Loading...
HomeMy WebLinkAboutFORT COLLINS DISCOVERY MUSEUM - Filed DCP-DEV. CONSTRUCTION PERMIT - 2011-05-27City of Planning, Development & Transportation Engineering Department 6rt Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378-fax DEVELOPMENT CONSTRUCTION PERMIT Permit Number: — Q g Issuance Date: 7 f 3'0 f,D Project Name: Mason Court Parking (related to Fort Collins Discovery Museum_ Project Location: east side of Mason Street north of Cherry Street Permittee: Ron Kechter. City of Fort Collins Facilities Proiect Manager City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 200.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 324.00 Total $ 524.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ N/A Form of security deposited with the City: N/A PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (1/16/06) For City use only: Application Number: Application Date: Permit application fee: $ 400.00 Charge # 400501000.539999.1 PROJECT INFORMATION: Project Name (as approved by the City): Mason Court Parking Project Location: 408 Mason Court Property Owner(At the time of this permit issuance): Individual Name: Ron Kechter Company Name: City. of Fort C'niline Address: 300 LaPorte Avenue Fort Collins. CO80524 Phone number(s): Office: 970-221-6805 Cellphone: 970-221-6805 Fax number: 970-221-6534 Email: rkechterAfcgov.com Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" for this project): Individual Name: ,SAP -as Above Permittee (Person who is to sign the Development Construction Permit): Individual Name: Same as Above Developer (No Development Agreement, but responsible for the Developer's obligations): Individual Name: Same as Above Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Randall Provencio & Kevin Brazelton Company Name: Nlarth� em Enineeling Address: 200 South College Avenue Suite 100 Fort Collins CO 80524 Phone number(s): Office: 970-221-4158 Cellphone: 970-631-3312 Fax number: 970-221-4159 Email: randall(ivnorthemen ineering com Professional License Number: CO PE #38837 (Kevin R. Brazelton) General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: Dave Rosser Company Name: Hensel Phelnc cnngn,ct,nn C`n Address: 420 _Sixth Avenue P O Box O Greeley, CO 80632 0710 Phone number(s): Office: 970-484-1254 Cellphone: 720-891-9339 Fax number: 970-224-2206 Email: DRosserAhenselphelns com SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"xl1" copy of the Site Plan Proposed Project Schedule Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): X Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings ❑ Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the people's names and titles for those who will attend the pre - construction meeting: Name Ron Kechter Dave Rosser Kevin Hatcher Larry Duran Randall Provencio Title Facilities Project Manager, City of Fort Collins Superintendent, Hensel Phelps Construction Project Engineer, Hensel Phelps Construction Superintendent, Duran Excavating Civil Engineer/PM, Northern Engineering ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $ 10,423.00 Private infrastructure, estimated cost: $ I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. Applicant Signature:Date:> �c�%1C �` o . i• f 11 fi.. ° ,To I 3 e � d v v ' \ LOT 1 � \\ N o MASON STREET NORTH \ \ \ W N \ \ N r NOT JAX ASPHALT S' AOCREGArE BASE OOvftil (S ON 4) ITA91uzm sula"K (SEE GEOTICHSOCk REPORT) (ryo..l I.