DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: — Q g Issuance Date: 7 f 3'0 f,D
Project Name: Mason Court Parking (related to Fort Collins Discovery Museum_
Project Location: east side of Mason Street north of Cherry Street
Permittee: Ron Kechter. City of Fort Collins Facilities Proiect Manager
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 200.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 324.00
Total $ 524.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ N/A
Form of security deposited with the City: N/A
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(1/16/06)
For City use only: Application Number: Application Date:
Permit application fee: $ 400.00 Charge # 400501000.539999.1
PROJECT INFORMATION:
Project Name (as approved by the City): Mason Court Parking
Project Location: 408 Mason Court
Property Owner(At the time of this permit issuance):
Individual Name: Ron Kechter
Company Name: City. of Fort C'niline
Address: 300 LaPorte Avenue Fort Collins. CO80524
Phone number(s):
Office: 970-221-6805
Cellphone: 970-221-6805
Fax number: 970-221-6534
Email: rkechterAfcgov.com
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" for this project):
Individual Name: ,SAP -as Above
Permittee (Person who is to sign the Development Construction Permit):
Individual Name: Same as Above
Developer (No Development Agreement, but responsible for the Developer's obligations):
Individual Name: Same as Above
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person,
responsible for the design of this project, responsible for certification that improvements are constructed
in accordance with approved plans, responsible for making revisions to plans with City approval and for
providing as -constructed plans):
Individual Name: Randall Provencio & Kevin Brazelton
Company Name: Nlarth� em Enineeling
Address: 200 South College Avenue Suite 100 Fort Collins CO 80524
Phone number(s):
Office: 970-221-4158
Cellphone: 970-631-3312
Fax number: 970-221-4159
Email: randall(ivnorthemen ineering com
Professional License Number: CO PE #38837 (Kevin R. Brazelton)
General Contractor (The contractor in overall charge of the public infrastructure construction):
Individual Name: Dave Rosser
Company Name: Hensel Phelnc cnngn,ct,nn C`n
Address: 420 _Sixth Avenue P O Box O Greeley, CO 80632 0710
Phone number(s):
Office: 970-484-1254
Cellphone: 720-891-9339
Fax number: 970-224-2206
Email: DRosserAhenselphelns com
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81/2"xl1" copy of the Site Plan
Proposed Project Schedule
Project quantities and cost estimate for all of the public improvements to be constructed. In
addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
X Traffic control plan(s) for the project
❑ Proposed haul routes shown on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss
plans and special requirements for your project, is required for all development projects. The people
required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land
Planner and General Contractor (if no General Contractor, representatives for each of the contractors
expected to work on this project)
People to Attend: List the people's names and titles for those who will attend the pre -
construction meeting:
Name
Ron Kechter
Dave Rosser
Kevin Hatcher
Larry Duran
Randall Provencio
Title
Facilities Project Manager, City of Fort Collins
Superintendent, Hensel Phelps Construction
Project Engineer, Hensel Phelps Construction
Superintendent, Duran Excavating
Civil Engineer/PM, Northern Engineering
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted by the City to own and
maintain. In addition provide the value of all private infrastructure improvements that the City will
inspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: $ 10,423.00
Private infrastructure, estimated cost: $
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required work.
Applicant Signature:Date:>
�c�%1C
�` o . i• f 11
fi.. ° ,To I
3
e �
d v
v '
\
LOT 1 �
\\ N o
MASON STREET NORTH
\ \ \ W N
\ \ N
r NOT JAX ASPHALT
S' AOCREGArE
BASE OOvftil (S ON 4)
ITA91uzm sula"K
(SEE GEOTICHSOCk
REPORT)
(ryo..l I.- W Db t.
CONSTRUCTION SITE VERTICAL
?Ft.
