloss
\&�
#7-06 Rocky Mountain Raptor Program ODP & First first Filing
PDP — Type II
SECOND ROUND OF REVIEW
Please return all comments to the project planner no later than the staff
review meeting:
April 5, 2006
Note -_Please identify your redlines for fut_ ure reference
❑ No Problems
❑ Problems or Concerns (see below or attached)
ivume (pteaseprino
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report Other
_Utility _Redline Utility _Landscape
A1110MEM,
t"
City of Fort Collins
STAFF PROJECT REVIEW
City of Fort Collins
MICKEY WILLIS
PARADIGM REAL ESTATE & DEVELOPMENT Date: 03/30/2006
2969 SPRING HARVEST LANE
FORT COLLINS, CO 80528
Mickey,
Staff has reviewed your submittal for ROCKY MOUNTAIN RAPTOR PROGRAM ODP AND
FIRST FILING PDP, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dan DeLaughter
Topic: General
Number. 8
3/21/2006
13/21/061 Scanability is an issue on both the PDP and ODP. Created: The grayscale and diagonal
line patterns should be removed.
Response — Grayscale Topic: ODP has been removed
Number. 6
[3/21/061 Please show how the site meets Section 3.6Created: 3/21/2006
odeor
address this standard. Currently, no proposed street connectio sea a shown. Land UseCf all, parcels
are included in the ODP, provision of future access should be considered for each parcel,
with special consideration given to connections to the existing street network (Main St.,
Martinez St.).
Per our meeting on 3/22/06, the ODP should seek a modification to the LUC standard, and
the PDP should show appropriate connections.
or access is allowed for these remises. v v�� "` ca es and no
Number. 7
13/21/061 A vicinity map must be included on the ODP. Created: 3/21/2006
Response — we included a vicinity man 24" x 36" with the ODP annhcation
on the ODP map.
Topic: PDP
Number. 9
13/21/061 See redlines for additional comments. Created: 3/21/2006
Response — the
Number: 11
[3/21/06] What is the bounds of the PDP? Created: 3/21/2006
boundary Only a portion of parcel B is shown.
Page I
Per the 3/22/06 meeting, it is recommended that the boundary of the PDP be reduced to
include only the area needed to serve the temporary cages. Cage locations must be
coordinated with other departments (stormwater, natural resources .
Res onse- we have mnmfiari #h. o�� _. )
a reed to their reouirema """"""Q`C' sian on 41'0 5 walked the
►its for cage Inratinng
Number. 16
[3/21/06) Label and dimension any Right of Way and ea em ntsf21/2006
Response- agree
Department: Light & power Issue Contact: Doug Martine
Topic: Electric Utility
Number. 2
13/10/061 If any new or additional electric service is required, contact Light & Per
Engineering (221-6700) to coordinate el
Response -agree ectric facilities and charges.
Department: PFA Issue Contact: Carte Dann
Topic: Fire
Number 24
[3/27/06] ACCESS: A fire lane shall be required for this site. Contact the PFA Fire
Prevention Bureau for the construction details of the fire lane.
Resnnncc- - fi— i.---
the fire goes out www timbersil com
Number. 26 Created: 3/27/2006
[3/27/061 ADDRESS: The address numerals shall be visible from the street fronting the
property. They shall be posted on a contrasting background, and a minimum of 6 inches
high.
Property along Vine Drive and at the Main -Street entrance pumper that we can ost on tt
Department: Traffic Operations Issue Contact: Eric Bracke
Topic. Traffic
Number. 1
3/2o[3/9/06] The Transportation Impact Study for this project rhasebeen waived due to minimal
peak hour trips being generated.
The project also has a capacity reservation on file with the Department pertaining to the
intersection of Vine/Lemay
Response- Thank You very much!
Department: Stormwater-Water-Wastewater Issue Contact: Basil Harridan
Topic: Drainage
Number. 19 Created: 3/21/2006
[3/21/061 Please add a note to the plans that a drainage report will be submitted for any
future development plans for a more permanent facility.
Response- agreed►►
Page 2
Please address how off -site flows are being routed through the site if any and where the
Proposed outfall for this site will be.
--
feet.
Topic: Floodp/ain
Number. 20
[3/21/08j
F000dplain comments
Created: 3/21/2008
1. Please also show the City's 0.5 foot floodway on the site plan. It is slightly wider than the
FEMA 1 ft. floodway. Even with the Dry Creek Diversion project completed, the floodway
will still go through this area. It appears that the flight cage building and the fence may be in
the 0.5 ft. floodway. If so; the cage will need to be moved out of the floodway or shown to
not cause a rise in the 100-year flood elevation. The fence will either have to be moved or
be a break -away design.
2. Please provide a detailed grading plan. Depending on which berms are removed and
how the grading takes place, it may result in the fl
further across this property. This will need to be plaannedyfor if youand wanttoplainpm nidi�n� izeo�
changes to the floodway so that it will not impact your site as you plan future work.
Response No floodwav wiii he _ .-
2. A floodplain use permit will be required. The permit fee is $25.
Response- agree
3. Any remodel work done to the former Platte Valley Lumber building will be subject to the
substantial improvement policy. If improvements exceed 50% of the structures value
(excluding land) then the structure must be elevated or floodproofed 18" above the
floodplain. If the improvement value is below the 50% threshold, then there are no
requirements other than to submit to Utilities a floodplain use permit and a detailed cost
estimate of the proposed improvements. There is a $25 permit fee. Contact Marsha
Hilmes-Robinson at 224-6036 with questions.
been used previesly
------••• • ••�► �QY� a� � cnan a or use from how this buildin has
Please note that aerial maps showing the extent of the City's 0.5 feet floodway are being
included with these comments for the applicant's use.
Response Thank You
Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington
Topic; General
Number. 22 Created: 3/22/2006
[3/22/06] (No comments until new development is proposed on the site.)
Response -Thank You►►
Page 3
Department: Stormwater-Water.Wastewater Issue Contact: Basil Hamdan
TopiC: Utility plans
Number. 18
ty
13/21/061 Since no utility construction is being contemplated with th s/project, no utili
is required. If any grading is proposed then a grading plan would be required. plan
Response —aaree. RMRP has no plans for aradin this site
It seems that a ditch is being filled, please locate that ditch on the map. This ditch is called
Put to be filled, however, this needs to be evaluated depending on whether the ditch is
conveying any off -site flows from the west. A site visit should be set up to help us evaluate
the impact of the grading proposed on the site and to try to find an appropriate location for
the cages.
thi_
Show the location of the Josh Ames ditch on the plans.
ReSnnncrs — The 1--L. A :-_ _.. .
Call out the Dry Creek channel.
Response - aaree
Department: Zoning Issue Contact: Gary Lopez
ToP/c; Zoning
Number. 3
Created: 3
13/13/06] No Issues assuming that the cages will similar tothe ones at th0ee current location
shown in pictures.
Response —same design different material to eliminate fire nsk
Please return all of your redlined plans when you re -submit.
The project has been tentatively scheduled for the April 20"' Planning and Zoning Board
hearing. In order to be retained on the agenda, revised development plans and written
materials in response to the review comments must be received no later than March 31,4.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
Cameron Gloss
Current Planning Director