- W Db t. CONSTRUCTION SITE VERTICAL ?Ft. OUT FALL CURB & GUTTER ._!URCURB AND GUTMnR �-MO�DIFIED ]3 A� ER COUNTY URBAN AREADRAWING STREET STANDARDS DRAWINGS DATE: ) 70, FU-014—TO—UTY1 3" NOT WK ASPHALT 6" PORfLAMD MMENT CONCRETE C ClOWn commig IAIl IACd&$ A Ir ACMQATE UK CO;msE (5 an 8) A"O"D APRO r cuss I AOGREQATE cwm (GEOM FIACCO OEM" STADUEM W504ADe (SVE vollow"'t Remy) 4' NOT MIX ASPHALT r NOT MIX A__ V PORILAM CEMENT CONCRETE r ACCRECAlt BASE aragE (5 an 1) V ACOMAIE 4' AGGIECATE BASE OWN SE (3 OR 6) VASE COMM (A ON 6) CEO = PLUS summum "I a nSTANUZ10 arsumK MAID ftul(St pwulowl R"r) (Sit CIOTEC-ICAL NEPORT) Im 1. K A3N PAY" szC4- wm TAm F40v _w cl TAOvPm K=APmED ffmr -ctoyicw,_,j -wra "M?Kmm ;WNW sm JrjmM,,e "W'.4M FC05115-125. RE -El -0 I�s K.Dr _-CR P-rffOflWMrE 3PrClflCATENSqmCE) OfHp ig=w S' PORTLAND elbuy CONCKK 4' AWREGAIT SAID CMWK (A 0 S) OEOCAKI P" UWMVEO SUD-ORAN 1 / 1 Ao w 3 w 1 it •: -- •/ yr��d '� jr ao6 I " ` all t4 JAJ Avg rr. , LOT 1 It N MASON STREET NORTH _a �����Uupiii�i�ii NNINIIIIIIIIII Development Construction Permit, Page 2/5 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: N/A Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature: Date: c� Approval for issuance: 44 City Engineer Approv Date: �' ( (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Fort Collins Discovery Museum Project A.K.A.: NA City Staff Contact Persons: Development Engineer: Marc Virata 281 North College Avenue, Fort Collins, CO 80524 970 221-6605 Construction Inspector: Tracy Dyer 281 North College Avenue, Fort Collins, CO 80524 970 222-0855 Current Planner: Steve Olt 281 North College Avenue, Fort Collins, CO 80524 970 221-6341 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, CO 80521 970 221-6854 Erosion Control Inspector: D.A. Black 700 Wood Street, Fort Collins, CO 80521 970 221-6700 Natural Resources: Dana Leavitt 281 North College Avenue, Fort Collins, CO 80524 970 221-6143 Traffic Operations: Joe Olson 626 Linden Street, Fort Collins, CO 80524 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, CO 80524 970 221-6815 Development Construction Permit, Page 515 Forestry: Tim Buchanan 215 N Mason Street, Fort Collins, CO 80524 970 221-6641 Light and Power: Doug Martine 700 Wood Street, Fort Collins, CO 80521 970 224-6154 Developer' Contact Persons: Project Manager/Owner/ Ron Kechter Developer: City of Fort Collins 300 Laporte Ave., Fort Collins, CO 80524 970 221-6805 970 221-6534 (fax) Planner: Mark Kosmos AECOM 240 East Mountain Ave., Fort Collins, CO 80524 970 484-6073 970 556-8342 (cell) 970 484-8518 (fax) Project Engineer: Randall Provencio & Kevin Brazelton Northern Engineering 200 S. College Ave., Ste 100, Fort Collins, 80524 970 221-4158 970 631-3312 (cell) 970 221-4159 (fax) General Contractor: Dave Rosser Hensel Phelps Construction, CO. 420 6th Ave., PO Box O, Greeley, CO 80632-0710 970 484-1254 720 891-9339 (cell) 970 224-2206 (fax) N+ O tW0 WN V OWi N P fWit N + O � CNo V OI N A W N � N •� O fp V Ol f!1 � A N O O m O� UI A N O tG W V OI 1l1 A IJ N + ♦ /V�/IS2 O �O Oo S 5 V OI A W N —� mD a s3� .. �o vN o < =� d CD 0 o CD o <yyc O m CD ' CL N moo -' CD m K Q