HomeMy WebLinkAboutGATEWAY AT HARMONY ROAD PUD THIRD - Filed EV-EASEMENT VACATION - 2003-02-07Page is too large to OCR.
MEMORANDUM
TO: bennis Gwnwdl , TCT
FROM: Sheri Wamhoff, Development Review Engineer
DATE: June 8, 1998
RE: REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of the Gateway at Harmony
Road PUD, Third Filing, located on the west side of College Avenue just north of the
McDonalds at the northwest corner of Harmony Road and College Avenue. A portion of a
drainage easement:, a portion of a drainage and utility easement and a portion of an access,
drainage and utility easement, as shown on the attached drawing, is being proposed for vacation.
The owner of the property is requesting the easement vacation due to a change to the building
layout. A minor amendment is being reviewed in which the building is being proposed to be
modified by the addition of an enclosed parking stall(s) along the western face of the building
(see attached revised building footprint). These space(s) would be used by an insurance company
for damage estimation and extend over existing easement.
Please sign and return any comments to Sheri Wamhoff in the Development Review Center by
June 26, 1998. If we do not hear from you by this date, we will assume you have no objections
to the proposed vacation. Please call Sheri at 221-6750 if you have any questions. Thank you.
-.et:-�No Problems
_ Problems/Concerns as follows:
MEMORANDUM
TO: R63er , U)cJer/UJastewal-e✓-
FROM: Sheri Wamhoff, Development Review Engineer
DATE: June 8, 1998
RE: REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of the Gateway at Harmony
Road PUD, Third Filing, located on the west side of College Avenue just north of the
McDonalds at the northwest corner of Harmony Road and College Avenue. A portion of a
drainage easement, aL portion of a drainage and utility easement and a portion of an access,
drainage and utility Easement, as shown on the attached drawing, is being proposed for vacation.
The owner of the property is requesting the easement vacation due to a change to the building
layout. A minor amendment is being reviewed in which the building is being proposed to be
modified by the addition of an enclosed parking stall(s) along the western face of the building
(see attached revised. building footprint). These space(s) would be used by an insurance company
for damage estimation and extend over existing easement.
Please sign and return any comments to Sheri Wamhoff in the Development Review Center by
June 26, 1998. If we do not hear from you by this date, we will assume you have no objections
to the proposed vacation. Please call Sheri at 221-6750 if you have any questions. Thank you.
No Problems
—k Problems/Concerns as follows:
g ,Vp `T'r+G�zs is =Ir A N r`rt,RY Se:eJie�R A PPRoX .
7E—: G44 SIB. �'_
MEMORANDUM
TO: SToV-mwAlsp,
FROM: Sheri Wamhoff, Development Review Engineer
DATE: June 'B, 1998
RE: REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of the Gateway at Harmony
Road PUD, Third Filing, located on the west side of College Avenue just north of the
McDonalds at the northwest corner of Harmony Road and College Avenue. A portion of a
drainage easement, a portion of a drainage and utility easement and a portion of an access,
drainage and utility easement, as shown on the attached drawing, is being proposed for vacation.
The owner of the property is requesting the easement vacation due to a change to the building
layout. A minor amendment is being reviewed in which the building is being proposed to be
modified by the addition of an enclosed parking stall(s) along the western face of the building
(see attached revised building footprint). These space(s) would be used by an insurance company
for damage estimation and extend over existing easement.
Please sign and return any comments to Sheri Wamhoff in the Development Review Center by
June 26, 1998. If we do not hear from you by this date, we will assume you have no objections
to the proposed vacation. Please call Sheri at 221-6750 if you have any questions. Thank you.
No Problems
✓Problems/Concerns as follows:
Sheri Wamhoff - Re: Maken II Page 1
From:
Glen Schlueter
To:
Sheri Wamhoff
Date:
7/30198 12:18PM
Subject:
Re: IMaken II
Dennis came in today and he will be making the easement the 20 ft. that Basil asked for and he will
regrade the site to get the volume needed. He wanted a variance on the volume and 1 told him since he
used the Rational Method it was already undersized so he needs to come up with the volume or analyze
the downstream affects. Same with a higher release rate as an option. He will need to analyze the storm
sewer.
>>> Sheri Wamhoff 07/29 4:49 PM >>>
Where to start?
