HomeMy WebLinkAboutCENTRE AVENUE RESIDENCES LOT 1 712 MIDPOINT DRIVE - Filed MA-MINOR AMENDMENT - 2011-06-23 (2)Li,ds�f_.cCity of
Comments Due By:
Minor A.—idment #
Planner_--1 ay-,-,
Effective bate
Minor Amendment Application Form - ZoninLy Department
Date Submitted: 6-10-11
Project Name: CENTRE AVENUE RESIDENCES (ARROWHEAD)
Project Location (Street Address): 712 CENTRE AVENUE
Legal Description: LOT 1, CENTRE AVENUE RESIDENCES
Minor Amendment Fee: $192
Transportation Development Review
Fee: $250 (when applicable)
General Information: List all property owners having a legal/equitable interest in the property (Attach separate sheets if necessary).
Owner's Names : CENTRE AVENUE RESIDENCES, LLC
Street Address: 3003 EAST HARMONY ROAD, #400 City/State/Zip: FORT COLLINS CO 80525-3409
Telephone: 970-226-1500 Fax
970-223-4156
pplicant's/Consultant's Nam : CATHY MATHIS
Street Address: 444 MOUNTAIN AVE.
Telephone: 970-532-5891
Name of firm: THE BIRDSALL GROUP
City/State/Zip: BERTHOUD CO 80513
Fax: 970-532-5759 Email: Cathy@tbgroup.us
SUBMITTAL REQUIREMENTS•
1) Seven (7) copies of RECORDED plan (i.e. site, landscape, elevation, etc. - whichever is being altered) on 24" x
36" size (usually available at the Technical Services Department at 281 N. College) — RED -LINE THE
CHANGES ON the seven plans or provide seven copies of revised drawings showing the changes in addition to
the seven originals. ALL PLANS MUST BE FOLDED TO 8 1/2" X 11";
2) Completed and signed application form(s); and
3) Application fee of $192.00 (or $442 if Transportation Development Review Fee required).
4) Poudre Fire Authority (PFA) requires a separate Development Plan Review application and fee for minor
amendments which must be submitted directly to PFA. Information for their process can be found at
littps://www.pfafireprevention.org/node/73
MINOR AMENDMENT
Detailed description of the change and reason(s) for the request: Request to amend phasing to include only Phase 1
improvements. Linework for Phases 2 and 3 has been removed. The landscape plan for Phase 1 has also been modified to reduce
plant quantities.
CERTIFICATION
I certify the information and exhibits submitted are true and correct to the best of my knowledge and that in filing this application, I am acting with
the knowledge, consent, and authority of the owners of the property (including all owners having a legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; which is the subject of this application) without whose consent and authority the requested action should not
lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for the purpose of inspection, and if
necessary, for posting a public notice on the property.
Name (please PRINT): CATHY MATHIS
Address: THE BIRDSALL GROUP, 444 MOUNTAIN AVE., BERTHOUD CO 80513
Telephone: 970-532-5891 Signature:
281 N. College Ave, PO Box 580, Fort Collins, CO 80522, (970) 416-2745 F: (970) 224-6134
NORTHERN
E N G I N E E R I N G
ADDRESS:
200 S. College Ave. Suite 100
Fort Collins. CO 80524
PHONE: 970.221.4158
wEBSITE:
wax northernengineering.com
FAX: 970,221,4159
Wes Lamarque
City of Fort Collins Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
June 9, 2011
Re: Final Drainage and Erosion Control Revision Letter
Centre Avenue Residences — Minor Amendment
Dear Wes,
This letter is to summarize the revisions made to Centre Avenue Residences with
the June 2011 Minor Amendment Application. This project is located at the north corner
of Worthington Circle and Centre Avenue in Fort Collins, Colorado and is currently
under construction on Phase 1. The majority of the revisions are influenced by the
modification of the phasing delineation.
The previous design routed stormwater through a network of swales and storm drains into
the detention pond located in the northern half of the site. The design accounted for three
buildings in three phases. Each building was designed to have vehicular access and
associated curb and gutter. The pond was sized for a percent impervious of 43.1 for the
entire site (Phases 1-3). This resulted in a design pond volume of 1.446 acre-feet
achieved at a proposed high water surface elevation of 5043.35.
The proposed revision only includes improvements for Phase 1. Modification to the
drive aisles and associated curb and gutter are proposed to achieve access to Building 1
only. The proposed modifications do not alter the drainage patterns of the overall site
(Phase 1-3). Phase 1 will include the construction of the detention pond and storm
drainage facilities, all underground utilities, Building 1 and associated drive aisles and
parking areas. The Minor Amendment is in compliance with the Final Drainage and
Erosion Control Report for Centre Avenue Residences dated October 13, 2009.
If you have any questions regarding drainage for this site, please do not hesitate to
contact me at 221-4158 ext. 5409.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Cody Snowdon Nicholas W. Haws, PE, LEED AP
Project Engineer Project Manager