OUT FALL CURB & GUTTER
._!URCURB AND GUTMnR �-MO�DIFIED
]3 A�
ER COUNTY URBAN AREADRAWING
STREET STANDARDS DRAWINGS DATE: ) 70,
FU-014—TO—UTY1
3" NOT WK ASPHALT
6" PORfLAMD MMENT CONCRETE C
ClOWn commig IAIl IACd&$ A
Ir ACMQATE
UK CO;msE (5 an 8) A"O"D APRO
r cuss I AOGREQATE
cwm (GEOM
FIACCO OEM"
STADUEM W504ADe
(SVE vollow"'t
Remy)
4' NOT MIX ASPHALT
r NOT MIX A__
V PORILAM
CEMENT CONCRETE
r ACCRECAlt
BASE aragE (5 an 1)
V ACOMAIE
4' AGGIECATE
BASE OWN SE (3 OR 6)
VASE COMM (A ON 6)
CEO = PLUS
summum
"I
a
nSTANUZ10
arsumK
MAID ftul(St
pwulowl
R"r)
(Sit CIOTEC-ICAL
NEPORT)
Im
1. K A3N PAY" szC4- wm TAm F40v _w cl TAOvPm K=APmED ffmr -ctoyicw,_,j
-wra
"M?Kmm ;WNW sm JrjmM,,e "W'.4M FC05115-125. RE -El -0 I�s K.Dr _-CR
P-rffOflWMrE 3PrClflCATENSqmCE) OfHp ig=w
S' PORTLAND
elbuy CONCKK
4' AWREGAIT
SAID CMWK (A 0 S)
OEOCAKI P"
UWMVEO SUD-ORAN
1
/ 1
Ao
w 3 w 1 it •: --
•/ yr��d '� jr ao6 I " `
all t4
JAJ
Avg
rr. ,
LOT 1 It
N
MASON STREET NORTH
_a
�����Uupiii�i�ii
NNINIIIIIIIIII
Development Construction Permit, Page 2/5
3. Construction time restrictions: N/A
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the Permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/5
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: N/A
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature: Date: c�
Approval for issuance:
44 City Engineer Approv Date:
�' ( (Permit Issuance Date)
Development Construction Permit, Page 4/5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Fort Collins Discovery Museum
Project A.K.A.: NA
City Staff Contact Persons:
Development Engineer: Marc Virata
281 North College Avenue, Fort Collins, CO 80524
970 221-6605
Construction Inspector: Tracy Dyer
281 North College Avenue, Fort Collins, CO 80524
970 222-0855
Current Planner: Steve Olt
281 North College Avenue, Fort Collins, CO 80524
970 221-6341
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, CO 80521
970 221-6854
Erosion Control Inspector: D.A. Black
700 Wood Street, Fort Collins, CO 80521
970 221-6700
Natural Resources: Dana Leavitt
281 North College Avenue, Fort Collins, CO 80524
970 221-6143
Traffic Operations: Joe Olson
626 Linden Street, Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, CO 80524
970 221-6815
Development Construction Permit, Page 515
Forestry: Tim Buchanan
215 N Mason Street, Fort Collins, CO 80524
970 221-6641
Light and Power: Doug Martine
700 Wood Street, Fort Collins, CO 80521
970 224-6154
Developer' Contact Persons:
Project Manager/Owner/ Ron Kechter
Developer: City of Fort Collins
300 Laporte Ave., Fort Collins, CO 80524
970 221-6805
970 221-6534 (fax)
Planner: Mark Kosmos
AECOM
240 East Mountain Ave., Fort Collins, CO 80524
970 484-6073
970 556-8342 (cell)
970 484-8518 (fax)
Project Engineer: Randall Provencio & Kevin Brazelton
Northern Engineering
200 S. College Ave., Ste 100, Fort Collins, 80524
970 221-4158
970 631-3312 (cell)
970 221-4159 (fax)
General Contractor: Dave Rosser
Hensel Phelps Construction, CO.
420 6th Ave., PO Box O, Greeley, CO 80632-0710
970 484-1254
720 891-9339 (cell)
970 224-2206 (fax)
N+ O tW0 WN
V OWi N P fWit N + O � CNo V OI N A W N � N •�
O fp V Ol f!1
�
A N O O m
O� UI A
N O
tG W V OI 1l1 A IJ N +
♦
/V�/IS2
O �O Oo
S 5
V OI A W N —�
mD
a s3� ..
�o vN o < =� d
CD 0
o CD o
<yyc
O m
CD
' CL N
moo -' CD m K Q go
CD -1 c� m N
-Dj F
-� 3
N N IyMD
>> N 7 N N y
nay 2
CD cD
= C L
N�20)i n'
m r Z
T
CD3
i
d
3TC
WW2
T O
y °,r'
Z CD CD SD 2
pa
G' f-
m
93
�»• n m 5' �
:
(D
N
Xz
y r �f
y m
�
3Z
fnv
v (Da
Cl)c
CD
Z
00)
ctr
N
c m
r _-
Mr
Mr
W
FLt�
b
0
Oz
o
v
9
m
-�I 0
0 -
V
Z-0 0o z
c
v
fWcnrrrcAr
��rrII ��inI �mrI �mrI ��TT11�n
DDDDDDDrrr
TToorr
mz
_ m
. . . . . .
