HomeMy WebLinkAboutSOMERVILLE PUD - Filed GC-GENERAL CORRESPONDENCE - 2008-08-01�kw n June 5, 1985 Miscellaneous Submittal Information Somerville P.U.D. Variance Fewest The cul-de-sac at the end of Somerville Court has a flowline to flowline diameter of 70'-0" and a right-of-way diameter of 88'-0". The overall length and width of the site together with the requirement for minimum street design of 25 mph and 54'-0" right-of- way width has seriously limited the site width available for units. The Design Criteria and Standards for streets indicates that a flow - line to flowline cul-de-sac diameter of 70'-0" is acceptable. The right-of-way width was determined by adding 9'-0" to each side of the street. (54'-0" street IOW minus 36'-0" street flowline-to- flowline divided by 2 equals 9'-0" additional ROW perside on the street). Although exact time lines are as yet undetermined, the sequencing of construction is anticipated as follows: The building located on Lots 15/16 would be constructed first to act as show units, followed by 19/20, 17/18, 13/14, 11/12, 9/10, 7/8, 5/6, 3/4 and 1/2. CITY OF FORT COLLINS ENGINEERING SERVICES June 25, 1985 Mr. William L. Neal Wheeler Realty 530 South College Fort Collins, Colorado 80524 Re: Proposed West Prospect S.I.D. Dear Bill: Thank you for your letter of June 20, 1985 informing us of your intent to form a Special Improvement District to improve Prospect Road from Taft Hill Road west to your west property line (approximately 220 feet west of the Pleasant Valley and Lake Canal). I have talked to the City's Water & Sewer and Light & Power Departments. There is a possibility that a new water line may be required in Prospect. Light & Power has a major vault on the south side of Prospect near Bauder School and will locate that as well as their existing and proposed improvements. I have talked to Columbine Cablevision. They have no problems in the area. Fort Collins -Loveland has a 20-inch water transmission line in Prospect that should be no problem for us. Poudre Valley R.E.A. has no equipment in that area. Public Service has a 4" gas main in the north side with a service line coming across at Bauder School. The City Engineer's office is requesting this street to be constructed to full arterial street standards on the south side and for one travel lane on the north side. This will result in curb, gutter and sidewalk on the south side with thirty-six feet of paving and no curb and gutter on the north side at this time. The petitioners, Wheeler Realty and Poudre R-1 School District, as well as the City's Storm Drainage Utility, will be expected to pay for the local street portion of the south half of Prospect. This would include curb, gutter and a four -foot sidewalk and eighteen feet of street (measured from the curb) to local street standards. The City's oversizing fund will pay for the extra eighteen feet of paving as well as the extra base and asphalt ENGINEERING SERVICES 300 LaPorte Ave.. P.0 Box 580 . Fort Collins. Colorado 80522 . (303; 221 6606 %W V William L. Neal June 25, 1985 Page Two associated with arterial street standards. The box culvert at Pleasant Valley and Lake Canal will have to be rebuilt. The costs for this will be divided between the District and the City's street oversizing fund with the District participating up to the local street half -width and the oversizing fund picking up the balance. Bill, this is a lot of preliminary detail but I like you petitioners to be aware up -front of the extent of the anticipated problems and the City's participation in these Districts. Do you plan to include the portion of Drake Road boardering Brown Farm 6th and 7th Filings in this District? I will submit your request to the S.I.D. committee at their next regularly scheduled meeting on July 11, 1985. Sincerely, Wd/e.� Maurice E. Rupel SID Coordinator "Illor led CITY OF FOIST COLLINS ENGINEERING SERVICES June 25, 1986 Brett Hall Hall -Irwin Construction Company 3026 4th Avenue Greeley, Colorado 80632 Re: Somerville P.U.D. Dear Brett: On June 18, 1986, I was contacted by the City Water and Sewer Department regarding the sanitary sewer main constructed by your firm in Somerville P.U.D. I was informed that your tie-in at the existing manhole in Hollingbourne Drive had items of concern to the Sewer Department. On June 23, 1986 I met with the TV crew on site to view these areas. At this time, we found that the bottom line at the drop manhole was infiltrating a significant amount of groundwater. Also, we observed that the 20 LF section of mainline between the drop manhole and MH-1 had an abrupt elevation change at the joint between these two manholes. I wasn't able to determine if this was the way the pipe was installed or if this section of pipe had settled or was damaged during the backfill operation. Please be informed that this pipeline was initially accepted by the City on April 23, 1986 and is therefore still under warranty by your company. I would suggest that the following actions be taken as soon as possible but not later than July 11, 1986 to correct the above problems. 1. Infiltration - Grout and repair as necessary to insure that no groundwater is entering the mainline. 2. Elevation Change - Contact me to set a time that we can meet at Somerville to observe this grade change. At this time we can discuss the acceptable alternatives for correcting this problem. ENGINEERING SERVICES 300 LaPorte Ave. • P.O. Box 580 • Fort Collins, Colorado 80522 • (303) 221-6605 it `.d Brett Hall June 25, 1986 Page Two Please contact me as soon as possible to set up a meeting. Also, feel free to call me if you have any questions or if I can be of any assistance to you regarding these matters. Sincerely yours, vll� Rodney R. Albers Construction Inspector cc: Ray Fisher Sewer Department Superintendent