HomeMy WebLinkAboutRIGDEN FARM ELEVENTH BROOKLYN PARK ROW HOUSES - Filed DCP-DEV. CONSTRUCTION PERMIT - 2008-12-19City of Fort Collins
Transportation Services
Fni;ineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: Issuance Date: I 1
Project Name: Rit_den Farm Eleventh Filing (Brooklvn Park Row Housed
Project Location: _ southeast corner of Custer Drive and Iowa Drive
Permittee: Hearne Properties, LLC
City anti developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 300.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 2 702.80
Total $ 2,402.80
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 26,534_5-
Form of security deposited with the City: Check
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
I . The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. 'The Permittee
shall have an Hngincer prepare revised design drawings and secure City approval forall revisions to
the Clility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the CitV in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications ofthe City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineef' and
"Ingineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
V'nrNil`,II nu" • 1"1ltox`iRO • FnrtCollim(970)�^1-Gr�!l,i • 1AV070�.Z21-!",78
. �cictN f, hTpx Low
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name
Title
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted by the City to own and
maintain. In addition provide the value of all private infrastructure improvements that the City will
inspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: $_ 7 5 110
Private infrastructure, estimated cost:$ 1 (2 DoU•
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledee, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessary, to enter upon such property to perform work required of the applicant if the applicant were to
fail to perform the required Ny6rk. / 1
Applicant Signature: Date:
Development Construction Permit, Page 2/5
3. Construction time restrictions: N/A
4, The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(uti I ity plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient tojustify the granting ofthe extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion ofpublic improvements, or ifthere is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction ofall improvements shall be required prior
to the time of issuance of the first building permit.
S. Acceptance by the City of the public improvements shall be after (I) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City: and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. 'I lie warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land t Ise Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3 7(C) of the Land Use
('ode, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
plannect construction on this project. All required perimeter silt fencing and other erosion/sediment
control best manacement practices (BMP's) that can be installed prior to construction must be in
Development Construction Permit, Page 3/5
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading and construction access) shall be started in State Highway right-of-
way Limit a permit is issued by the Colorado Department of Transportation to allow such work to
begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit 1 acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
dclmcd in Section 1-2 of the City Code: and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
wort.. I also acknowledge that I have read this permit document with all its requirements and
conditions, and 1 agree to all of the terms and conditions so stated in this permit.
ApplicanVProject Manager' s Signature: �Z_,_ Date: ll-lGei�-
Approval for issuance:
�CityFrigineerApproval- ''i-,"7=�=���� Dale:
(P rmi Issuance Date)
Development Construction Permit, Paee 4r5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name:
City Staff Contact Persons:
Development Engineer:
Construction Inspector:
Current Planner:
Rigden Farm Eleventh Filing
(Brooklyn Park Row Houses)
Marc Virata, P.E. / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Lance Newlin / City of Fort Collins Engineering
281 N. College Avenue / Fort Collins, CO 80524
970 221-6605
Steve Olt / City of Fort Collins Current Planning
281 N. College Avenue / Fort Collins, CO 80524
970 221-6750
Water Utilities Engineer: Roger Buffington, P.E./City of Fort Collins Utilities
700 Wood Street / Fort Collins. CO 90521
970 221-6854
Erosion Control Inspector: Bob Zakely / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 221-6063
Natural Resources: Doug Moore / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
970 224-6143
Traffic Operations: Eric Bracke, P.E. / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 90524
970 224-6062
Street closures: Syl Mireles / City of Fort Collins, 625 Linden
Street, Fort Collins, CO 80524
970 221-6815
Development Construction Permit, Page 5/5
Transportation Planning: Dave Averill / City of Fort Collins, 215 N
Mason Street, Fort Collins, CO 80524
970 416-2643
Forestry: Tim Buchanan / City of Fort Collins, 281 North
College Avenue, Fort Collins, CO 80522
Light and Rower: Monica Moore / City of Fort Collins, 700 Wood
Street, Fort Collins, CO 80521
970 224-6150
Developer' Contact Persons:
Project Manager/ Kevin and Scott Hearne
Applicant/Developer/ Hearne Properties, LLC
Owner: P.O. Box 273462
Fort Collins, CO 80527
970 402-0312 (Scott) 970 402-0313 (Kevin)
970 226-4801 (f)
swheame@comcast.net
Project Engineer: Randall Provencio, P.E.
Interwest Consulting Group
1218 Ash, Suite C
Windsor, CO 80550
970 674-3300 (w)
970 674-3303 (f)
rprovencio@interwestgrp.com
Architect/Planner: Mikal Torgerson
MTA Architects PC
223 N. College Avenue
Fort Collins, CO 80524
970 416-7431
f
W
W
2
N
W
F
F
w
H
4)
0
O
Z
Q
N
W
F
H
Q
7
O
F
U
W
li
IL
0 0 0 o
�Moo
0 0 0 0 0 o
sg0000 0
o
a o 0 0 0 0
0000ao
?^
0 0 0 0
N ��
� O c� O O� Y>
rW fM nM ��.�-ffffffRRRRRRAAAAAAIIIIII
0 0 V 1 O o
e9MO V30 e9
W
N
W fA
fR Vi
Z
O
J
U
z
J U
.ti
�n
ti W
Qw
m
IL ui
Z
O LL
Z
O O O O O O
1` 0 N O O
0 0 0 0 0 0 0
r n A 0 0 0 0 0 O
a 0 0 0 y V
J
Z z p
Wdi HiM O�O�
v>v)He»uv�u)e)99w
vi vs w rA en r»
O 7 W L)
U
,. U)
W
U
W
;...! V W
wa>p�
w
,.l>
swam
W
w
w
�.
o�noo
�O f� OO
000 0000 0
OO LppL 00000
0000000
000 N000
F�
2
- 2
U
O 0 0
00 ry tll Vl
O O u O i 0 0 0 0
e9M O00000w
N N
O o O— 0 Y J 0
Ni lA f9� f9
U
W
_M ��
v
a
F
Z)
ty
rM Vl (h iA
iA NM M fA f9
NM
N
1
~
J
d
0 U) 0
1-w?U
�_
O
>
w
W
2
O i 0 0 0 0 0
O`\ 0 0 0 0 0 0
O O O n O N 0
F
f q 3
O
W
Z
W F-
� O O O
O 0 0 0 0 0 0
O O O N O N O
0
0 m
r.
