Number:33 Created:8/29/2007 Resolved
[1013/07] The alley intersection with Hemlock must be constructed per LCUASS 7-1 F, Detail
1. Please show this reconstruction on the plans. LCUASS also requires 500 feet of
preliminary offsite design for the alley. See redlines for additional comments related to the
alley plan and profile.
[8129/07] No alley improvement design was submitted. The 20 foot alley off of Hemlock
must be improved to either 7-11 F or 7-12F and 500 feet of off -site preliminary design must
be provided. The alley intersection must also be reconstructed to the current standard.
Number:34 Created:8/29/2007 Resolved
[10/26/07] The cost estimates have been reviewed and some revisions to the unit costs are
requested. See the redline check prints for changes. Please include new revised cost
estimates with your next submittal. Future Access to South Improvements total $3,347.04
and Upgrade to Ultimate Roadway Section total is $8,284.80. These figures will be included
in the development agreement and collect at the time of building permit.
[10/3/07] The cost estimate provided is still under review at this time.
[8/29/07] The existing street flowline on College Avenue is not in the ultimate location. Any
new curb and gutter construction/reconstruction on College is only an interim condition.
This development will be required to escrow money for future ultimate curb and gutter on
College for the entire length of the College frontage. The College access will be
permenantly removed and replaced with curb and gutter in the future. The escrow payment
will required prior to the issuance of a building permit and will be specified in the
development agreement. The developers engineer shall prepare a cost estimate for the City
to review for design and construction.
Number:35 Created:8/29/2007 Resolved
[8/29/07] The detached sidewalk on College must be located in the ultimate location at the
ROW line so that it will not need to be removed when College is widened (when Vine is
relocated). The sidewalk will also need to be a min. of 6 feet wide to meet the arterial
standard. Due to the detention ponds location with respect to the ROW on College, a safety
hand rail will be required where the pond is adjacent to the sidewalk. It appears the overflow
weir will also need to be modified where the sidewalk conflicts.
Number:38 Created:8/29/2007 Resolved
[8/29/07] The detached sidewalk on College will need to extend all the way to the south
property line in the ultimate location with a type III barricate installed at the south end. This
will require the cross lot access dsign to change or narrow. If the cross lot access is reduced
to less than 20 feet wide it may need to be a one way controlled access with signage
Page 1
installed. Please indicate with your next submittal how this cross lot access to the south
adjacent parcel will function.
Number:39 Created:8/29/2007 Resolved
[10/3/07] The access driveway on College shall be constructed per LCUASS 707. There is
no pan used with this standard and the driveway is all concrete with radius flares. The
driveway must also intersect the street at 90 degrees.
[8/29/07] The College driveway access must be constructed per LCUASS DWG 707 with
ped ramps and connecting sidewalks on both sides. Please show and call out on the plans.
Number:40 Created:8/29/2007 Resolved
[8/29/07] The sidewalk on Hemlock should be straightened on both ends and standard
directional ramps should be installed at the alley intersection and across Hemlock at
College.
Number:41 Created:8/29/2007 Resolved
[8/29/071 A public access easement must be dedicated on the Plat and shown on the Utility
Plan drawings which connects the adjacent parcel to the south (cross lot access) to the
alley. The public access easement must be a minimum of 20 feet wide. Please see
redlines for clarification.
Number:44 Created:8/29/2007 Resolved
[8/29/07] Please show and label the approximate limits of street cut needed for utility
connections and add the standard street cut note to the plans.
Number:46 Created:8/29/2007 Resolved
[8/29/071 Please provide cross sections with the grading plan to show how the on -site
landscaped medians at the perimeter will tie into the existing grades will not drain water onto
the adjacent property.
Number:47 Created:8/29/2007 Resolved
[8/29/07] Please show the existing building location on the adjacent parcel to the south.
Number:48 Created:8/29/2007 Resolved
[8/29/07] The plans show a 2 foot sawcut to install curb and gutter on College. The
pavement will also need to be milled and overlayed to the nearest lane line along the length
of the street cut. Please show and label this on the plans.
Number:50 Created:8/29/2007 Pending
[1/8/08] A copy of the Notice To Proceed will be required prior to construction permit
issuance.
[10/26107] Same comment.
[10/3/07] No application has been submitted to CDOT as of 10-2-07.
[8/29/07] An access permit is required from CDOT. You may submit an application to
CDOT concurrently with the City review and the City will coordinate with CDOT such that the
access permit can be issued when the plans are approved.
Number:51 Created:8/29/2007 Resolved
[10/26/071 Same comment. See the Landscape Plan. Need to show dimensions for tree
planting on College. They look like they are centered in the parkway strip.
Page 2
[10/3/07] Street trees must be located such that they will not need to be removed when
College is widened. Please consult with Planning and locate the trees as close to the
sidewalk as possible.
[8/29/07] Please show the street tree locations on College on the Utility Plans. The
locationof street trees on College is important such that the trees will not need to be
removed or relocated when College is widened. Please space the the trees with respect to
the ultimate sidewalk location rather than centering them in the parkway between the
sidewalk and curb.