As you may know there is an easement vacation in the process for this project.
Roger you had issues with this vacation, but that has been worked out.
Basil I talked to you about this and you said that there needed to be 10 foot of easement from the storm
drain line around where the storm drain manhole sits.
When I told Messner this - he said that Glen you had reviewed this project and everything was okay and
worked out. He is going to be in contact with Basil to work this out. Please let me know what is worked
out. I need to have things together by next Wednesday.
Per my records the last time we reviewed utility plans for this project was Feb 1997. When I told Messner
we still needed to have the plans finalized he said that he had had everything worked out with you and had
submitted the mylars to me last week.
Well I never received the mylars and my assumption would be that we would want to review the bluelines
first as it has been more than a year since the plans were in.
Have you been reviewing these plans? Are you then ready for mylars to be submitted?
Since the easement vacation will not be official until 15 days after the hearing, we should not have
approved plan until then.
If we are at that point then I need development language for this project.
Let me know what is/ has been going on. thanks
Sheri
CC: Basil Hamdan
ngineering Associates
Sheri Wamhoff
Engineering Department
Community Planning and Environmental Services
281 North College Avenue
P.O. Box 580
Fort Collins, Colorado 80522 - 0580
Re: Vacation of portions of a Drainage and Utility
Drainage and Utility Easement on Lot 3 of The
R U. D. - Third Filing, Fort Collins, Colorado
Dear Ms. Wamhoff;
December 26, 1996
Project No. GRD - 228 - 96
Easement and an Access,
Gateway at Harmony Road
On behalf of our client, this letter is being forwarded to initiate the process to vacate
portions of the "Drainage and Utility Easement" and the "Access Drainage and Utility
Easement" located within Lot 3, of The Gateway at Harmony Road P.U.D. - Third
Filing, City of Loveland, Larimer County, Colorado.
The vacation of the subject easement is being requested for the following reasons:
1.) A portion of the proposed structure associated with the development proposal
for the "Maken II PU.D." is to be located within the limits of the present
easements.
2.) Any existing utilities, public or private, that are located within the portion of
the easements being requested to be vacated will be relocated and constructed
within the easements to be retained.
3.) Provisions for access drives and parking; utility services; and storm water
drainage facilities are to be incorporated with the construction of the proposed
parking lot and access driveways.
I would sincerely appreciate your earliest possible response to this request and thank
you for your assistance and consideration. If you should have any questions, please
advise.
Respectfully submitted,
MESSNER Engineering Associates
Dennis R. Messner, P.E.
Civil and Environmental Engineering Consultants
150 E 29th Street, Suite 238 1_oveland, Colorado 80538 Telephone (970) 663-2221
City of Fort Collins
Transpo. motion Services
Engineering Department
MEMORANDUM
TO: _Z)0a6 MPOI JE, L i&NT PAJo Poc oEe
FROM: Sheri Wamhoff, Development Review Engineer
DATE: December 31, 1996
RE: REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of The Gateway at Harmony
Road PUD - Third Filing, located at the Northwest corner of Harmony Road and College Avenue
(SH287) just North of the McDonald's site. A portion of the existing 70 foot (from the south
property line) access, drainage and utility easement, and a portion of the drainage and utility
easement in the northeast corner of the property, as shown on the attached drawing, is being
proposed for vacation. The owner is requesting this vacation since a portion of the proposed
structure, as shown in the submittal for Maken II PUD encroaches into the existing easements.
Please sign and return any comments heri Wamhol the Development Review Center by
January 17, 1997. If we do not hear from you s ate, we will assume you have no
objections to the proposed vacation. Please call Sheri at 221-6750 if you have any questions.
Thank you.
XNo Problems
Problems/Concems as follows:
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
Transportation Services
Engineering Department
MEMORANDUM
TO: 5u�ia1J P>✓r �t� t,15 WR'BT
FRAM: Sheri Warahoff, Development Review Engineer
1�lL•A. i.e., ��.. ,.�. ., � ....
