Loading...
HomeMy WebLinkAboutSUNSTONE VILLAGE PUD FIFTH - Filed CS-COMMENT SHEETS - 2008-07-31PROJECT COMMENT SHEET City of Fort Collins DATE: 31 Oct 89 DEPARTMENT: ✓ ITEM: 57-86I SUNSTONE VILLAGE 5th - Final No Problems ✓ Problems or Concerns (see below) Date Signature �n�� r DEVELOPMENrSERVICES PLANNING DEPARTMENT 3001aPorte Ave. P.02= 580 Fort Collins. Colo OD522-0580 (303)221-6750 Citv of Fort Collins hill Plann TRAFFIC -ent Services partment MEMORANDUM FROM: Mike Herzig, Development Coordinator DATE: October 31, 1989 RE: Subdivision Utility Plans Submitted for your review and comment are utility plans for: Sunstone Village 5th Please respond by: Friday, November 10, 1989 `t `t3 rc)tv ;alp LaPorte .A\enue P.O. Box :;SO • Fort CL)hins. ',031 '_�1-�•,-�0 DeveloL,,,,,ent Services Planning City of Fort Collins November 17. 1989 Mr. Eldon Ward Cityscape Urban Design 3030 South College Avenue Suite 200 Fort Collins, CO. 80525 Dear Eldon: Staff has reviewed the Final P.U.D. plan for Sunstone 5th Filing and offers the following comments: The "Wall and Fence Covenant" states that fence along Caribou Drive may not exceed 5 feet in height and be of shadowbox design and setback a minimum of 3 feet from the sidewalk. Is this 3 foot distance accurate? The landscape plan indicates a distance of 6.5 feet from back of side- walk. Please clarify. 2. The landscaping along Caribou is commendable. Staff will coordinate the plantings with the locations of the underground utilities. As you know, discussions are underway with the City's Light and Power Department regarding the spacing between trees and buried electrical facilities. Also, please clarify the long term maintenance of this area. 3. There is a concern about the wetland design. While the amount of plant material is laudable, questions remain about the hydrology of the pond. In other words, will the pond work as a wetland? Perhaps it would be beneficial to prepare a feasibility analysis to ensure a long term wetland function. Also, long term maintenance will be an issue. Staff recommends further discussion in this area. 4. A 12 inch water main is existing in Caribou Drive. Water mains which will be built to serve the Fifth Filing must be connected to this existing main. 5. The Warren Lake Trunk Sewer (27 inch) is also existing in Caribou Drive. The sewer mains which will be built to serve the Fifth Filing must connect to this existing main. A repay is due on this sewer main. 6. A soils report is due to evaluate the pavement design. 7. Staff questions the 12 foot corner lot side setback specification. For homes along Caribou, cast of the landscaping, this 12 feet seems very minimal. Please reconsider this setback distance especially since Caribou is a collector street. 300 LaPorte \%enue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 V '"0 This concludes Staff comments at this time. Please call to discuss these comments at your earliest convenience. In order to stay on schedule for the December 18, Planning and Zoning Board hearing, please note the following deadlines: Plan revisions are due November 29, 1989 PMT's, colored renderings, 10 prints are due December 11, 1989 Final mylars and covenants are due December 14, 1989. As always, please call if there are any questions or concerns. Sincerely - Ted Shepard� Project Planner cc: Joe Frank, Assistant Planning Director Mike Herzig, Development Engineer