go CD -1 c� m N -Dj F -� 3 N N IyMD >> N 7 N N y nay 2 CD cD = C L N�20)i n' m r Z T CD3 i d 3TC WW2 T O y °,r' Z CD CD SD 2 pa G' f- m 93 �»• n m 5' � : (D N Xz y r �f y m � 3Z fnv v (Da Cl)c CD Z 00) ctr N c m r _- Mr Mr W FLt� b 0 Oz o v 9 m -�I 0 0 - V Z-0 0o z c v fWcnrrrcAr ��rrII ��inI �mrI �mrI ��TT11�n DDDDDDDrrr TToorr mz _ m . . . . . . nnnC)nC)(7.TT 0 0 k <n :-n 0-1 __, y w m z' G) _ Em m co co M O O O W W -+ m M../� oa Onii• oNacoz me o'�� cnc w mz- a 9 4A C' Z 69 fD CA) CD Sm 69 69 (A o O Cn :i M a to 69 00069U069y WN Ln -0 _0 a 69469 00 069 D) W -ff 0C:, OOOOQOo 000 0000000 0000000 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0< 00 0 o 0 0 0 IV 0000 OD CD 3 Z - ,� y„- i � � 69 <,, V W A U1 N 69 69 69 -1 8 O O O O O N O 0000000 0000000 c CD a EA fA 69 69 fA 69 69 m fA 69 O O O O O O O Q O o 0o00000o 00 0000000� oo c CD CL EA 69 69 69 p) to O O O O Q O 0000� O 0000� O r m �v rn m O m5m �69<A r'� nCZ m •.; to EA to 69 69 69 00 —O W W V V W O -1 69 to 69 n Mo 0W00000 O 0 69 69 Im 69 W W W W 00A p .� �000 a Cn 00o Cn 0000000 I 0CD nCn V Vn 000000 m 0 m� Z Id 0 0 0 69 69 69 O 69 69 fA 8 0 W O oOOD W EA 69 6o to 69 69 69 69 69 69 0000000000 69 EA 69 fA 69 69 OOOOo 0 3 000000 0 0 0 0 0 0 0000000000 0 0 0 0 0 0 0 Cl 0 0 O O O O O O 0 0 0 0 0 0 R C •rrI i:i O O c V LL``° u U � U Q Q )(Juo asn $uquno:)v ro3 v� a S w A 0 w w O CIO v � � � O .0 a o a A tu o L. O Rig o O a o a� U A U b0 y a� � w � a� � o y U y .� O a a o io +r ti o, U y cs 0 0 0 E�Aw° 0� en C14 a boo c w as g00 M 0 N E m a a� d cr a E 9 0 -Accela Automation: ShowPayDetailQ - T8108-D Page 1 of 1 RECEIPT CITY OF FORT COLLINS COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES 281 N. COLLEGE AVE 970.221.6760 PO BOX 580 970.224.6134 - fax Application # : B1006267 Project Name (Subdivision) : MASON COURT PARKING (related to Fort Collins Discovery Museumo Application Type : Building / Misc / General / NA Receipt No.: 156197 Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments Internal Transfer 400501000.539999.1 $524.00 09/30/2010 02:22:08 PM SLINDELL DCP FEES FOR Mi Owner Info.: Work DEVELOPMENT CONSTRUCTION PERMIT APPLICATION ($200) AND Description: DEVELOPMENT CONSTRUCTION PERMIT INSPECTION FEES ($324) FOR MASON COURT PARKING (related to Fort Collins Discovery Museum) PAID BY CHARGE #400501000.539999.1 'T8108-D verslorl 4 D https://dtsweb02.fcgov.connVoperations/permit/index.cfm?FUSEACTION=ShowPayDetail... 9/30/2010 City of F6rt Collins Site Address: Job Valuation: $0.00 Category: Transactions Internal Transfer CK# 09/30/2010 $524.00 400501000.539999.1 Receipt issued: 09/30/2010 Total Paid to Date: $524.00 Fee Description Account Code Fee Amount DCP Application 902010.422020 $200.00 Development Inspection Fee 902010.444020 $324.00 Community Development & Neighborhood Services 281 N. College Ave Fort Collins, CO 80522 97o.221.676o 970.224.6134 -fax BUILDING PERMIT #: B1006267 Permit Type: General Comments DCP FEES FOR MASON CT PARKING PD BY CHARGE 400501000.539999.1 Amount Paid Date Paid Amount Due $200.00 09/30/2010 $0.00 $324.00 09/30/2010 $0.00 TOTAL FEES: $524.00 $524.00 TOTAL BALANCE DUE AS OF 09/30/2010: $0.00 1-00 Fee Amounts are valid for date of this document only. Fees subject to change without notice. Form Revised October 2008