RL: REQUEST TO VACATE A1109:VION OF AN FASF.MRh17'
n r....L...I n.. 3..... .nA rnmmrn4 i.. vtrrtrh ihnwinr 1.nt i of The C'Iatewav at Hium -tv
14LUAU 1 U" • I IUIU Y111116, IUUULW UL W.0 Ir.1lllt I1u6 ■0..... .I'Un-----7-^--' _-.A n_It-n_ w_.—.-
(SH237) just North of the McDonald's site. A portion of the e+dsting 70 foot (from the south
Pt UNUL L) ULAU) p -.... I —i uLailj -_______., __a _ r-. ;-- ..C.L.. A...; —a... A ,t;Hi
u136moffi in tho ncrthveul vurustr vfthv prpi?",, .. =h^•v^ nn thr nttarhPA drswing is hein¢
proposed for vacation. The owner is requesting this vacation since a portion of the proposed
Smucture, as shown in Ute subulittal for Maken 11 PUD encronohm into the existing easements,
Please sign and return any comments to Sheri Wamhoff in the Development Review Center by
January 17, 1997. if we do not hear from you by this date, we will assume you have no
objections to the proposed vacation. Please call Sheri at 221-6750 if you have any questions.
Thank you.
No Problems
ProblcmaJConoernf; as follows:
281 North College Avenue t CC). Evx 560 • FQrt (nitinn, CO 80522-0580 • (970) 221-6605
100 'd
116LbHZOL6161HI
Wld dIIHM A bZl 20:Li U1WDI ,ZO-'NU
City of Fort Collins
Transpo-ttion Services
Engineering Department
ul u 1 t , -ZIP111UV1
TO:
(,U ATE '� / lit.) �"rE Wr9TEC
FROM: Sheri Wamhoff, Development Review Engineer
DATE: December 31, 1996
RE: REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of The Gateway at Harmony
Road PUD - Third Filing, located at the Northwest comer of Harmony Road and College Avenue
(SH287) just North of the McDonald's site. A portion of the existing 70 foot (from the south
property line) access, drainage and utility easement, and a portion of the drainage and utility
easement in the northeast comer of the property, as shown on the attached drawing, is being
proposed for vacation. The owner is requesting this vacation since a portion of the proposed
structure, as shown in the submittal for Maken II PUD encroaches into the existing easements.
Please sign and return any comments to Sheri Wamhoff in the Development Review Center by
January 17, 1997. If we do not hear from you by this date, we will assume you have no
objections to the proposed vacation. Please call Sheri at 221-6750 if you have any questions.
Thank you.
No Problems
Problems/Concerns as follows:
Co
281 North College Avenue • P.O. Box 380 • Fort Collins, CO 80522-0580 • (970) 221-6605
City of Fort Collins
TO:
FROM:
DATE:
RE:
Transpo- stion Services
Engineering Department
I&IaunW \21911171
C-J )gVZY N U F-rr % -Tim �-PGL E- F 5C0
Sheri. Wamhoff, Development Review Engineer
December 31, 1996
REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of The Gateway at Harmony
Road PUD - Third Filing, located at the Northwest comer of Harmony Road and College Avenue
(SH287) just North of the McDonald's site. A portion of the existing 70 foot (from the south
property line) access, drainage and utility easement, and a portion of the drainage and utility
easement in the northeast corner of the property, as shown on the attached drawing, is being
proposed for vacation. The owner is requesting this vacation since a portion of the proposed
structure, as shown in the submittal for Maken II PUD encroaches into the existing easements.
Please sign and return any comments to Sheri Wamhoff in the Development Review Center by
January 17, 1997. If we do not hear from you by this date, we will assume you have no
objections to the proposed vacation. Please call Sheri at 221-6750 if you have any questions.
Thank you.
XNo Problems
Problems/Concerns as follows:
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
MEMORANDUM
TO:
FROM: Sheri Wamhoff, Development Review Engineer
DATE: June 8, 1998
RE: REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of the Gateway at Harmony
Road PUD, Third Riling, located on the west side of College Avenue just north of the
McDonalds at the northwest corner of Harmony Road and College Avenue. A portion of a
drainage easement, a portion of a drainage and utility easement and a portion of an access,
drainage and utility easement, as shown on the attached drawing, is being proposed for vacation.
The owner of the property is requesting the easement vacation due to a change to the building
layout. A minor amendment is being reviewed in which the building is being proposed to be
modified by the addition of an enclosed parking stall(s) along the western face of the building
(see attached revised building footprint). These space(s) would be used by an insurance company
for damage estimation and extend over existing easement.