nnnC)nC)(7.TT
0 0 k <n :-n
0-1
__,
y w
m
z'
G) _
Em
m
co co
M O O O W W -+
m
M../�
oa
Onii•
oNacoz
me
o'��
cnc
w
mz-
a
9 4A C'
Z
69 fD
CA) CD
Sm
69 69 (A
o O Cn :i M a to 69
00069U069y WN
Ln -0 _0 a 69469
00 069 D) W
-ff
0C:,
OOOOQOo
000
0000000
0000000
0 0 0 0 0 0 0 0 0 0
o 0 0 0 0 0 0< 00
0 o 0 0 0 IV
0000 OD
CD
3
Z -
,�
y„-
i
� �
69 <,,
V W A U1
N 69 69 69 -1 8 O
O O O O N O
0000000
0000000
c
CD
a
EA fA 69 69 fA 69 69 m fA 69
O O O O O O O Q O o
0o00000o 00
0000000� oo
c
CD
CL
EA 69 69 69 p) to
O O O O Q O
0000� O
0000� O
r
m
�v
rn
m
O
m5m
�69<A
r'�
nCZ
m
•.;
to EA to 69 69 69
00 —O
W W V V
W O -1 69 to 69
n
Mo 0W00000
O 0 69 69 Im
69
W W W W 00A
p
.�
�000 a
Cn 00o Cn
0000000 I
0CD nCn V Vn
000000
m 0
m�
Z
Id
0
0
0
69 69 69
O 69 69 fA 8 0
W O oOOD W
EA 69 6o to 69 69 69 69 69 69
0000000000
69 EA 69 fA 69 69
OOOOo 0
3
000000
0 0 0 0 0 0
0000000000
0 0 0 0 0 0 0 Cl 0 0
O O O O O O
0 0 0 0 0 0
R
C
•rrI i:i
O
O c
V
LL``°
u
U
�
U
Q
Q
)(Juo asn $uquno:)v ro3
v�
a
S
w
A
0
w
w O
CIO
v �
� �
O
.0
a
o a
A
tu
o
L. O
Rig
o
O
a
o
a�
U
A
U
b0 y
a�
� w
�
a�
�
o
y U
y
.�
O
a
a
o
io
+r
ti
o,
U
y
cs
0
0
0
E�Aw°
0� en
C14
a
boo
c
w
as
g00
M
0
N
E
m
a
a�
d
cr
a
E
9
0
-Accela Automation: ShowPayDetailQ - T8108-D
Page 1 of 1
RECEIPT
CITY OF FORT COLLINS
COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES
281 N. COLLEGE AVE
970.221.6760
PO BOX 580
970.224.6134 - fax
Application # : B1006267
Project Name (Subdivision) : MASON COURT PARKING (related to Fort Collins Discovery Museumo
Application Type : Building / Misc / General / NA
Receipt No.: 156197
Payment Method Ref Number Amount Paid Payment Date Cashier ID Comments
Internal Transfer 400501000.539999.1 $524.00 09/30/2010 02:22:08 PM SLINDELL DCP FEES FOR Mi
Owner Info.:
Work DEVELOPMENT CONSTRUCTION PERMIT APPLICATION ($200) AND
Description: DEVELOPMENT CONSTRUCTION PERMIT INSPECTION FEES ($324) FOR MASON
COURT PARKING (related to Fort Collins Discovery Museum) PAID BY CHARGE
#400501000.539999.1
'T8108-D
verslorl 4 D
https://dtsweb02.fcgov.connVoperations/permit/index.cfm?FUSEACTION=ShowPayDetail... 9/30/2010
City of
F6rt Collins
Site Address:
Job Valuation: $0.00 Category:
Transactions
Internal Transfer CK# 09/30/2010 $524.00
400501000.539999.1
Receipt issued: 09/30/2010 Total Paid to Date: $524.00
Fee Description Account Code Fee Amount
DCP Application 902010.422020 $200.00
Development Inspection Fee 902010.444020 $324.00
Community Development & Neighborhood Services
281 N. College Ave Fort Collins, CO 80522
97o.221.676o 970.224.6134 -fax
BUILDING PERMIT #: B1006267
Permit Type: General
Comments
DCP FEES FOR MASON CT PARKING PD BY CHARGE
400501000.539999.1
Amount Paid Date Paid Amount Due
$200.00 09/30/2010 $0.00
$324.00 09/30/2010 $0.00
TOTAL FEES: $524.00 $524.00
TOTAL BALANCE DUE AS OF 09/30/2010:
$0.00
1-00
Fee Amounts are valid for date of this document only. Fees subject to change without notice.