F Q —
F- }
O O N (D
N fA fA W
o N 0 V).n YJ
N f0 f0 f� M Ol
0 0 f0 O O
IA IA 1A IA 19 V fA
V
Z w
U H K
UUjr
Q
`d m
bi �O I�
fn fR
N C'J N 1� m N N
dB N N 1A W W r;
fA
W W
]
N
F.O
N W
of eq r»
K O
]U
F..X
Q y w
0
U U
F
Z U)m
K �..
O
'
Z
W
LL O p LL
Z UUO
a
UQU
n.i
w
I-M
WLL
N N
W Z
Z W
FZ
VZ
m W
JJj
o
m —
3n
"' W f
a
~ow�
_p
Jz
pnOCw
FO
pzo
�oa
a
U) ZO
LL W
D
0)
l i l t}} U U
LL LL LL U U U U Q U U U
V) } LL LL LL}}
F
Z
JJUU W W
JJJ ww W W W W W
Jry)JJJ(n (n
�
LU
pf
U
C7F
U)Z_
U
J
mN
per
n.
w
Q
Z K
J
Z
o w
m j
C N
w F
f N
=
V
>
KZJ
°¢0
zYYc
zm
36
�m
E
w
aa
mO
a
o
c
~
a
a
jQ F
c
�'
(
cpV
Hm
K Q
NH7
rnammm
CN
>W
O
Zi
C C Um C
'
C
m
1L
5m
C F
a?
mW
(
Cgoe
3U�l-�ii2>2u3
ia.U❑a.¢
9mS00aU
ll
�'�Max
3
Imaan: 's_!
3 R
R
a
i
�
r
<
t v
P
i
IE—
f
J
.^,
_
�•�•
a yJK
¢
elm
Is
Sp
4
x
4
r - - v"' IOPIP160IN
(O fN5, C ]]IN FILING
2 O } .. I I UOOKIYN PARK NO1 OUM
1 ..JJJIII � IaKil�uiNs,mloanoo
v�
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/16/99)
For City use only: Application Number:.
INSTRUCTIONS:
Application Date:
Permit applicution fee: S 300.00
I. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer at 221-6750.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 No.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
�Op. I f1 i�/}R-�C 120w i-}OtnSES
Project A.K.A. (Marketing name if different from Project Name):
Project Location: S.E. C-ofllntrz- vDF CUs'teRDP-iVe a,,d Tow4
l7RI J2 _ 4 ,\ 1Z jo�d e ry 'FI/)_R rn
Property Owner(At the time of this permit issuance):
Individual Name: Kevi +;� ck Sca tt H-ERn-PJE-
Company Name: Ltd
Address: _ P•0. 3e)x IF - Co Ljlh1 (ap 9-0S2-7 _
Phone number(s):
Office:
Cellphone: 402-03 t Lt 07- 03 13
Fax number: Z 2(Q 4 F;p 1
Email: Sc,hQarw£ A Cu, cas-t; O-Rt
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing 'the Developer" in the Development Agreement for this
project):
Individual Name:
Company Name : Y(u)�2erhf s LLC _
Address: Ps-1K 2T34(-Z F-1-4olftn5 CCU YoSZ7 _
Phone number(s):
Office: _
Cellphone: i02 U3 ty
Fax number: 7-2-G i g0 1
Email:_ 5t,ihpa(-nc a) C6ca,at.net-
Permittee (Person who is to sign the Development Construction Permit):
Individual Name: SL4 t-�- H-' .Off_
Company Name : M`"^"" C , wPt' I
Address: _ 70 �, 0 Z 7, 4 6 2 ( f
Phone number(s):
Office: _
Cellphone: 002 O 312
Faxnumber: 22G 4x'o) _
Email: Sc.f hao r,r P; C.a. e—r. o-T
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person,
responsible for the design of this project, responsible for certification that improvements are constructed
in accordance with approved plans, responsible for making revisions to plans with City approval and for
providing as -constructed plans):
Individual Name:
Company Name: TTn
Address: J -.� I'd the l,' - C. W'OvL Js csr Co . S-G +ro
Phone number(s):
Office: to 7 } 33 00
Cellphone:
Fax number: (e-I y -330 3
Email: _
Professional License Number:
Architect/Planner (The person responsible for the site design of this project)
Individual Name: fvt k� ( "(O �
Company Name : m
Address. _ 2 IU cci tte 9 c live t 1 Cell i tis r o
Phone number(s):
Office: L41 to - 7 `131
Cellphone:
Fax number:
Email:
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement -add additional names below):
Individual Name: (C'z, =, o ad See{ _ i-h��f
Company Name: 14J 4?2'^r " trf-L�0_
Address: _ 7>0 _QAsr,_ �� Z L_
Phone number(s):
Office:
Ceilphone: 6/02 o31Z 4026313
Fax number: 7 2ro - ypol
Email: