Loading...
HomeMy WebLinkAboutFORT RAM VILLAGE PUD - Filed GC-GENERAL CORRESPONDENCE - 2003-02-07Page is too large to OCR. r NC Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226-4955 August 30, 1987 Glen D. Schlueter City of Fort Collins Storm Water Utility Department 300 LaPorte Avenue Fort Collins, Colorado 80522 RE: FORT RAM VILLAGE P.U.D., FIRST FILING Dear Glen: This letter is submitted to explain my understanding of the on - site storm drainage for Fort Ram Village P.U.D., First Filing. The drawings, as submitted, indicate the project will detain on - site stormwater runoff and discharge at a maximum rate as deter- mined by a 2-year historical condition. This site is upstream of the Larimer County Canal No. 2, and has historically discharged to the canal. However, because of the offsite drainage problems which have occurred in the basin, the Canal Company will not acknowledge acceptance of the design for onsite drainage. Therefore, it is my understanding that if Topanga Enterprises desires to start onsite construction prior to resolution of the offsite drainage, the City will accept a revised design plan for temporary total onsite stormwater retention, and they will not withhold building permits. If you find my understanding the same as yours, no response is necessary. However, if you do not agree please respond, immediately. Sincerely, RBD, Inc. /- irioyd G. McLaughlin Troject Manager �-cc: Ron Gray, Topanga Enterprises 236-001A Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado 3031574-3504 Deve. ,pment Services Engineering Department Citv of Fort Collins July 19, 1989 Mr. Ronald D. Gray Topanga Enterprises 5151 North Cedar Fresno, California 93710 RE: Fort Ram Village P.U.D., First Filing Dear Mr. Gray: After careful consideration, the City of Fort Collins will accept payment in the amount of $15,300.00 which will satisfy your obligation as Developer of Fort Ram Village P.U.D., First Filing to improve West Plum Street (to current City local street standards) from City Park Avenue to Constitution Avenue. The payment will satisfy the requirement of Section 2.D. (ii) of the Development Agreement. Upon receipt of your payment, building permits will no longer be held to secure this obligation. It is our plan to use the money and additional City funds to reconstruct the Plum Street pavement to add a crown to the street and to upgrade the pavement to satisfy City standards. Our plan is to do this construction next summer. I understand that there are still punch list items, not related to this issue of Plum Street paving, that must still be completed prior to the City accepting the public improvements. Please work with the construction inspector to take care of these items. If you have any questions or concerns, please call me. Sincerely, ``"Gary R. Diede Director of Engineering GRD/lt cc: David Klockeman Mike Herzig Dave Stringer ;011 1 11'01 tP Acenuo • P_O. Bov ;,So • Fort Collins, LO 80522-0580 • (303) 221-6605