Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
OVERLAND TRAIL AT RAMPART ROAD - Filed DCP-DEV. CONSTRUCTION PERMIT - 2011-10-04
City of Fort Collins Transportation Services Engineering Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: O Issuance Date: 6� �� Project Name: Overland Trail at Rampart Road Project Location: North Overland Trail between W. Elizabeth Street And Mulbepy Street. Permittee: Brian Chase Colorado State University, 970 491-0006 City and developer contacts: See attached Exhibit `A' for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee ($400.00) $ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 1618.35 Street Cut Fee (to be paid by the contractor as needed) Total amount due $ 2018.35 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 0.0 See attached letter from CSU indicating that CSU stands behind the maintenance/ repair warrantee and will provide for the repair and maintenance of the improvements for 2 years from date of acceptance of the improvements and will repair or replace any damaged improvements prior to transfer of the maintenance responsibilities to the City (2 yrs after acceptance) — PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Z61 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378 www.fcgov.com .4 (f ) Vev-) CL.,t-"j —) ra,,f DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET Contact name Company Name Address Phone Number/email address ��,� - - mob Z.Z \ . L.Q"O rj 9;;'0- 3�✓-oc/c>p :S' ? K eQ �/coT � EvrtS1�C►� �� �4-�% a� 6/f �r?dt d 97e -� 7-zu 71 CJ�� t�((,fEe,M.w /Lt�1�,i5 �jCw,N S'T'F,�Ol7 GG2i5.f� ® �A1/NEGL-�St71.UZG�S', (.0/rl `r70-751 _si�Z7- � ,1j5 " o3.35G-1�7e�� re"VLae-�.�► TIC �4 &•o A7tkt' J 4DE M 1L(47ice ,7MW C141L CK6tN 3'Abb W 1(*"4 Sr 5' 1cC!l�Qcn�lt:v�`4+l�i;�tasPS toM M.dx,eS�NnE�lo�l his+ -term Yr u.,kr��„ � Go. grill t t SSE kiss Cczol�pa 5,a� gl. 571 1J UN1 vC-7zs,y-j 6 df Pr+oos S4"6- G2cewcov P1.�z.i� f lv© ati l lR e . ZASI N• GOGLEG� Accela Automation: ShowPayDetai140 - T8108-D Page 1 of 1 RECEIPT CITY OF FORT COLLINS NEIGHBORHOOD & BUILDING SERVICES 281 N. COLLEGE AVE. Phone:970-221-6760 P. O. BOX 580 Fax:970-224-6134 Application #: B0805811 Project Name (Subdivision): OVERLAND TRAIL AT RAMPART ROAD Application Type: Building / Misc / General / NA Receipt No.: 135796 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Check 716054 $2,018.35 09/24/2008 12:13:59 PM KTHARP DCP PERMIT 8-17 OVER Owner Info.: Work DCP PERMIT 8-17 OVERLAND TRAIL AT RAMPART ROAD $2018.35 CK Description: #716054 COLORADO STATE UNIVERSITY Ia1C)8-a Ver4ior h 0 https://dtsweb02. fcgov.conVoperations/permit/index.cfm?FUSEACTION=ShowPayDetail... 9/24/2008 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the `as -constructed' plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 2 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Sign re: Date:-,? - ZJ-Za,B Approval for issuance: �'� "°� s� Q Sc i City Engineer ApPr Date: � 7' (Permit Issuance Date) Exhibit `A' page 3 of 5 EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Overland Trail at Rampart Road Project A.K.A.: Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri L. Langenberger, P.E. 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 x7140 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6605 Cell (970) 218-2157 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970) 221-6681 Erosion Control Inspector: D. A. Black 700 Wood Street, Fort Collins, Co 80521 (970) 224-6700 Natural Resources: Dana Leavitt 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6143 Traffic Operations: Joe Olson 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6815 Forestry: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970) 221-6361 Light and Power: Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970) 221-6700 Exhibit `A' page 4 of 5 Developer's Contact Persons: Project Manager: Steve Keiss, Colorado State University 251 Edison, Fort Collins, Co 80523-6030 (970)491-0017 Cell (970)567-6540 Fax (970) 491-7572 stephen.keiss(a colostate.edu Developer/Owner: Thomas Gorell, Vice President for Administration Services Colorado State University 251 Edison, Fort Collins, Co 80523-6030 (970) 491-0006 Fax (970) 491-7572 Project Engineer: Jade Miller, DMW Civil Engineers 3400 W. 16" St., Bldg 5, Suite Z, Greeley, Co 80634 (970) 378-6935 Cell (970) 391-6563 Fax (970) 378-6997 iade2dmwcivilengineers.com Architect/Planner: Randy Larsen, FWA Group 155 E. Boardwalk Dr, Suite 300, Fort Collins, Co 80525 (970) 232-3125 Cell (970) 227-3549 