Number:52 Created:8/29/2007 Resolved
[10/3/07] Same comment
[8/29/07] Please revise the Site and Landscape plans accordingly to reflect all changes
requested on the Utility Plans related to sidewalks, ramps, on -site medians etc...
Number:56 Created:8/31/2007 Resolved
(8/31/07] The parking spaces off of College Avenue do not meet the minimum set back
requirement (measured from future flow line which is 16 feet from ROW). Please see
LCUASS Table 19-6 for set back requirements based on the ADT provided in the traffic
study submitted. Minimum set back is 50 feet but could be more based on ADT.
Number:57 Created:8/31/2007 Resolved
[8/31/07] As discussed in the staff review meeting, the cross lot access area (SE corner
near driveway) may be landscaped and money may be escrowed for future paving, curbs,
ramp and sidewalk. A detailed cost estimate must be prepared by the developer and
submitted for review. The escrow will be specified in the development agreement and will
be due at the time of building permit. The access easement will need to be dedicated on the
Plat to ensure a future connection can be made and utilized if needed.
Number:58 Created:8/31/2007 Resolved
[10/3/07] Please provide a note on the Plat regarding the interim nature of the College
access as dicussed in the October 2 meeting with the attorney. CDOT has indicated to me
that the conditional access permit they are providing for the College access is revocable
with only notification. No additional process will be warranted to close this access driveway
in the future when College improvements are completed.
[8/31/071 It is estimated that College improvements in front of this site may be started as
early as 2009 to accommodate the new Vine Drive alignment intersecting College Ave. This
may require widening College in front of this site to accommodate two left tun lanes onto
Vine. This will require the access on College to be permanently closed. Please provide a
bold note on the Plat that indicates that the City or CDOT may close the College access at
the time improvements are completed. This phase of College improvements may not affect
other parcels on College with existing access driveways ... not all accesses will likely be
closed at this time.
Number:84 Created:10/3/2007 Resolved
[10/3/07] Please update the month and year on the cover sheet of the Utility Plans. Revise
the signature blocks on all sheets to remove the Current Planning title on the bottom line.
Planning will not be signing the Utility Plans.
Number: 85
Created:10/3/2007 Resolved
Page 3
[10/3/071 An off -site temporary construction easement may be needed to construct the alley
improvements. Please provide a letter of intent from the property owners or a signed deed of
dedication prior to scheduling a hearing for the project.
Number:86 Created:l0/3/2007 Resolved
[10/3/07] There are still a few issues with drafting and labeling. Some line types and hatch
fills are too light and don't copy well. Please turn off the landscape layer on the Utility Plan
sheets. See rdlines for clarification.
Number:87 Created:10/3/2007 Resolved
[10/26/07] The handrail must be located on top of the retaining wall. If it is to located in the
sidewalk per the detail, you will need to add 6 inches of width to the sidewalk (6.5 foot width
sidewalk). See the detail and redlines for clarification
[10/3/07] A handrail must be placed along the detention pond adjacent to the new sidewalk.
Please show/call out the hand rail on the plans and provide a detail.
Number:88 Created:10/3/2007 Resolved
[10/26/07] There are still some line types that are not copying well because they are too
light. Please see the redlines for clarification.
[10/3/07] Please use a darker line type for all new/proposed sidewalks and ramps in the
ROW and label them as new or proposed.
Number:89 Created:10/3/2007 Resolved
[1013/07] Please show any existing sidewalk on the west side of the alley. Truncated domes
must be installed where the sidewalk crosses the alley on both sides.
Number:90 Created:10/3/2007 Resolved
[10/26/07] Please show the curb more clearly on the median planted island adjacent to the
alley. The curb should be located just outside the alley R.O.W. Please also revise the cross
section of the island to reflect curb on both sides.
[10/3/07] The landscaped medians along the alley should have a barrier curb on both sides
to prevent nuissance irragtion water from draining over the alley asphalt and degrading the
edge of asphalt.
Number:91 Created:10/3/2007 Resolved
[10/26/07] It has come to my attention that there is a recently approved and constructed
project just a little south of this proposed project. This approved project called THE HUMAN
BEAN has been constructed and the engineer had provided a preliminary off -site street
design for College Ave. extending to the north. Per LCUASS standards, you need to provide
1000 feet of off -site preliminary design for Advance Auto just as they did with the Human
Bean project. Rather than going 1000 feet, please just show how your preliminary off -site
design will tie into that done by the Human Bean project. I can help you obtain approved
plans for the Human Bean if needed. This may be completed with final compliance review
and does not need to be reviewed prior to a hearing.
[10/31071 The minimum flowline grade allowed is 0.5 percent. The College proposed
flowline shown is 0.2 percent. See sheet C6 profile.
Number:92 Created: 10/312007 Resolved
[10/3/07] Add a note to the plans stating that no part of the building foundation may extend
into the ROW on Hemlock.
Page 4
Number:93 Created:l0/5/2007 Resolved
[10/5/071 Please see Technical services Comments Regarding the Plat. Lot 2 should be
included on Plat Boundary area calculation. Need to also designate maintenance of Lot 2
on the Plat.
