HomeMy WebLinkAboutFRONT RANGE BAPTIST CHURCH MINOR SUB - Filed GC-GENERAL CORRESPONDENCE - 2009-01-06REVISION
COMMENT SHEET
DATE: January 12, 2005 TO: Engineering
PROJECT: #2-05 FRONT RANGE BAPTIST CHURCH
MODIFICATION OF STANDARD, TYPE II
All comments must be received by Bob Barkeen no later than the staff
review meeting:
January 26, 2005
Note --Please identify your redlines for future reference
Wrtt►onfila f(arrrrony Will 6e61ofaJ.
If PFA Vgi's ks +o kcL, ,y aryl a-.Q.r.�J,,,,�y access 4&xu,
If �1i (1 6,- (b a Q.QDwta 0s of n access aAk� to
v�lna,�ev e� s� and ds PFR 4CD6IQ_
"* 1?49w
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape City of Fort Collins
a
Project Comments Sheet
Selected Departments
City of Fort Collins
ent:
Date: January 21, 2005
Project: Front Range Baptist Church, Modification of Standards, Type II
All comments must be received by Current Planning, no later than the staff review
meeting:
January 26, 2005
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 2 Created: 1/21/2005
[1/21/051 FYI - With future development of this site, access onto Harmony will be closed. If
PFA wishes to have an emergency access where the current access is located, it will be
allowed as emergency access only, and will need to be reconstructed to whatever standards
PFA and CDOT require, and will require a CDOT permit to do so.
Also, ROW dedication and utility easement dedication will be required along Harmony.
Signature
-1124 d
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
p
Page 1