r
NC
Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
303/226-4955
August 30, 1987
Glen D. Schlueter
City of Fort Collins
Storm Water Utility Department
300 LaPorte Avenue
Fort Collins, Colorado 80522
RE: FORT RAM VILLAGE P.U.D., FIRST FILING
Dear Glen:
This letter is submitted to explain my understanding of the on -
site storm drainage for Fort Ram Village P.U.D., First Filing.
The drawings, as submitted, indicate the project will detain on -
site stormwater runoff and discharge at a maximum rate as deter-
mined by a 2-year historical condition.
This site is upstream of the Larimer County Canal No. 2, and has
historically discharged to the canal. However, because of the
offsite drainage problems which have occurred in the basin, the
Canal Company will not acknowledge acceptance of the design for
onsite drainage. Therefore, it is my understanding that if
Topanga Enterprises desires to start onsite construction prior to
resolution of the offsite drainage, the City will accept a
revised design plan for temporary total onsite stormwater
retention, and they will not withhold building permits.
If you find my understanding the same as yours, no response is
necessary. However, if you do not agree please respond,
immediately.
Sincerely,
RBD, Inc. /-
irioyd G. McLaughlin
Troject Manager
�-cc: Ron Gray, Topanga Enterprises
236-001A
Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado 3031574-3504
Deve. ,pment Services
Engineering Department
Citv of Fort Collins
July 19, 1989
Mr. Ronald D. Gray
Topanga Enterprises
5151 North Cedar
Fresno, California 93710
RE: Fort Ram Village P.U.D., First Filing
Dear Mr. Gray:
After careful consideration, the City of Fort Collins will accept payment in the
amount of $15,300.00 which will satisfy your obligation as Developer of Fort Ram
Village P.U.D., First Filing to improve West Plum Street (to current City local
street standards) from City Park Avenue to Constitution Avenue. The payment will
satisfy the requirement of Section 2.D. (ii) of the Development Agreement. Upon
receipt of your payment, building permits will no longer be held to secure this
obligation.
It is our plan to use the money and additional City funds to reconstruct the Plum
Street pavement to add a crown to the street and to upgrade the pavement to
satisfy City standards. Our plan is to do this construction next summer.
I understand that there are still punch list items, not related to this issue
of Plum Street paving, that must still be completed prior to the City accepting
the public improvements. Please work with the construction inspector to take
care of these items.
If you have any questions or concerns, please call me.
Sincerely,
``"Gary R. Diede
Director of Engineering
GRD/lt
cc: David Klockeman
Mike Herzig
Dave Stringer