Number:94 Created:10/5/2007 Resolved
[10/5/071 Access and utility easement lines need to extend across Lot 2 to connect to
boundary with adjacent property.
Number:95 Created:10/5/2007 Resolved
[10/5/07] Need to adequately show existing grades and structures on the west side of the
alley to show if any off -site temporary construction easements will be needed to grade and
construct the alley as shown. Also needed to verify the proposed alley design will work with
existing structures. A letter of intent for any off -site easements will be needed prior to
hearing.
Number:102 Created: 10126/2007 Resolved
[10/26/07] The variance request for the reduced width alley has been denied as submitted.
Per my email to Lucy, the alley must be constructed to full standard width (20 feet) which will
require tree removals and easements for off -site grading and construction on the west side.
The variance will only be accepted if it clearly states that the reduced width alley is an
acceptable access to the site when the long term access control plan is implemented.
Number:103 Created: 10/2612007 Resolved
[10/26107] Alley design - the variance request has been denied as submitted. Vertical
curves do not meet LCUASS standards for minimum length. See LCUASS 7-17 & 7-1 a.
Please label and station in the profile what is being constructed with this project and what
will be built by others.
Number:104 Created: 10126/2007 Resolved
[10/26/07] Please label the alley intersection to be constructed per LCUASS DWG 803 and
7-11 F. Please add both of these details to the detail sheets.
Number:105 Created:10/26/2007 Resolved
[10/26/071 See other minor comments on the redlines.
Number:118 Created:1/8/2008 Pending
[1/8/08] Please clearly label the poles in the alley to be relocated or undergrounded by the
utility provider on all applicable sheets.
Number:120 Created:1/8/2008 Resolved
[1/8/08] The College Avenue street design does not tie back into existing road elevation in
the profile. As discussed previously, LCUASS requires that preliminary off -site design be
provided. This should be shown extending to the next intersection (Pinion) or 1000 feet,
whichever is less.
Number:125 Created:1/9/2008 Pending
[1/9/08] An electronic drawing for the College Avenue design was emailed to me on 1/8/08.
The plan and profile looks good but LCUASS requires cross sections every 50 feet for
arterials. You will need to provide approximately 4 cross sections of the ROW for the
Page 5
College Ave. frontage. You will only need to show the west half of the street from centerline.
Please indicate the cross slope from centerline to flowline on all cross sections.
Number:126 Created:l/9/2008 Pending
[1/9/08] At the south end of the new curb and gutter on College, please provide additional
asphalt to protect from undermining where the water leaves the gutter.
Number:127 Created:1/9/2008 Pending
[1/9/08] It has been determined that an access easement (cross lot access easement)
really is not required to extend from College to the alley to comply with the Access Control
Plan. The easement only needs to extend from the property to the south (Lot 6) to the new
driveway on College. This may eliminate the need for any special language on the Plat as
requested by the applicant. A meeting with the City Attorney may or may not still be needed.
Number:128 Created:1/9/2008 Pending
[1/9/08] Please see the redlines for other minor comments related to drafting, labeling etc..
Another formal round of review is not required however, a rivised paper copy should be
submitted with the redlines for final check prior to requesting mylars.
Number:129 Created:1/9/2008 Pending
[1/9108] It has come to out attention that the parking spaces on the south side of the project
have been reduced to less than the minimum required dimension of 9x19 feet. The spaces
need to be striped to the standard dimensions. This may not be an issue given the drive
aisle width of 24 feet can still be maintained and the access easement may no longer be
required.
Topic: Technical Services
Number:59 Created:8/31/2007 Resolved
[8131/07] E 1/4 misslabeled in legal on Plat.
Number:60 Created:8/31/2007 Resolved
[8/31/07] Add - Being a replat of ....... (see redlines)
Number:61 Created:8/31/2007 Resolved
(8/31/07] Show Hickory in Vicinity Map.
Number:62 Created:8/31/2007 Resolved
[8/31/07] Show how College ROW varies ... how was College dedicated (Plat of Riverside
Park)
Number:63 Created:8/31/2007 Resolved
[8/31/07] Line over text issues to be corrected on the Site Plan. See redlines for additional
minor comments.
Number:81 Created:10/3/2007 Resolved
[10/3/07] The basis of bearings statement is incorrect. Township and Range are incorrect.
Number:82 Created:10/3/2007 Resolved
[10/3/07] Please check the square footage of boundary. City staff calculates 28,500 not
27,930.
Page 6
Number:83 Created:10/3/2007 Resolved
[10/3/071 NW corner of Plat - monument not described
Number:112 Created:10/31/2007 Resolved
[10/31/07] Please defign the alley and the access easement on the Plat.
Department: Traffic Operations Issue Contact: Ward Stanford
Topic: Traffic
Number:68 Created:9/10/2007 Resolved
[9/10/07] Traffic Engineer for development requested a reduced "Minimum Off Street
Parking Setback Distance" from 75' (per LCUASS) to 50 feet. Reviewing the site and traffic
characteristics of the area I can support the request.
Number:69 Created:9/10/2007 Resolved
[9/10/07] Traffic also supports Engineering's comment ID # 58, regarding possible future
closure of the College access.