Western Area Power Administration
Rocky Mountain Customer Service Region NOTE -
RIGHT -OF -WAY USE APPLICATION
Date: May 1 1998
7'rcmsmission Line: Poudre-Richard's Lake 115-kV
A minimum clearance of
at least 12 feet from
the conductors must be
maintained at all times.
Description of Proposal (Narrative): 75' foot drainage channel on WAPA easement
Location: Section 1 Township 7N. , Range 69W. , 6th P.M. (Meridian)
County: Larimer State: Colorado
complete if' applicable: Subdivision Evergreen Park Second Filing ,Lot
Block City Fort Colli Colorado
PROFILE: Show the location, height (feet), and distance (feet) from the nearest transmission
line structure.
WAPA Structure WAPA Structure
No. 20/9---------- > <---------- No. 20/10
See Exhibit A, Page 2
PLAN: Show the location and dimensions (in feet) of the proposed facility in relation to the
center conductor of the transmissiion line.
ROW--------------------------------- ---------------- - ------------ --------------------------------------ROW
--
Transmission Line Transmission Line
See Exhibit A, Page 2 Centerline
�— WAPA Structure
WAPA Structure No change in elevation
No.20/9 ---------->----------- No. 20/10
ROW-------------------------------------------- - ROW
Show NORTH by arrow at (+) in block nwva nua
at left and show approximate location
in Section at right. swua seiro
Attach other drawings and information as appropriate.
R.J. DEVELCO
Address: 605 South College Avenue
Fort Collins CO 80524
Telephone No.: ( 970 ) CM-5059
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.
Page is too large to OCR.