r.larsen ,fwa rou .com General Contractor: Tom De Lyser, Gerald h. Phipps Construction Co. 5995 Greenwood Plaza Blvd, Suite 100 Greenwood Village, Co 80111 (303)571-5277 Cell (303) 961-0476 Fax (303) 629-7467 Tom.delyser@ghphipps.com ghphipps.com Grading/ Concrete/ Paving Contractor: Rolland Tremble, Connell Resources, Inc. 4305 East Harmony Rd, Fort Collins, Co 80528 (970) 223-3151 (970) 223-3191 rtrembleAconnellresources.com Exhibit `A' page 5 of 5 H W W w Q F- V) W N O U 0 Q W U) W H F- z a d F- Q W 0 oc OOooOOO 0000000 000000000 000000000 0000000 �6096464619�64 669��eO669�646S� Wnao00000 ui00v000O U') 00 69 69 69 69 1 6 6% Z 0 H U w aW rn W LL 0000000 M Ln 0 LO0 OOMMMMM OOOOOOOOO r�r�r�000000 LnLnoo0LnLO vva 00IT _ W 69 69 69 69 0 69 064 OOOOOMOU)t' 63 69 t` r- O r- M M 00 e-00 69 69 ffi � 69 69 69 U 69 69 ;; 613,69 69 W>`Z a0E- W M W n M LL O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O N O O O O OU') 00 O O O O O ui F O O O O O O O 69 69 69 69 69 69 EA 0 0 0 0 0 0 0 00 0 69 69 69,61Y 609,6S 69 69 69 69 O f- C V (. 0 0 0 0 69 M9 69 69 669 U � CO N �(00 '.w 6%6N969 W H O O O O O O O 0000000 0000000000 0000000000 O .- M N M 0 0 0 O (0 O N N F W a00000�0 61 9 0000I�O w N0O �61) Cl) co 0(M M to N 0) ��6969�609�6�9 Z W M Q m C14 000 `- 69 69 � eN- 00 O M 0 69 ' V9 D F- G 61) � 6N9 Efl E» wQ W> z V) 0 CL 30000< 0 0OOOOOOO N W W W 15 1-U z W CO n LU G (j W W U aPo3 ga0a m rn>> 0: u, ey P.- O O O O O O O O O O O M v V' 0 0 0 0 00 LO CO LO O --I W H W M O 0 W W z U ZW JJ(�(,)Q(�W ttJJJJ LLJ JJJ4 W W W W W W LJJ (/'i'}LLLLLL}} J (J) :n J J J (n (� � 0 V 0 ZLU N 2U m m a U Ci oc J aN �, w = U)L) U U Q Z L �, j- � zM t' ev cw zg a in a� y c c 3 ?� o W� �N W a) d C U '� y a) w a� 1C J fY ZOO Z U of � OV o m� N � N C MU) H o c U as p 0 o E p Z aJ .o Oaf F �_ d� �, = a� ;� =m 3 �,.. -vc� a�c� c cc m QU a,79 .� , � U �¢ H aJFw. �Q4 m m �H rn y �L c m �U)'Fu.= aa) m wm'M °ti Zg"(n� � a.�� > c N m� aa) � m wp 1- f" i C1 � U N y �0 U U N L c c c -- — c .� d .w N U 75 N== N- of N ..+ c .. c .. c> 2 rnaa) y •c E E 0 U w c uci y 'o a) a) M cu a) p w Q W H O _� W J G. w:i9 w o f0 — N U)WF-c5�¢�� .c �a as m m m 0= m 3(n3: 3: �>�i�� w� m m 3 d aa) a o d Z ff u�0a.aU0aQU " September 9, 2008 Engineering Department City of Fort Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 Colo 0 R E C N/f 'P-7 University SEP 1 2008 Knowledge to Go Places Facilities Management Fort Collins, Colorado 80523-6030 RE: Rampart Road and Overland Trail Intersection Improvements To Who It May Concern, The City of Fort Collins Engineering Department and Colorado State University have agreed that this letter establishes security for the Rampart Road and Overland Trail Intersection Improvement project. The City of Fort Collins Development Construction Permit (DCP) process requires this security. The improvements within the ROW will be designed and constructed per the drawing and specifications dated 8/19/2008 as approved by the City of Fort Collins Engineering Department. For this security Colorado State University will provide the following for two years from the "Notice of Acceptance" issued by the City of Fort Collins Engineering Department: Maintenance — Basic maintenance of the improvement (street sweeping, grade stabilization and plantings). Snow removal and striping will be done by the City of Fort Collins. Repair warranty - Includes repair or replacement of any damage to the improvements Individual maintenance and repair instances will be negotiated and agreed upon by the City of Fort Collins and Colorado State University prior to completion of the work. The total cost of all maintenance and repair during the 2-year period shall not exceed $100,000 except upon the prior, written agreement of CSU, in its discretion, considering the availability of funds, necessity of the work, and estimated cost. LiEPA Green Division of Administrative Services .:. Lights P A R T N E R Rampart Road and Overland Trail Intersection Improvements Page 2 At the end of the two-year warranty period, all maintenance and repair responsibilities will be transferred to and assumed by the City of Fort Collins. Construction of the improvements is anticipated to be complete by the end of October 2008. The end of the two-year warranty period is anticipated to occur in October 2010. Sincerelv, cc: Robert Schur, Associate Legal Counsel and Special Associate Attorney General Project File- Research Innovation Center ACCEPTED BY THE CITY OF FORT COLLINS: Name: h (2* t Ct t? 1- Title: _ N'ye/p,.���itf �,Pj �1�t¢1 I?%?�t ✓ Date:!