Please sign and return any comments to Sheri Wamhoff in the Development Review Center by
June 26, 1998. If we do not hear from you by this date, we will assume you have no objections
to the proposed vacation. Please call Sheri at 221-6750 if you have any questions. Thank you.
No Problems �� „✓�— /� 3 Q
Problems/Concerns as follows: �/
46
4 6'
m�
70
r
ti
N 15' Access, Drainage
and Utility Eosement
N 00'06'47" E — 160.09'
S 00'06'47" W — 100.11'
10.00 10.11 o ,' 8G.00' --
N 00'06'47" E 80.00
10.00] 1n m v
m D O
Z o r
0:1�Nn A
to Z � ➢�0 II `10
Dy0 omzZ
0
p r-{A TO Co W_ II �O O0
--i0 A W NmZ to O NO
V II Z 01 N D O @ A
N m N V W m m D
D
ITT NN� f/1 m0 <D
o� D m m .Z.yD O mm D
N n Z n A D m
LO N O 0 G) o
ON N p p W m
O p m D
m O O Z
m z <D o
D_
D Z D
O D m
O 0
Dm
0 D
Z
0
N
C�
�o
m° u
3 O m
3°
V
O
O
u
,w
m
S 00'01 00 W - 115.60
SOUTH COLLEGE AVENUE
CLIENT _ SPRINGER INVESTMENT GROUP MESSNER
Engineering, Inc.
TITLE. EASEMENT VACATION EXHIBIT
LOT 3 OF THE GATEWAY AT Cm, ana Endronmenmi Englneenng conemwma
HARMONY ROAD P.U.O. THIRD FILING
FORT COLLINS. COLORADO 60 [. 29tn St.. S..ne Pia, Lo em,d, m 80538 Teie.(9I0)663-s]Pt
JUN -IF 98(THU1 14 06 124 WMAGNOLIA FT.CL TEL 919"0224-411
12 P 001
MEMORANDUM
TO: heity cn,
FROM: Sheri Wamhoff, Development Review Engineer
DATE: June 8, 11998
RE: REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of the Gateway at Harmony
Road PUD, Third Filing, located on the west side of College Avenue just north of the
McDonalds at the northwest corner of Harmony Road and College Avenue. A portion of a
drainage easement, a portion of a drainage and utility easement and a portion of an access,
drainage and utility easement, as shown on the attached drawing, is being proposed for vacation.
The owner of the property is requesting the easement vacation due to a change to the building
layout. A minor amendment is being reviewed in which the building is being proposed to be
modified by the addition of an enclosed parking stall(s) along the western face of the building
(see attached revised building footprint). These space(s) would be used by an insurance company
for damage estimation and extend over existing easement.
Please sign and return any continents to Sheri Wamhoff in the Development Review Center by
June 26, I998. If we do not hear from you by this date, we will assume you have no objections
to the proposed vacation_ Please call Sheri at 221-6750 if you have any questions- Thank you.
,'/No Problems
Problems/Concerns as follows:
MEMORANDUM
TO:
FROM: Sheri Wamhoff, Development Review Engineer
DATE: June 8, 1998
RE: REQUEST TO VACATE A PORTION OF AN EASEMENT
Attached for your review and comment is a sketch showing Lot 3 of the Gateway at Harmony
Road PUD, 'I,hird Filing, located on the west side of College Avenue just north of the
McDonalds at the northwest corner of Harmony Road and College Avenue. A portion of a
drainage easement, a portion of a drainage and utility easement and a portion of an access,
drainage and utility casement, as shown on the attached drawing, is being proposed for vacation.
The owner of the property is requesting the easement vacation due to a change to the building
layout. A minor amendment is being reviewed in which the building is being proposed to be
modified by the addition of an enclosed parking stall(s) along the western face of the building
(see attached revised building footprint). These space(s) would be used by an insurance company
for damage estimation and extend over existing easement.
Please sign and return any comments to Sheri Wamhoff in the Development Review Center by
June 26, 1998. Uwe do not hear from you by this date, we will assume you have no objections
to the proposed vacation. Please call Sheri at 221-6750 if you have any questions. Thank you.
XNo Problems
Problems/Concerns as follows: